ML20153C239

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-267/86-01 on 860106-10.No Violation or Deviation Identified.Actions Taken Re Previously Identified Insp Findings Examined
ML20153C239
Person / Time
Site: Fort Saint Vrain 
Issue date: 02/12/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Lee O
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20153C242 List:
References
NUDOCS 8602190078
Download: ML20153C239 (2)


See also: IR 05000267/1986001

Text

- - _ __ ____ _____ __

. ..

FEB 121536

In Reply Refer-To:

Docket:

50-267/86-01

Public Service Company of Colorado

ATTN:

0. R. Lee, Vice President

Electric Production

P. O. Box 840

Denver, Colorado 80201-0840

Gentlemen:

This refers to the inspection conducted by Mr. Michael E. Skow of this office

during the period January 6 - 10, 1986 of activities authorized by NRC Operating

License DPR-34 for Fort St. Vrain Nuclear Generating Station, and to the

discussion of our findings with Mr. J. W. Gahm and other members of your staff

at the conclusion of the inspection.

4

Areas examined during the inspection included nonlicensed operator training,

fire prevention / protection program implementation, follow-up to NRC Inspection

Report 50-267/85-26, and follow-up to NRC review of Revision 3 to the FSAR.

Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and

observations by the inspector.

These findings are documented in the enclosed

inspection report.

Within the scope of the inspection, no violations or deviations were identified.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph 2 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Gna x!cened Gy

J. ti. Gadiardo

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosure:

Appendix A - NRC Inspection Report

50-267/

}-01

1

O

RPB/

RPB

/

%c,fRIV:RPB/A

// MESkow/tw

JPJa don

JEGagli rjo

2//,i, /86

4.-/h /86-

  • /1 /8,

7

\\9

Ie

I

-

.

m4

.

-

_

..

a

. .

Public Service Company of Colorado

2-

-

-

cc w/ enclosure:

I

J. W. Gahm, Manager, Nuclear

Production Division

Fort St. Vrain Nuclear Station

16805 WCR 19

Platteville, Colorado- 80651

L. Singleton, Manager, Quality

Assurance Division

(same address)

Colorado Radiation Control Program Director

bcc to DMB (IE01)

bec distrib. by RIV:

  • RPB

DRSP

i

  • Resident Inspector

R. D. Martin, RA

i

  • Section Chief (RPB/A)
  • RSB

,

!

  • Section Chief (RSB/ES)
  • M

E. Skow, RPB/A

.

  • R&SPB

!

  • MIS System
  • RSTS Operator
  • RIV File

,

f

  • w/766

i

,

a

1

4

4

.

l

i

,

Y

-

w

-

_a---+

-

a-.e-

_ .-

..--.e-y---.

=s

9

--

-p_y-

,_y4

,

p-,

- - -.

,qwww,,

-=.,-w,-m.-->-

-n

  • s-wv.-

%

y-

m.,-s.-.

  • -,

--y.,,9.w

y

+

-