Forwards Insp Repts 50-348/88-24 & 50-364/88-24 on 880711-0810.Violation Constitues Another Example of Violations Described in Insp Repts 50-348/88-20 & 50-364/88-20.No Addl Response Required
ML20153B736
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/19/1988
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
ALABAMA POWER CO.
Shared Package
ML20153B738 List:
References
NUDOCS 8808310069
Download: ML20153B736 (2)


See also: IR 05000348/1988024

Text

,

y  ;

, . r.

,.

MG g 9 yy

.

.

.

Docket Nos. 50-348, 50-364

License Nos. NPF-2 and NPF-8

Alabama Power Company

ATTN: Mr. W. G. Hairston, !!!

Senior Vice President-Nuclear

Operations

P. O. Box 2641

Birmingham, AL 35291-0400

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-348/88-24 AND 50-364/88-24

This refers to the Nuclear Regulatory Connission (NRC) inspection conducte(by

W. H. Miller on July 11 thru August 10, 1988. The insnection included a review

of activities authorized for your Farley facility. nt the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

t

Areas exanined during the inspection are identified in the report. Within

these areas, tie inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The inspection findings indicate that certain activities appear to violate NRC

requirements. This violation is another example of Violation 348,364/88-20-03

to which you responded on July 28, 1988. Therefore, no additional response is

required. We will examine the implementation of your corrective actions during

future inspections.

.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2  ;

Title 10. Code of Federal Regulations, a copy of this letter and its enclosures  !

will be placed in the NRC Public Document Room.  ;

Should you have any questions concerning this letter, please contact us.

Sincerely,  !

!

i

!

David M. Verrelli, Chief i

Reactor Projects Branch 1 l

Division of Reactor Projects i

!

Enclosure (See page 2)

8008310069 880819

gDM ADOCK 0 g8

m.

. ~u- - ,

. v.*

.

'

I'UU 1 0 1983

Alabama Power Company 2

.

Enclosure:

NRC Inspection Report

cc w/ encl:

R. P. Mcdonald , Executive Vice President

B. M. Guthrie, Executive Vice President

J. D. Woodard, Vice President -

Nuclear Generation

D. N. Morey, General Manager -

Nuclear Plant

J. W. McGowan, Manager-Safety Audit

and Engineering Review

S. Fulmer, Supervisor-Safety

Audit and Engineering Review

bec w/ enc 1:

NRC Resident Inspector

DRS Technical Assistant

E. Reeves Project Manager, NRR

ttate of Alabama

r

Ril Rll

ptb FYLD

LModenos:sh HDance

08/is/88 08/tg/88