ML20153D167

From kanterella
Jump to navigation Jump to search
Discusses Equipment Qualification Insp Rept 50-423/88-04 on 880314-18 & Forwards Notice of Violation.One Violation Discussed at Enforcement Conference Re Qualification of Cable Has Been Reclassified to Unresolved Item.W/O Notice
ML20153D167
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/24/1988
From: Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
References
EA-88-177, NUDOCS 8809020064
Download: ML20153D167 (2)


See also: IR 05000423/1988004

Text

.

,-

AUG 24 M8

-

.

Docket No.

50-423

License No. NPF-49

EA No.88-177

Northeast Nuclear Energy Company

ATTN: Mr. E. J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject: EQ Inspection Report No. 50-423/88-04

This letter refers to the equipment qualification inspection conducted on

March 14-18, 1988 at the Millstone Power Station, Unit 3.

The inspection

report (NRC No. 50-423/88-04) was sent to you on July 6,1988.

Based on the results of that inspection it appears that certain of your acti-

vities were not conducted in full compliance with NRC requirements, as set

forth in the Notice of Violation, enclosed herewith as Appendix A.

At the time

of the inspection, two items (50-423/88-04-05 and 50-423/88-04-07) were identi-

fied as potential enforcement items.

Based on subsequent information furnished

by you at the Enforcement Conference, July 20, 1988, the NRC has categorized

these as violations in accordance with the "General Statement of Policy and

Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (Enforcement

Policy). Our determination considered that the unqualifiable Litton-Ve.m

connectors were only associated with position indication functions for contain-

ment isolation valves that were in different safety systems.

In addition, we

noted that you appropriately placed administrative controls over the valves and

that the v11ves were closed, thus, minimizing any safety significance. One

potential violation discussed at the enforcement conference (50-423/88-04-02)

relating to the qualification of GA HRRM cable has been reclassified to an

unresolved item based on information provided at the conference.

,

You are required to respond to this letter.

In preparing your response, you

should follow the instructions in Appendix A.

The responses directed by this letter and the accompanying notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

OFFICIAL RECORD COPY

EQ LTR MILLSTONE 88-04 - 0001.0.0

08/18/88

8809020064 880924

J

-

.

. .

.

.

Northeast Nuclear Energy Company

-2-

Your cooperation with us in this matter is appreciated.

Sincerely,

ORIGINAL. Slci'm "I

WILLIAf1 V. J0rmma

William V. Johnston, Director

Division of Reactor Safety

Enclosure:

Notice of Violation, Appendix A

cc w/ enc 1:

W. D. Romberg, Vice President, Nuclear Operations

0. O. Nordquist, Director of Quality Services

R. M. Kacich, Manager, Generation Facilities Licensing

S. E. Scace, Station Superintendent

Public Document Room (POR)

Local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, ORMA (w/o enc 1)

ORP Section Chief

S. Pindale RI, Beaver Valley

W. Raymond, SRI, Millstone 1&2

R. Ferguson, LPM, NRR

R. Lores, DRSS

J1

&

Cf4

6}(

h

L,

RI:0RS

Rl:0RS

RI:0RS</s

RI:E0

R

A

Paolino/ki/rw

Anderson

Johnsth

Holody

Russell

8/sf*/88

8/ / y/38

8// f/88

8/9/88

8/ M 8

.5/, . N,,,.J.,

e c4

f.,e v p J

(P,6 , o , f a

. .

0FFICIAL RECORD COPY

EQ LTR MILLSTONE 88-04 - 0001.1.0

08/18/88

9 /Y

I

.

.

.

  • . ,
,

,

APPENDIX A

NOTICE OF VIOLATION

Northeast Nuclear Energy Company

Docket No. 50-423

Millstone Nuclear Power Station, Unit 3

License No. NPF-49

As a result of the equipment qualification inspection on March 14-18, 1988, and

in accordance with the "General Statement of Policy for NRC Enforcement Actions,"

10 CFR Part 2, Appendix C, the following violation was identified:

10 CFR 50.49, paragraph (f) requires that each item of electrical

equipment important to safety be qualified.

Contrary to the above, on March 18, 1988 NRC inspectors identified

Litton-Veam connectors in safety related systems whose qualification had

not been adequately established for use in a harsh environment.

Forty three

Litton-Veam connectors were identified for which a definitive long-term

(i.e., 40 years) qualified life could not be determined with available

test results. However, sufficient test information was available for

un-aged connectors to demonstrate that these connectors would perform

their intended function for the near term until the June 1989 scheduled

refueling outage, at which time the licensee has committed to replace

these connectors.

Contrary to the above, on March 18, 1988 NRC inspectors identified

Litton-Veam connectors installed in safety related sys+. ems that did not

include the protective Raychem Heat Shrink Tubing specified in procedure

No. VAp-241. Two cases (four connectors), involving position indication

for two containment isolation valves, were found that were required to

remain functional to mitigate the event causing the local harsh

environment.

These items are a Severity Level IV violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, Northeast Nuclear Energy Company

,

is hereby required to submit to this office within thirty days of the date of

the letter which transmitteJ this Notice, a written statement or explanation in

reply, including: (1) the corrective steps which have bien taken and the

results achieved: (2) corrective steps which will be taken to avoid further

violations; and (3) the date when full compliance will be achieved. Where good

cause is shown, consideration will be given to extending this response time,

o

.

g

0FFICIAL RECORD COPY

EQ LTR MILLSTONE 88-04 - 0003.0.0

'

08/18/88

-