ML20153B895

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-454/86-03 & 50-455/86-03 on 860107-10.No Violations Identified
ML20153B895
Person / Time
Site: Byron  Constellation icon.png
Issue date: 02/13/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20153B899 List:
References
NUDOCS 8602180189
Download: ML20153B895 (2)


See also: IR 05000454/1986003

Text

rm

%

0

FEB 13 1986

Docket No. 50-454

Docket No. 50-455

Commonwealth Edison Company

ATTN: Mr. Cordell Reed-

Vice President

Post Office Box 767

Chicago,'IL 60690

Gentlemen: .

This refers to the routine safety inspection conducted by Messrs. R. Smeenge

and A. S. Gautam of this office on January 7-10, 1986, of activities at Byron

Station, Units 1 and 2 authorized by NRC Operating License No. NPF-37 and NRC

Construction Permit No. CPPR-131 and to the discussion of our findings with

Mr. Klingler and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas,-the inspection consisted of a selective

examination of procedures and representative records, observations, and~

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations,.a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

~

Ccial..1 C:; = J by J. J.' I c.:

J. J. Harrison, Chief

Engineering Branch

Enclosure: Inspection Reports

No. 50-454/86003(DRS) -

No. 50-455/86003(DRS) 0602180199 8602

ADOCK 0 54

gDR PDR

See Attached Distribution

.

RIII RIII RIII RIII RI

Smeenge/mj

/t fCT

Gautam

M

Muffett Forney Harrison

4 cit (c O

I

,1

-

f E0/

e:

..

. Q'

'

Commonwealth Edison Company. 2

bistribution

cc w/ enclosure:

D. L. Farrar,' Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Quecio, Plant Manager.

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector,-RIII Byron

. Resident-Inspector, RIII

Braidwood

Phyllis Dunton, Attorney-

General's'0ffice, Environmental

Control-Division

D. W.' Cassel, Jr., Esq.

Diane Chavez, DAARE/ SAFE

Steve Lewis, ELD

L. 01shan, NRR LPM

,

H.. S. Taylor, Quality Assurance

Division

.

-,

_