ML20153D688

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-456/86-05 & 50-457/86-04 on 860128-0204.No Violations Noted
ML20153D688
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 02/18/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20153D694 List:
References
NUDOCS 8602240217
Download: ML20153D688 (2)


See also: IR 05000456/1986005

Text

a

-

g.S

.

FEB 181986

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

-

Post Office Box 767

Chicago, IL 60690

,

Gentlemen:

This refers to the routine inspection conducted by Mr. R. Mendez of this office

on January 28 through February 4,1986, of activities at Braidwood Station,

Units 1 and 2, authorized by NRC Construction Permits No. CPPR-132 and

No. CPPR-133 and to the discussion of our findings with Messrs. G. E. Groth and

P. Barnes at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Consnission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

~~

C, %bal 0*;n:d by 0. J.' !Mrrisu

Wh

$

0

J. J. Harrison, Chief

Engineering Branch

Enclosure: Inspection Reports

No. 50-456/86005(DRS ;

No. 50-45 7/86004(DRS

See Attached Distribution

l

b

h

RIII

RII

f*'

RIII

Mendez/bls'

-Muffett

L ttle

Harrison

h

L, l4

}'f

kl0

'\\

J d o/

-.-

..

.

1._

!'

.

LCommonwealth' Edison Company

2

0 181986,.

s

Distribution

Tec w/ enclosure:

D. L. Farrar, Director

. of Nuclear Licensing.

M. Wallace, Project Manager

,

D. Shamblin, Construction

Superintendent

'E. E. Fitzpatrick, Station

Superintendent

C. W. Schroeder, Licensing and

Compliance Superintendent

DCS/RSB(RIDS)

,

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

'

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

,

l'

D. W. Cassel, Jr., Esq.

Control Division

J. W. McCaffrey, Chief, Public

Utilities Division

'

,

!

H. S. Taylor . Quality Assurance

Division

'

E. Chan, ELD

,

J. Moore, ELD

G. Berry, ELD

J. Stevens, NRR

3

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

7

i

)

1

1

!

<

f

-

m

. .

..

E

'