ML20153B736
| ML20153B736 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 08/19/1988 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W ALABAMA POWER CO. |
| Shared Package | |
| ML20153B738 | List: |
| References | |
| NUDOCS 8808310069 | |
| Download: ML20153B736 (2) | |
See also: IR 05000348/1988024
Text
y
,
. r.
,
,.
MG g 9 yy
.
.
.
Docket Nos. 50-348, 50-364
Alabama Power Company
ATTN: Mr. W. G. Hairston, !!!
Senior Vice President-Nuclear
Operations
P. O. Box 2641
Birmingham, AL 35291-0400
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-348/88-24 AND 50-364/88-24
This refers to the Nuclear Regulatory Connission (NRC) inspection conducte(by
W. H. Miller on July 11 thru August 10, 1988. The insnection included a review
of activities authorized for your Farley facility.
nt the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
t
Areas exanined during the inspection are identified in the report.
Within
these areas, tie inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities appear to violate NRC
requirements.
This violation is another example of Violation 348,364/88-20-03
to which you responded on July 28, 1988. Therefore, no additional response is
required. We will examine the implementation of your corrective actions during
future inspections.
.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2
Title 10. Code of Federal Regulations, a copy of this letter and its enclosures
!
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
!
i
!
David M. Verrelli, Chief
i
Reactor Projects Branch 1
l
Division of Reactor Projects
i
!
Enclosure (See page 2)
8008310069 880819
gDM
ADOCK 0
g8
- - -
-
m.
.
~u- -
,
v.*
.
.
I'UU 1 0 1983
'
Alabama Power Company
2
.
Enclosure:
NRC Inspection Report
cc w/ encl:
R. P. Mcdonald , Executive Vice President
B. M. Guthrie, Executive Vice President
J. D. Woodard, Vice President -
Nuclear Generation
D. N. Morey, General Manager -
Nuclear Plant
J. W. McGowan, Manager-Safety Audit
and Engineering Review
S. Fulmer, Supervisor-Safety
Audit and Engineering Review
bec w/ enc 1:
NRC Resident Inspector
DRS Technical Assistant
E. Reeves Project Manager, NRR
ttate of Alabama
r
Ril
Rll
ptb
FYLD
LModenos:sh
HDance
08/is/88
08/tg/88
.
.