ML20153B754

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-321/88-20 & 50-366/88-20 on 880620-24.No Violations or Deviations Noted
ML20153B754
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/18/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20153B756 List:
References
NUDOCS 8808310075
Download: ML20153B754 (2)


See also: IR 05000321/1988020

Text

.

[

,.

AUG 181988

-

-

,

j

t

Docket Nos. 50-321, 50-366

1.icense Nos. DPR-57, NPF-5

Georgia Power Company

ATTN: Mr. W. G. Hairston, III

Senior Vice President -

Nuclear Operations

P. O. Box 4545

L

Atlanta, GA 30302

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-321/88-20 AND 50-366/88-20

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

C. Smith on June 20-24, 1988. The inspection included a review of activities

authorized for your Hatch facility. At the conclusion of the inspection, the

findings were discussed with those members of your staff identified in the

'

enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

i

activities in progress.

'

]

Within the scope of the inspection, no violations or deviations were identi-

l

fied.

'

Your attention is invited to the unresolved item identified in the inspection

report. This matter will be porsued during future inspections.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

.,

l

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

I

Sincerely,

!

Alan R. Herdt, Chief

Engineering Branch

Division of Reactor Safety

Enclosure:

NRC Inspection Report

'

i

cc w/ encl:

(See page 2)

4

il

8808310075 880910

DR

ADOCK 0500

1

-

ZFel

.

_

.

-

.

o

.

,

'

AU618 mg

'

-

.

.

,

Georgia Power. Company

2

'

4

cc w/ encl:

R. P. Mcdonald, Executive Vice President,

Nuclear Operations

3

J. T. Beckham, Vice President, Plant Hatch

H. C. Nix, Plant _ Manager

1

0. M. Fraser, Site Quality Assurance (QA)

Supervisor

L. Gucwa, Manager, Nuclear Safety

and Licensing

bec w/ encl:

NRC Resident Inspector

DRS, Technical Assistant

Hugh S. Jordan, Executive Secretary

Document Control Desk

l

State of Georgia

i

,

'

I

5

'

i

,

h

l

l

E

.

'

>

I

i

s

y

4

I

.

RII

R I ,"

RII

HG

,

N'# 4

C

ser

TConlon

M nk e

0Fy /88

g/ /88

07/j$/88

/(/L gMW

ew.g/ir /M

,

,

.

.

. . .

.

.

.

.

.