t IP/0/B/3050/26 Page 1 of 5 F04 YOU R

\!F0RV AT ON

== cow 2 c-MCGUIRE NUCLEAR STATION GROUNDWATER LEVEL LOOP CALIBRATION 1.0 PURPOSE To provide a safe and correct method of c.Jibrating and proving the {

operability of the Tech Spec related -toundwater level transmitters. '

2.0 REFERENCES

2.1 Source Documents 2.1.1 Duke Power Company Mechanical I&C McGuire 2.1.2 Technical Specifications 3/4.7.13 2.2 References That May Be Needed to Perform Procedure 2.2.1 MC 1449-01.04, Instrument Locations Auxiliary '

Building EL 716'-0" l 2.2.2 MC 2499-01.4, Instrument Location Auxiliary L.:ilding EL 716'-0" 2.2.3 MC 1499-WZ3, Instrument Detail Groundwater Level Monitors 1, 2, and 5 2.2.4 MC 2499-WZ3, Instrument Detail Groundwater Level Monitors 3, 4, and 6 2.2.5 IP/0/B/3234/04, Calibration Procedure for ITT Barton Model 273A j

2.2.6 IP/0/B/3250/08, Calibration Procedure for  ;

Hays-Republic V-5A Iidicators 2.2.7 IP/0/A/3250/13B, Calibration Procedure for Custom Components Pressure Switch Model 6832G1 3.0 TEST EQUIPMENT 3.1 Pressure indicator: minimum accuracy 10.1% of range 3.2 Pressure source 3.3 Multimeter, Simpson 260 or equivalent .

8808310183 DR 680825 ADOCK 05000369 PDC

0R YOUR 1,,0,,,3050n.

V 0 RMA" 0 \ _

4.0 PREREQUISITES 4.1 Verify Working Copy of this procedure with Control Copy.

4.2 Before removing equipment from service, obtain approval from Control Room SRO AND Reactor Operator at the Controls (ROATC).

4.3 Verify Test Equipment Cal Due Date is current and record on Enclosure 11.1.

4.4 If required, obtain Radiation Work Permit (RWP).

4.5 Independent Verification (IV) has been incorporated into this procedure.

NOTER All IV sign-offs shall be on Enclosure 11.1.

IV Reg'd 4.6 Verify all prerequisites have been met AND sign off on Enclosure 11.1.

5.0 Q.MITS AND PRECAUTIONS 5.1 Use appropriate precautions to avoid injury from high voltage, pressure, radiation, temperature or radioactive contamination in work area.

5.2 Sections of this procedure that do not apply to work being '

performed may be sirked NA; 5.3 If impulse line is found blocked, not.'fy 1AE supervisor or WZ system engineer.

6.0 UNIT STATUS '

i This procedure may be perfore:d in any mode; however, Control room  !

SRO will determine equipment availability.

7.0 GENERAL DESCRIPTION Groundwater level transmitters are used to monitor groundwater level our. side the auxiliary Nailding. Each transmitter loop provides local indication and Control Room altres.

8.0 MAJOR COMPONENTS 8.1 Barton 273A Transmitter 8.2 Hays-Republic V-5A Indicator 8.3 Custon Components 6832G1 Pressure Switch 1

F

(

FOR YOUR IP/0/B/3050/26 t gh{I Page 3 of 5 9.0 EQUIPMENT SPECIFICATIONS 9.1 Barton Transmitter, Model 273A

9.1.1 Input

0 - 240 INWC l

9.1.2 Output

3 - 15 PSIG '

9.1.3 Accuracy

10.5%  !

9.1.4 Output increases on increasing differential pressure (D/P) 9.2 Hays-Republic Indicator, V-5A

9.2.1 Input

3 - 15 PSIG

9.2.2 Output

0 - 20 ft

9.2.3 Accuracy

12%

j 9.3 Custom Components Pressure Switch, Model 6832G1

9.3.1 Input

3 - 15 PSIG

9.3.2 Output

Set / Reset

9.3.3 Accuracy

11%

10. PROCEDURE l

i 10.1 Initial Conditions l

10.1.1 If necessary, have Control Room SRO declare equipment being tested inoperable AND log in TECH SPEC LOGBOOK.

10.1.2 Befcre removing equipment from service, notify ROATC.

10.1.3 Record general information on Enclosure 11.1.

IV Reg'd 10.1.4 Before beginning maintenance or testing on any component, verify correct component per Work Request. l 10.2 Removal From Service '

IV Reg'd 10.2.1 Close instrument isolation valve.

10.2.2 Remove test tee cap or discon ect tubing at HI side of transmitter.

I 1

0 20.1YOL1 -

I,,0,,,3 03 0,u

Page 4 of 5 10.3 Calibration i 10.3.1 Connect pressure source and pressure indicator to transmitter.

10.3.2 Apply inputs per Enclosure 11.2 AND record AS FOUND data.

10.3.3 IF all AS FOUND data are within tolerance, record AS FOUND data in AS LEFT column AND so to Section 10.4.

l 10.3.4 E all AS FOUND data are not within tolerance, i determine reason for out of tolerance.

l A. If transmitter is out of tolerance, calibrate l per IP/0/B/3204/04.

B. If indicator is out of tolerance, calibrate per IP/0/B/3250/08.

C. If pressure switch is out of tolerance, 1 calibrate per IP/0/A/3250/138.

D. If Control Roosi annunciator does not respond I properly, troubleshoot per IP/0/A/3090/02.

10.4 Impulse Line Check i

IV Reg'd 10.4.1 Open BOTH isolation valves. l l

l 10.4.2 Connect regulated supply air or hand pump to  !

transmitter.

CAITTION, Pressure >11 PSIG may damage transmitter, i 10.4.3 Verify impulse line is connected to transmitter i

AND all other openings are capped.

1 NOTE: Following step may be verified by audible air flow through penetration or inability to build pressure on impulse line.

10.4.4 Apply sufficient preasure (not >11 PSIG) to verify impulse line is open.

A, IF, impulse line is open, so to Section 10.5.

B. E impulse line is blocked, contact WZ system engineer for further instructions. '

l l

1 4

- , > -,,,n,

- - - -. - ~ - - . ,,.-m -m.- . .---,r,---.,,,s .n - --m- g- --- ,. s, -,---. --

~

l I

FOR 7

YOUR IP/0/3/3050/26 l Page 5 of 5 I

l /h l

10.5 Return to Servita l 10.5.1 Disconnect test equipment.

l IV Reg'd 10.5.2 Install test cap AND reconnect tubing. l l

IV Reg'd 10.5.3 Verify both isolation valves are open.

10.5.4 Notify ROATC and Control Room SRO that loop has l been returned to service.

)

11.0 ENCLOSURES i l

l 11.1 General Data j 11.2 Loop Calibration Data l l

l l

1

o ,i j 4' .

o '

i 4 I

-Q V 7 I\yp~'5 lVw S

IP/0/B/3050/26 I

j Enclosure 11.1  ;

lNFORMAT Di\ de l GENERAL DATA TEST EQUIPMENT USED ,

1 MANUF. I MODEL NO. l MNS NO. l CAL. DUE l l l l I l ,

I I I I l l

l 1 1 I I l l l . I l l 1 I I I I TEST EQUIPFJr SIGN-OFF VLRlFICATION I l

LOGGED OUT /

LOGGED IN /

l IV SIGN-OFFS STEP 4.6 Prerequisites completed / IV

, /

10.1.4 Correct component verified / / IV 10.2.1 Isolation valvo closed IV

/ _/

10.4.1 Both isolation valves open / / IV 10.5.2 Tubing and capa installed / _ / IV 10.5.3 Both isolation valves open __/ / IV

m.

l l l ll l l l l lll l l ll T _

S F _

A E _

L 62 l l l l l l l l l l l 2 _

/1 01 D _

5 N 0 e S U 3 r

/ u A O F

2s _

/ o 0l l l l l l l l l 8 l l

/

P n I Ec1 0 5 5 5 5 5 5 55 E 0 5 C 5 0 5 0 5 0 C 1 1 2 1 1 C N W

1 R A o o t t oo t t o o o t t t t oo t llllIl l ll l l lll F E L 5 5 5 5 5 5 5 5 5 r O o c  : T 0 4 9 4 9 4 J 4 0 t i S - 1 1 1 - a l T i) b I cJ u N n(

p U l l l l l l l l l l l u e n R T D n S - U E 0 0 0 0 0 0 0 0 0 A P s A P R Z y S T I 0 5 0 5 0 5 0 5 0 ll ll ll ll ll l l l l W a - U S 1 1 2 1 1 G

_ M V O E I A D S T P A l l l l l l l l l l l l l l l l t D 0 sf N 0 Ae T L O S F 3 I

T A E L o A t ll R .

ll l i l l l l ll l l B 4 t I l l l l l l L

l l l l l 9 e A s d C 2 e n D r su P N f Ao S U ol F O A O l O F ti L

uw p ll ll l I l l ll l l l l l l l l l l l l l l l t m ur 0 6 6 6 6 6 6 6 0 oa ) )

l ) ) ) 6 6 0 0 0 0 0 0 0 0 0 ra 6 6 6 E 3 6 9 2 5 2 9 6 3 f t o 6 3 C t 8 t6 4 3 t 5 4 5 1 1 1 r 3 3 G N 1 1 I A o o o o o o o o o dele d e

C Wo 0 C C W o Wo Wo W o C C S R t t t t t t t t t tA r Nt Nt Nt Nt Nt N P E L

O 4 4 4 4 4 4 4 4 4 re 9 9 9 9 9 9 9 9 9 b r a i s

I 4

> I 4

I 4

I 4

I 4

O i S

T .

2 5 8 1 4 1 8 5 2 l s i u D e 5 1

3 39 2

0 36 3

59 0

56 T 1 1 1 an ( (

2 1 4

(

1 4 _

T I N ce 1

(

1

(

A U l l l l l l l l l l l eo bt T T T M S n T o L t A T

U P

D E G 9 R I 7 7 9 l t T

E E

S E

T E

E S

E T

E E

S E

R Z r 3 a 7 T

U I

S P S 2 69 2 5 2 1 1 1 9 6 2 ap l u h n ll S

I l l l R S ll l l R S l l l l R _

O W_B 2 O E

  • si .

D r r rl F l I l l l l l l l l l l l l ll rC eW t e e ee NI S

T C 0 0 0 0 00 0 0

0. i tN tI a

w 1 t

al we2 t v ae wL*

I W 0 0 0 0 0 0 0 m d . d v d .

0 0 m0 re nee o n N N U I 6 2 8 4 8 2 6 1 1 2 1 1 s

nh am ntE ur - uL -

niE uH -

D N o l a oe8 o 8 o 8 _

I . i l l 1 l at AN rl D rid rid f l t T E l l l l l l l ri GAA GMA GHA e u e a U F G Tw k n d c P O N 0 5 0 5 0 5 0

  • l lll llll ll lll l u a o o N A 2 5 7 0 7 5 2 5 0 D M M L I %R 1 ll ll lll l lll ll lll O

a w

, ~_

wa amye f l- p t TABLE 2.4.13-1 McGuire Nuclear $tation Groundwater Level Monitors Technical Specification Monitors Location Interior / Exterior Unit Auxiliary Building PP-51 Interior l' Auxiliary Building QQ-56 Interior 1&2 Auxiliary Building PP-61 Interior 2 Auxiliary Building West Wall Exterior 1 Maintenance Staging Building Exterior 2 1

Non-Technical Specification Monitors Location Interior / Exterior Unit '

Reactor Building West Wall Exterior 1 Diesel Generator Building AA-40 Interior 1 Diesel Generator Building DD-42 Interior 1 Reactor Building East Wall Exterior 2 Diesel Generator Building BB-72 Interior 2 Diesel Generator Building DD-69 Interior 2 i

l 1

1 l

l 6

1 1 of 1 i

DRAFT l APPENDIX 2B GROUN0 WATER HYOROLOGY McGUIRE NUCLEAR STATION FSAR OUKE POWER COMPANY t

)

1 f

i

[

PREPARED BY LAW ENGINEERING TESTING COMPANY CHARLOTTE, NORTH CAROLINA ,

NOVEMBER, 1973 i

28-1 12/83 i

7, 0

.N 3 ?

, / -ma ew

{ I GROUNDWATER HYOROLOGY TABLE OF CONTENTS Page 1 REGIONAL GROUNDWATER HYR00 LOGY 2B-1 1.1 WELL SURVEY 28-1 <

2 SITEGROUNDWATfpHYDROLOGY 28-1 2.1 GROUNDWATER LEVELS 28-2 2.2 SPRINGS AND SURFACE DRAINAGE 2B-2 2.3 PERMEABILITY 2B-2 2.4 MOVEMENT OF GROUNDWATER 28-3

2. 5 0UALITY OF GROUN0 WATER 28-3 2.6 ION EXCHANGE POTENTIAL OF SOIL 28-3 2.7 GROUN0 WATER RISE FOLLOWING POSTULATED UNDERDRAIN FAILURE 28-5 3 GQEklLil2][1 2B-5 l

l I

l 2B-11 12/83 I

\