Forwards Safety Insp Rept 50-336/88-10 on 880510-17 & Notice of Deviation.Attention Directed to Number of Emergency Operating Procedures Technical Concerns & Deficiencies
ML20153D438
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/23/1988
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20153D441 List:
References
RTR-NUREG-0899, RTR-NUREG-899 NUDOCS 8809020206
Download: ML20153D438 (4)


See also: IR 05000336/1988010

Text

.

.

UNITED STATE 8

i

y

NUCLEAR REGULATORY COMMIS$10N

.

REOMPi 1

'

I

'

479 ALLENDALE ROAO

  • $

KING OP PRutel A. PENNSYLVANIA 19400

,

August 23, 1988

Docket No. 50-336

Northeast Nuclear Energy Company

ATTN:

Mr. Edward J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06101-0270

Gentlemen:

SUBJECT:

SPECIALIST TEAM INSPECTION 50-336/88-10 (MAY 10-17, 1988)

This refers to the special safety inspection conducted by an NRC E0P Inspection

Team on May 10-17, 1988, of activities authorized by NRC Operating License No.

ORP-65 for Millstone Unit 2, and to the discussion of our findings with the

members of your staff at the conclusion of the inspection.

The purposes of the inspection were to verify that your energency operating

procedures (EOPs) are technically accurate; that their specified act'ons can

be

meaningfully

accomplished

using

existing

equipment,

controls

and

instrumentation; and that available procedures have the usability necessary to

provide the operator with an effective operating tool.

The enclosed copy of our inspection report identifies areas examined during

the inspection.

Within these areas, the inspection consisted of a selective

examination

of

procedures

and

representative

records,

observations

and

interviews with personnel.

Based on the results of this inspection, it appears that one of your activities

l

was not conducted in full compliance to previous comitments as discussed in

the enclosed Notice of Deviation (Appendir A).

In addition, your attention is

directed to a number of E0P technical concerns and deficiencies (Sections 3, 4

and 7 of the enclosed report).

These items were discussed with your staff

during the inspection.

We request that you formally transmit to Region I your

plans for corrective actions related to the deficiencies within 30 days of

receipt, of this letter.

in accordance with 10 CFR 2.790 of the Comission's regulations, a copy of

Gis letter and the enclosed inspection report will be placed in the NRC Public

bar.Mnt Room.

The responses requested by this letter and its enclosures are not subject to

the clearance procedures of the Office of Management and Budget as required by

the Paperwork Reduction Act of 1980, Pub. L. No.96-511.

i

A

'

,

~

" ' ' " " " " " "

l

pr18sm 3;gggg

,i

-

PDC

. _ . _. - _ . - _

_.

.

-

. - - _ _ - - _

l

-

'.

.

.

.

Northeast Nuclear Energy Company

-2-

We will be pleased to discusr, any questions you have concerning this

inspection

Sincerely,

&

bY W

tobert M. Gallo, Chief

Operations Branch

Division of Reactor Safety

Enclosures:

1.

Appendix A - Notice of Deviation

2.

Appendix 8 - NRC Region ! Inspection Report 50-336/88-10

3.

Appendix ! - List of Procedures Reviewed

4.

Appendix !! - Technical Review Convents

5.

Appendix !!! - Human Factors / Writer's Glide Review Concents

6.

Appendix !Y - Verification / Validation Review Consnents

cc w/ enc 1:

W. D. Romberg, Vice President, Nuclear Operations

S. E. Scace, Station Superintendent

D. O. Nordquist, Director of Quality Services

R. M. Xacich, Manager, Generation Facilities Licensing

Gerald Garfield, Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

OFFICIAL RECORD COPY

i

,-

,

,

.

t

Northeast Nuclear Energy Company

-3-

'

bec w/ enc 1:

J. C. Gagitardo, Region IV

Perry Stewart, Region IV

<

J. O' Brian, Region Y

,

L. Defferding, Licenstag Examiner, PNL

C. Tolbert, Human Factors Specialist

S. Sun, NRR/SRXS

P. Bibb, Resident Inspector, St. Lucie

P. Habighorst, Resident Inspector, Millstone 2

Region I Docket Room (with concurrences)

Management Assistant DRMA (w/o enc 1)

DRP Section Chief

J. Shediosky, SRI Haddam Neck

W. Raymond, SRI. Millstone 3

D. Jaffe, LPM, NRR

R. Bores, DRSS

i

,

% ghee

es,ee

OFFICIAL RECORD COPY

j

-

___

- -

_ _ - - - -

____ __

_.

- - _

- _ _ _

. - - _ _ _ - _ - -

. _ _ _ _ _ _ _ _

_______

_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -

.

i

E

.

i

i

TABLE OF CONTENTS

I

1.

Persons Contacted. . . . . . . . . . . . . . . . . . . . . . . . . .

2

2.

E0P/GTG Compari son . . . . . . . . . . . . . . . . . . . . . . . . .

2

-

3.

Independent Technical Adequacy Review of the E0Ps. . . . . . . . . .

4

-

4.

Review of Validation Program and Independent

l

Verification of the E0Ps . . . . . . . . . . . . . . . . . . . . . .

5

t

5.

E0P Training . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8

f

6.

On-Going Evaluation of E0Ps. . . . . . . . . . . . . . . . . . . . .

10

1

7.

Human Factors Analysis of E0Ps . . . . . . . . . . . . . . . . . . .

10

I

t

8.

Exit Interview . . . . . . . . . . . . . . . . . . . . . . . . . . .

19

!

APPENDIX I

-- List of Procedures Reviewed

,

!

APPENDIX !! -- Technic 6.1 Review Coments

!

APPENDIX III -- Human Factors / Writers' Guide Review Coments

l

APPENDIX IV -- Verification / Validation Review Coments