ML20153D405
| ML20153D405 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 02/14/1986 |
| From: | Fay C WISCONSIN ELECTRIC POWER CO. |
| To: | Harold Denton, Lear G Office of Nuclear Reactor Regulation |
| References | |
| CON-NRC-86-15 VPNPD-86-065, VPNPD-86-65, NUDOCS 8602240139 | |
| Download: ML20153D405 (1) | |
Text
fI O
Msconsin Electnc eowra couesnr 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI S3201 VPNPD-86-065 NRC-86-015 February 14, 1986 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D.-C.
20555 Attention:
Mr. G. Lear, Project Director PWR Project Directorate No. 1 Gentlemen:
DOCKET NOS. 50-266 AND 50-301 AUXILIARY FEEDWATER PUMP LOW SUCTION PRESSURE TRIP
_POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 By letter dated April 22, 1985, we informed you that control room indication of auxiliary feedwater pump suction pressure had been installed and operators had been instructed to manually trip auxiliary feedwater pumps on low suction pressure.
We also committed to provide low suction pressure automatic trip on these pumps by January' 31, 1986.
The purpose of this letter is to inform you that as of January 31, 1986, the automatic trips on low suction pressure have been installed.
Very truly yours, 7
60 af-C. W. Fay Vice President Nuclear Power Copy to NRC Resident Inspector 8602240139 840214
[
PDR ADOCM 05000266 P
PH p
-