Interim Deficiency Rept DER 85-43 Re Lack of Compliance to Bechtel/Util Requirements for Class Q 1E Matls.Initially Reported on 851230.Final Rept Delayed Until 860228
ML20153C139
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/24/1986
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-34803-EEVB, DER-85-43, NUDOCS 8602180308
Download: ML20153C139 (3)


Text

o HECEIVED tec Arizona Nuclear Power Project 6 JW 27 PH 12r 59 P.O box $2034 e PHOENIX, ARIZONA 85072-2034 ANPP-34803-EEVB/TDS/DRLQ?,y1.2j y gp January 24, 1986 U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention:

Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects

..t Palo Verde Nuclear Generating Station (PVNGS) i Unit 3 Docket No. 50/530

Subject:

Interim Report - DER 85-43 A 50.55(e) Potentially Reportable Deficiency Relating To A Lack of Compliance to Bechtel/ANPP Requirements for Class.QlE Materials File: 86-019-026; D.4.33.2

Reference:

Telephone Conversation between R. C. Sorenson and T. R. Bradish on December 30, 1985

Dear Sir:

The NRC was. notified of a potentially reportabic deficiency in the ref-erenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30)' days, (January 26, 1986).

Due to the~ extensive investigation and evaluation required, an Interim Report is attached.

It is now expected that this information will be finalized by February 28, 1986, at which time a complete report will be submitted.

Very truly yours, 8602180308 860124 g //m PDR ADOCK 05000530 PDR E. E. Van Brunt, Jr.

g Executive Vice President Project Director EEVB/DRL/ldf Attachment cc:

See Page Two ll.

fE47 e

t?T%-

V,

?

Ye LANPP-34803-EEVB/TDS/DRL-92.12 January 24, 1986

- Mr. D. F. Kirsch DER 85 -Page Two i

cc:-

Richard DeYoung Director Office of Inspection and Enforcement.

U.,S. Nuclear Regulatory Commission Washington.

D'. C.

20555

('

J. G. Haynes (4060)

W. E. Ide.

(4074)

D. B.-Fasnacht (6330)

A. C.. Rogers (4056) h L..A. Souza.

(6195) l T. D. Shriver

-(6085)

H D. E.: Fowler (6260)

C. N. Russo (6330)

J. R. Bynum (6125)

J. M. Allen (6130)

D. Canady (6345)

A. C. Gehr (4141)

G.'A. Hierzer (6330).

W. G. Bingham (6330) 1R. W.' Welcher (Bechtel/Norwalk)

H. D. Foster

~(6330)

' D..R. Hawkinson (6330)

R. P. Zimmerman (6241)

M. L. Clyde

-(6079)

B.' T. Parker (6345)

J.~ Provasoli (4057)

D.

N.. Stover

,.(4082)

J. D; Houchen

-(6330)

J. E. Kirby (6501) l Records Center; lear' Power Operations Institute of Nuc 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 L

i 5

LL

~.

j i

i l

INTERIM REPORT - DER 85-43 POTENTIAL REPORTABLE DEFICIENCY ARIZONA NUCLEAR POWER PROJECT PVUCS UNIT 3 I.

Potential Problem Bechtel PSQD Audits conducted in November, 1985, at the Brown Boveri Tulsa, Oklahoma and Sanford, Florida facil-ities, identified a lack of compliance to Bechtel/ANPP requirements for Class "Q" IE materials. The deficien-cies include:

1.

Commercial grade items for Class "Q" IE applications are.not controlled by drawing revisions to support previous qualification reports.

2.

Certain Brown Boveri procurement documents to vendors do not contain all of the QA Program requirements imposed by 13-EM-017.

Further investigation of these deficiencies is currently in progress. A subsequent audit of the Tulsa, Oklahoma facility was conducted in January, 1986 and an audit of the Sanford, Florida facility is scheduled for early February, 1986. The vendor responses to the deficiencies identified to date are pending.

II.

Approach To and Status of Proposed Resolution Bechtel Engineering is currently awaiting Brown Boveri's audit finding respon

-a relating to the qualification concern. With this infermation, the Project can determine reportability and idtutify any required corrective action.

III.

Projected Completion of Corrective Action and Submittal of the Final Report The complete evaluation and Final Report are forecast to be completed by February 28, 1986.

_-