n' OPEPAT'NG DATA REPORT I

Docket No.50-272 Date February 10, 1986 Telephone 935-6000 Completed by Pell White Extension 4455 Operating Status 1.

Unit Name Salem No. 1 Notes 2.

Reporting Period January 1986 3.

Licensed Thermal Power (MWt) 3338 4.

Nameplate Rating (Gross MWe) 1170 5.

Design Electrical Rating (Net MWe) 1090 6.

Maximum Dependable Capacity (Gross MWe)ll24 7.

Maximum Dependable Capacity (Net MWe) 1079 8.

If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A 9.

Power Level to Which Restricted, if any (Net MWe)

N/A 10 Reasons for Restrictions, if any N/A This Month Year to Date Cumulative

11. Hours in Reporting Period 744 744 75313
12. No. of Hrs. Reactor was Critical 711.2 711.2
13. Reactor Reserve Shutdown Hrs.

0 0

~

44896.6 3088.4

14. Hours Generator On-Line 686.8 6Es.o 43191.6
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 2462446 2262446 132746475
17. Gross Elec. Energy Generated (MWH) 753120 753120 44049130
18. Net Elec. Energy Generated (MWH) 722106 722106 41827598
19. Unit Service Factor 92.3 92.3 57.3
20. Unit Availability Factor 92.3 92.3 57.3
21. Unit Capacity Factor (using MDC Net) 90.1 90.0 51.5
22. Unit Capacity Factor (using DER Net) 89.0 89.0 51.0
23. Unit Forced Outage Rate 7.7 7.7 28.4
24. Shutdowns scheduled over next 6 months (type, date and duration of each)

Refueling, March 20, 1986, approximately 60 days

25. If shutdown at end of Report Period, Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved Initial Criticality 9/30/76 12/11/76 Initial Electricity 11/1/76 12/25/76 Commercial Operation 12/20/76 6/30/77 8-1-7.R2 Page of 7C#!

2190 2

/

R

//

AVERAGE DAILY UNIT POWER LEVEL Docket No.

50-272 Unit Name Salem # 1 Date February 10,1986 Completed by Pell White Telephone 609-935-6000 Extension 4455 Month January 1986 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET)

(MWe-NET) 1 1078 17 0

2 1080 18-620 3

1077 19 1081' 4

1077 20 1071 5

1074 21 1081 6

1080 22 1079 7

1080 23 1073 8

1060 24 1078

'9 976-25

'1081 10 1041 26 1074 11 1040 27 1084 12 995 28 1048 13 1075 29 1090 14 1065 30 1065 15 1053 31 478 16' 270 P.

8.1-7 R1

7 UNIT SHUTDOWN AND POWER REDUCTIONS Docket ' No. 5 0-272 REPORT MONTH January 1986 Unit Name Snlem No.1 Date Februnry 10,1986

' Telephone 609-935-6000

. Completed by Pell-White Extension 4455 Method of-Cause andl Corrective Duration Shutting License No.

Date Type Hours Reason Down Event System Component Action to 1

2 Reactor Report Code'4 Code 5 Prevent Recurrence WA

'HTEXCH Condenser Tube &

068 0112 F

2.2 A

5 Water Box Claning EB CKTBRK 4160 Volt Protection.

100 0116 F

26.0 A

3 Devices 102 0117 F

18.1 A

4 HA VALVEX Main Stop Valves Turbine 144 0131 F

13.1 A

3 CH VALVEX Feedwater Regulating Boiler level control valve 1

2 Reason 3 Method 4 Exhibit G 5 Exhibit 1 F: Forced A-Equipment Failure-explain 1-Manual Instructions Salem as S: Scheduled-B-Maintenance or-Test 2-Manual Scram, for Prepara-Source C-Refueling 3-Automatic Scram. tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report-G-Operational Error-explain 9-Other (LER) File (NUREG 0161)

H-Other-explain

p l

MAJOR PLANT MODIFICATIONS DOCKET NO.:

50-272 REPORT MONTH JANUARY 1986 UNIT NAME:

Salem 1 DATE:

February 10, 1986 COMPLETED BY:

J.

Ronafalvy TELEPHONE:

609/339-4455

  • DCR NO.

PRINCIPLE SYSTEM SUBJECT No major modifications completed this month.

l l

  • DCR'- Design Change Request

J.]

.i PSE&G SALEM GENERATING STATION J

SAFETY RELATED WORK ORDER' LOG SALEM UNIT 1 WO NO DEPT UNIT EQUIPMENT IDENTIFICATION 0099074630 1

BAT FILTER FAILURE DESCRIPTION:

U/1 BORIC ACID TRANSFER. FILTER IS CREATING RADIOLOGICAL PROBLEM AT THE ENTRANCE TO U/1 DIESELS.

DOSE RATES SHOW A HIGH" RADIATION.

CORRECTIVE ACTION:

REMOVED OLD FILTER.

INSTALLED NEW FILTER 8410280400 1

llCSil. VALVE

,-y FAILURE DESCRIPTION:

THE VALVE IS LEAKING BORATED WATER.

LEAK IS

/y$'n U

LOCATED'ABOVE THE SCHROUD ON THE DISCHARGE SIDE, CORRECTIVE ACTION:

REPACKED VALVE.

8509180261 1

12 WASTE GAS COMPRESSOR FAILURE DESCRIPTION:

MECHANICAL SEAL LEAK.

CORRECTIVE ACTION:

REPLACES SEAL

SALFM UNIT 1 WO NO DEPT UNIT EQUIPMENT IDENTIFICATION 8511110208 1

1-A D/G FAILURE DESCRIPTION:

WRITTEN TO COVER FAILED RETEST OF W/O 8506281369.

OIL IS STILL LEAKING FROM R-1 & R-4.

CORRECTIVE ACTION:

REPLACED PUMP GASKETS & INJECTION FIRE PORT GASKETS; TIGHTENED ALL FITTINGS.

8511190015 1

FEEDER BKR FOR RC19-3 FAILURE DESCRIPTION:

WITH 1BDE2AX11 OPEN THE 1RC19-3 CABINET REMAINS ENERGIZED.

THIS IS EVIDENCED BY A LOSS OF 1E5D CONSOLE INDICATION WHEN 1RC19-3-9S IS OPEN.

CORRECTIVE ACTION:

FOUND WIRING ERROR IN CABINET RESOLDERED WIRES TO CORRESPOND TO PRINT FOR CABINET ON 218515.

~

8601020151 1

14 S/G PRESS FAILURE DESCRIPTION:

14 LOOP PRESSURE CHANNEL HAS AC NOISE FOUND DURING CHANNEL CAL. SURVEILLANCE.

REWORK AS NECESSARY.

CORRECTIVE ACTION:

REPLACED CAPS C2, C3,C4, C6, C7, C8, AND C9 IN IN PM-545A.

ADJUSTED TO SPEC.

.e SALEM UNIT 1

~

WO NO DEPT UNIT EQUIPMENT IDENTIFICATION 8601130011 1

'12 BAT PUMP PUMP EXPERIENCED EXCESSIVE SEAL LEAKAGE AND THE SEALS FAILURE DESCRIPTION:

WERE SMOKING.

CORRECTIVE ACTION:

INSTALLED PUMP & SET NEW MECH SEAL.

8601180019 1

STATUS LIGHTS

' FAILURE DESCRIPTION:

PLEASE TROUBLE SHOOT ERRONEOUS HIGH FLUX TRIP INDICATION.

CORRECTIVE ACTION:

FOUND DIODE ON STATUS PANEL FOR IN42 25% TRIP SHORTED.

REPLACED DIODE ASSEMBLY.

STATUS PANEL INDICATIONS RETURNED TO NORMAL.

1N42 REMOVED FROM OPERATION DURING REPAIR.

s I

i

SALEM GENERATING STATION MONTHLY OPERATING

SUMMARY

- UNIT NO. 1 JANUARY 1986 SALEM NO. 1 The Unit began the period operating at full power.

On 1/09/86 at'1515

~

hours, power was reduced to 82% to remove a buildup of river grasses on the Traveling Screens.

Power was restored to 100% at 0450 on 1/10/86.

On 1/16/86 at 0638 hours0.00738 days <br />0.177 hours <br />0.00105 weeks <br />2.42759e-4 months <br />, the Unit tripped as a result of "High Negative Flux Rate on the 4/4 NI Channels".

This was caused by the insertion of Shutdown Banks "C" and-"D" as a result of a faulty backup power supply in the Rod Control Cabinet coincident with the inadvertent loss of 1A Vital-Bus.

Upon completion of investigations and repairs, the unit was synchronized with the grid on 1/18/86 at 0246 hours0.00285 days <br />0.0683 hours <br />4.06746e-4 weeks <br />9.3603e-5 months <br />.and was returned to full power operation.

On 1/31/86 at 1053 hours0.0122 days <br />0.293 hours <br />0.00174 weeks <br />4.006665e-4 months <br /> the Unit tripped due to Steam Flow / Feed Flow mismatch in

  1. 11 Steam Generator (i.e.,

Low Steam Generator Level with Low Feed Flow) as a result of partial ~ closure of valve 11BF19 (Steam Generator Feed Water Control Valve). The Unit was returned to service on 2/02/86 at'2157 hours0.025 days <br />0.599 hours <br />0.00357 weeks <br />8.207385e-4 months <br />.

p.

REFUELING INFORMATION DOCKET NO.:

50-272 COMPLETED BY:

J.

Ronafalvy UNIT NAME:

Salem 1 DATE:

February 10, 1986 TELEPHONE:

609/935-6000

-EXTENSION:

4455 Month January 1986 1.

Refueling information has changed from last month:

YES NO X

2.

Scheduled date for next refueling:

March 22, 1986 3.

Scheduled date for-restart following refueling:

May 20, 1986 4.

A)

Will Technical Specification changes or other license amendments be required?

YES NO NOT DETERMINED TO DATE B)

Has the reload fuel design been reviewed by the Station Operating Review Committee?

YES No

_X If no, when is it scheduled?

February 1986 5.

Scheduled date(s) for submitting proposed licensing action:

February 1986 if required 6.

Important licensing considerations associated with refueling:

NONE 7.

Number of Fuel Assemblies:

A)

Incore 193 B)

In Spent Fuel Storage 296 8.

Present licensed spent fuel storage capacity:

1170 Future spent fuel storage capacity:

1170 l

9.

Date of last refueling that can be discharged to spent fuel pool assuming the present licensed capacity:

September 2001 8-1-7.R4

- - y T

0 PSEG Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station February 10, 1986 Director, Office of. Inspection and Enforcement U.S. Nuclear Regulatory Commission Was.hington, DC 20555

Dear Sir:

MONTHLYlOPERATING REPORT SALEM NO. 1 DOCKET NO. 50-272 In compliance with Section 6.9,. Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of January 1986 are.being sent to you.

Average Daily Unit Power Level Operating Data-Report Unit Shutdowns and Power Reductions Major Plant Modification Safety Related Work Orders Operating Summary Refueling Information r

Sincerely yours, t/

6

)

J. M.

Zupko, Jr.

General Manager - Salem Operations JR:kcb cc:

Dr. Thomas E. Murley Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19406 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555

. Enclosures 8-1-7.R4 76LY The Energy People l

.,, - u a,