Supplemental Deficiency Rept CP-84-17 Re Flooding Analysis That Did Not Address Backflooding Via Drain Sys Piping. Initially Reported on 840816.Design Basis Document DBD-ME-007 Revised to Include Flooding Through Drain
ML20153D888
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/05/1988
From: Counsil W, John Marshall
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-84-17, TXX-88425, NUDOCS 8805090315
Download: ML20153D888 (2)


Text

.

u MEE log # TXX 88425

=.

File # 10110 903.4 7UELECTRIC Ref.#10CFR50.55(e)

IE*,OSdd, May 5, 1988 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION DOCKET N05. 50-445 AND 50-446 FLOODING CONCERNS SDAR:

CP-84-17 (SUPPLEMENTAL REPORT)

Gentlemen:

On August 16, 1984, in our report logged TXX-4263, we notified you of a deficiency regarding our flooding analysis, which did not address backflooding via drain system piping.

This item was subsequently identified by our letter logged TXX-6435, dated May 13, 1987 as an item for which a final report had been issued. However, the corrective actions require revision.

This report is submitted to status the implementation of corrective actions.

The original deficient condition was identified in TXX-4263 as backflooding from Room 113 into Rooms 115A,B,C and 0 in the Electrical and Controls Building.

Backflooding in these rooms has been reduced to an acceptable level by sealing holes in the No. 10 pump curb (Design Change Authorization 21075) in Room 113, and by installing floor drain covers (Design Change Authorization 20590) in rooms 115C and 0.

Design Basis Document DBD-ME-007, "Pipe Break Postulation Effects," has been revised to include back flooding through the drain system as a potential source of flood water.

Calculations of Unit 1 room flood levels have been completed, and walkdowns to determine interactions with essential equipment are underway.

This activity is being performed under Field Verification Method CPE-EB-FVM-SI-35, and is scheduled to be completed by September 15, 1988.

Necessary plant modifications identified from the results of the walkdowns will be completed prior to Unit 1 fuel load.

f 8805090315 880505 ADOCK05000g5 l

6 PDR O

g

  • U0 hath Ohn Strees LB81 Danes. Teses 73.'01 J

o

..a a

TXX-88425 May 5, 1988 Page 2 of 2 The Unit 2 flooding analysis and recessary plant modifications will be completed prior to Unit 2 fuel load.

Very truly yours, lo.C.Cownsu l W. G. Counsil By:

J. S. Marshall Generic Licensino Mariager CBC:grr c-Mr. R. D. Martin, Region IV Resident inspectors CPSES (3)

.