Forwards Insp Repts 50-321/85-38 & 50-366/85-38 on 851221-860117.No Violation or Deviation Noted
ML20153B955
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/06/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20153B957 List:
References
NUDOCS 8602180207
Download: ML20153B955 (1)


See also: IR 05000321/1985038

Text

-

O co w

,

-

bM

FEED 61986

Georgia Power Company

' ATTN: Mr. R. J. Kelly

Executive Vice President

P. 0. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: REPORT NOS. 50-321/85-38 AND 50-366/85-38

On December 21,.1985 - January 17,198' NRC inspected activities authorized by

NRC Operating License Nos. DPR-57 s.. NPF-5 for your Hatch facility. At the

conclucion of the inspection, the findings were discussed with those members of

your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

>

Sincerely,

ORIGINAL SIGNED BY

VIRGJL L BROWNLEE

Virgi. L. Brownlee, Lnief

Reactor Projects Branch 3

Division'of Reactor Projects

Enclosure:

Inspection Report Nos. 50-321/85-38

and 50-366/85-38

cc w/ encl:

J. T. Beckham, Vice President'and

General Manager-Nuclear Operation

H. C. Nix, Site General Manager

P. E. Fornel, Site QA Supervisor

L. Gucwa, Chief, Nuclear Engineer

bec w/ encl:

NRC Resident Inspector

Hugh S. Jordan, Executive Secretary

'

, Document Control Desk

State of Georgia -

RII RII 6j2180 f 321

PHolmes- ay:bhg AIgnat nis