UNITED STATE 8
i
y
NUCLEAR REGULATORY COMMIS$10N
.
REOMPi 1
'
I
'
479 ALLENDALE ROAO
- $
KING OP PRutel A. PENNSYLVANIA 19400
,
August 23, 1988
Docket No. 50-336
Northeast Nuclear Energy Company
ATTN:
Mr. Edward J. Mroczka
Senior Vice President - Nuclear
Engineering and Operations Group
P. O. Box 270
Hartford, Connecticut 06101-0270
Gentlemen:
SUBJECT:
SPECIALIST TEAM INSPECTION 50-336/88-10 (MAY 10-17, 1988)
This refers to the special safety inspection conducted by an NRC E0P Inspection
Team on May 10-17, 1988, of activities authorized by NRC Operating License No.
ORP-65 for Millstone Unit 2, and to the discussion of our findings with the
members of your staff at the conclusion of the inspection.
The purposes of the inspection were to verify that your energency operating
procedures (EOPs) are technically accurate; that their specified act'ons can
be
meaningfully
accomplished
using
existing
equipment,
controls
and
instrumentation; and that available procedures have the usability necessary to
provide the operator with an effective operating tool.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination
of
procedures
and
representative
records,
observations
and
interviews with personnel.
Based on the results of this inspection, it appears that one of your activities
l
was not conducted in full compliance to previous comitments as discussed in
the enclosed Notice of Deviation (Appendir A).
In addition, your attention is
directed to a number of E0P technical concerns and deficiencies (Sections 3, 4
and 7 of the enclosed report).
These items were discussed with your staff
during the inspection.
We request that you formally transmit to Region I your
plans for corrective actions related to the deficiencies within 30 days of
receipt, of this letter.
in accordance with 10 CFR 2.790 of the Comission's regulations, a copy of
Gis letter and the enclosed inspection report will be placed in the NRC Public
bar.Mnt Room.
The responses requested by this letter and its enclosures are not subject to
the clearance procedures of the Office of Management and Budget as required by
the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
i
A
'
,
~
" ' ' " " " " " "
l
pr18sm 3;gggg
,i
-
. _ . _. - _ . - _
_.
.
-
. - - _ _ - - _
l
-
'.
.
.
.
Northeast Nuclear Energy Company
-2-
We will be pleased to discusr, any questions you have concerning this
inspection
Sincerely,
&
bY W
tobert M. Gallo, Chief
Operations Branch
Division of Reactor Safety
Enclosures:
1.
Appendix A - Notice of Deviation
2.
Appendix 8 - NRC Region ! Inspection Report 50-336/88-10
3.
Appendix ! - List of Procedures Reviewed
4.
Appendix !! - Technical Review Convents
5.
Appendix !!! - Human Factors / Writer's Glide Review Concents
6.
Appendix !Y - Verification / Validation Review Consnents
cc w/ enc 1:
W. D. Romberg, Vice President, Nuclear Operations
S. E. Scace, Station Superintendent
D. O. Nordquist, Director of Quality Services
R. M. Xacich, Manager, Generation Facilities Licensing
Gerald Garfield, Esquire
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
OFFICIAL RECORD COPY
i
,-
,
,
.
t
Northeast Nuclear Energy Company
-3-
'
bec w/ enc 1:
J. C. Gagitardo, Region IV
Perry Stewart, Region IV
<
J. O' Brian, Region Y
,
L. Defferding, Licenstag Examiner, PNL
C. Tolbert, Human Factors Specialist
S. Sun, NRR/SRXS
P. Bibb, Resident Inspector, St. Lucie
P. Habighorst, Resident Inspector, Millstone 2
Region I Docket Room (with concurrences)
Management Assistant DRMA (w/o enc 1)
DRP Section Chief
J. Shediosky, SRI Haddam Neck
W. Raymond, SRI. Millstone 3
D. Jaffe, LPM, NRR
R. Bores, DRSS
i
,
- % ghee
es,ee
OFFICIAL RECORD COPY
j
-
___
- -
_ _ - - - -
____ __
_.
- - _
- _ _ _
. - - _ _ _ - _ - -
. _ _ _ _ _ _ _ _
_______
_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -
.
i
E
.
i
i
TABLE OF CONTENTS
I
1.
Persons Contacted. . . . . . . . . . . . . . . . . . . . . . . . . .
2
2.
E0P/GTG Compari son . . . . . . . . . . . . . . . . . . . . . . . . .
2
-
3.
Independent Technical Adequacy Review of the E0Ps. . . . . . . . . .
4
-
4.
Review of Validation Program and Independent
l
Verification of the E0Ps . . . . . . . . . . . . . . . . . . . . . .
5
t
5.
E0P Training . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8
f
6.
On-Going Evaluation of E0Ps. . . . . . . . . . . . . . . . . . . . .
10
1
7.
Human Factors Analysis of E0Ps . . . . . . . . . . . . . . . . . . .
10
I
t
8.
Exit Interview . . . . . . . . . . . . . . . . . . . . . . . . . . .
19
!
APPENDIX I
-- List of Procedures Reviewed
,
!
APPENDIX !! -- Technic 6.1 Review Coments
!
APPENDIX III -- Human Factors / Writers' Guide Review Coments
l
APPENDIX IV -- Verification / Validation Review Coments
l
l
J
.,
__ _ .
_ _ _ - _ . , _ _ _ _ _ _ _
_ . - - -
_ _ _ _ _ _ _ _