ML20153D268
| ML20153D268 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 08/26/1988 |
| From: | Tucker H DUKE POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8809020148 | |
| Download: ML20153D268 (2) | |
Text
- - - - - - - - - - - - -
'l I
L.,, c,_,
SA iGJAR)S NORMAT0X "u s -
PO Box 331%
lire President Charkate, N C 2b242 hlee Productwn (TolniLIS11 CLASSRED GY:
DUKEPOWER NAMG*h -=
h-4 TITLEf AA D D.S PA*da W CnGtN!2AT10th AlAA ? bIAMA)S/A/G DATE' WM lPV August 26, 1988 f
f U. S. Nuclear Regulatory Commission Document Centrol Desk Washington, D.C.
20555
Subject:
Catawba Nuclear Station Docket Nos. 50-413 -414 Catawba Nuclear Station Security Plan Revision 21 (August 23, 1988)
Centlement Pursuant to 10CFR 50.54(p), please find attached the signed original and three copies of Revision 21 to the Catawba Nuclear Station Security Plan.
Revision 21 was developed to delete several redundant sections from the security plan, addresses search requirements and adds several new exceptions for lighting and accessibility to the tops of buildings.
Specific plan changes are addressed in the attachment. Revision 21 does not decrease the effectiveness of the Catawba Nuclear Station Security Plan.
This material is applicable to the security provisions of Catawba Nuclear Stations therefore, Duke requests that this material be withheld from public disclosure pursuant to 10CFR 73.21.
Very truly yours, THl3 DOCUMENT CONTAINS SATEGUARDS !!60RMAil0N.
- /M ANY PERSON YiHO Al!0RWWHO"'S e'!;LO3URE
'Y MAY BE CUILTY OF A CPHEa U10 l.!PON r0NYl; TION MAY BE PUNLSHED BY A Fl:iE 09 WPR:SONM~hT Hal B. Tucker OR BOTH UN9EA THE PROVISIONS OF 10 CFR 73 80 NUO2.D1/lce WHE?8 SEPV.Ain FMf1 F'Cl0TJm, Attachment fMCLE TE!3 00cV"DA AS L*COMROLLfJ wO oeQ xc: v/2 copies of attachment
$f Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission v> O Region 11 og P.O. Box 2203 Atlanta, Georgia 30301 oo w/ copy of attachment P. K. Van Doorn I
NRC Resident Inspector b
Catawba Nuclear Station SA G. AR JS
\\.01V A.
0.5 n
U. S. Nuclear Regulatory Commission August 26, 1988 Page Two bxc: w/o attachment R. L. Weber A. V. Carr A. R. Franklin R. M. Glover R. D. Madden T. B. Owen N. A. Rutherford P. G. LeRoy J. S. Warren GS-Security File - 801.01 T. A. Sanders (11) l l
THIS FOCUM!NT CONTAt'JS SUICUA7.8S INFN"Anfl0N.
AW P~PSOP! WHO ALLOWS ONAUTH.uf2D NS 1030%
i l
PA4Y BC CUR,7Y OF A CRlWEt AND llPO!! %'"/10Tl0N 1%Y Bf PUNCHED BY A FINE OR NP:t1Sor.NENT M BOTH tlN90t THE N0Yt310NS OF 10 CFR 73.N Y!:d fWO '.TED FRC't tv 10?,Tcli, WiCLE DfIS L 4L'.3113 CEGh1RCttto SA:EG. ARDS N:0RN A"'ON l