Rev 0 to Post-Defueling Monitored Storage,Qa Plan
ML20153B724
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 08/25/1988
From:
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML20153B720 List:
References
1000-PLN-7200.0, NUDOCS 8808310066
Download: ML20153B724 (40)


Text

-

.I

'E POST I

'I i

l DEFL ELING I

MONITORED '

I '

'I ,

I STORAGE l I

I

I
I I

'I QUALITY ASSL RANCE PLAN

I
I pro 188u 8888He

s l POST-DEFUEL2NG MON 2TORED STORAGE l NumbGr l I QUALITY ASSURANCE PLAN l 1000-PLN-7200.04 1 i Title l Revision No. I GPUNC Post-Defueling Monitored Storage Quality Assurance l 0

Plan for Three Mile 467andJnit 2 1 __

Applicability / Scope i Responsible Office This Plan has TMI-2 Applicability l I 9862 This Document is Within QA Plan Scope l X l Yes l__l No 1 Effective Date Saf ety Reviews Required l X l Yes I t No i I

List of Effective Pages Page Revision Page Revisi_on__ Page Revision Page Revision 1.0 0 11.0 0 21.0 0 31.0 0 2.0 0 12.0 0 22.0 0 32.0 0 3.0 0 13.0 0 23.0 0 33.0 0 4.0 0 14.0 0 24.0 0 34.0 0 5.0 0 15.0 0 25.0 0 35.0 0 6.0 0 16.0 0 26.0 0 36.0 0 7.0 0 17.0 0 27.0 0 El-1 0 8.0 0 18.0 0 28.0 0 El-2 0 9.0 0 19.0 0 29.0 0 El-3 0 10.0 0 20.0 0 30.0 0 I

I lI I

1 f

I 1

I I 1.0 09880

s

I POST-DEFUELING MONITORED STORAGE l Nu
ntor l

' NUCIBar l l QUAI.ITY ASSURANCE PLAN I 1h00-PLN-7200.04 I I l Title i Revision No.

' I l 0

! DOCUMENT HISTORY DOCUMENT HISTORY I l l PREPARED EY:

i j l EFFECTIVE I l REVIEWED BY:

REVISIONI DATE I DESCRIPTI0rf 0F CHANGE l APPROVED BY:

] l l I a

l3 0 l l Initial Issue. I I

i3 i

I i

I l l 1 I 1

ll l l

l 1 i l l I

! l I il 4

l i

l i

l i

l

! I J l

l I i j

i i i l

ll 4

l l

i l

l i

l i

l l l j

I I i I I I

! l i I i i I l  ! l J

I I l l

! I l iE I I I l l

i5 I l

l j i I l 1 I l l l I I J

I l l 1 I (

1 I l l I I l I

I ll i

I I 2.0 09890

- _ _ . - . - _-_ . _ _ _ - . - _ _________.-_________-__a

POST-DEFUELING MONITORED STORAGE I Numbar Nuclear li 1 Quit 1TT ASSURiNCE PtAN i 1

1000-PtN-7200.04 Title l Revision No.  !

l TABLE OF C0h7ENTS i O TABLE OF CONTENTS P,, age, COVER PAGE 1.0 DOCUMENT HISTORY 2.0 TABLE OF CONTEh7S 3.0 Ih7RODUCTION 4.0 ,

(

1.0 ORGANIZATION 5.0 2.0 QUALITY ASSURANCE PROGRAM 6.0 3.0 DESIGN CONTROL 11.0 4.0 PROCUREMEh7 DOCUMENT C057ROL 13.0 5.0 INSTRUCTIONS, PROCEDURES, AND DRAWINGS 14.0 6.0 DOCUMENT C0h7ROL 16.0 7.0 CONTROL OF PURCHASED MATERIAL, EQUIPMENT, AND SERVICES 18.0 8.0 IDENTIFICATION AND C0!' TROL OF MATERIALS, PARTS, AND COMPONENTS 20.0 9.0 CONTROL OF SPECIAL PROCESSES 21.0 10.0 INSPECTION 22.0 11.0 TEST CONTROL 24.0 1 12.0 CONTROL OF MEASURING AND TEST EQUIPMENT 26.0 L

13.0 HANDLING, STORAGE AND SHIPPING 28.0 29.0

{ 14.0 INSPECTION, TEST, AND OPERATING STATUS 15.0 NONCONFORMING MATERIALS, PARTS, OR COMPONENTS 3C O h 16.0 CORRECTIVE ACTION 32.0 17.0 QUALITY ASSURANCE RECORDS 33.0 18.0 AUDITS 35.0 EXHIBITS: El-1 Exhibit 1 - Terms and Definitions 3.0 09900

I POST-DEFUEL8NC MONZTORED STORAGE l Numbor UC 88r l QuxuTY ASSURANCE PLAN 1000-PLN-7200.04 g i Revision No.

Title 0

INTRODUCTION INTRODUCTION At the completion of the THI-2 Cleanup Program, the plant will be in aThesafe, stableof I condition that poses no risk to the health and safety of the public. absence any significant quantity oc configuration of nuclear fuel assures that there is no potential for a nuclear criticality. This phase of plant life has been named Post-Defueling Monitored Storage (PDMS) and is suitable for an extended period.

During the PDMS period, GPUN will be licensed under 10 CFR 50 to "possess but not to operate" the TMI-2 f acility. Since the plant will be in a non-operating and defueled I status, there will no longer be any structures, syste=s, or components that perfor= a safety function. Therefore, the quality assurance (QA) requirements of 10 CFR 50, Appendir B do not specifically apply. However, this Plan has been developed to I provide TMI-2 with an appropriate scope PDMS QA Program based upon the guidance of Appendix B requirements. It replaces the "Recove-., CA Plan for Three Mile Island Nuclear Station Unit 2" and shall be imple:ented according to NRC approved License conditions.

This Plan has been structured to ectrespond to the 18 criteria format of 10 CFR 50, Appendix B. The Plan should be applied, as necessary, to assure that safe and stable I PDMS conditions are caintained, while complying with a'.1 pertinent Licensing and other regulatory requireeents. The TMI-2 PDMS Safety Analysis Report (SAR) provides rationale concerning the applicability of various regulatory requirements and should be consulted when 1:plementing the Plan. Additionally, it is intended that the Plan I be implemented to assure conformance with applicable 10 CFR 20; 10 CFR 71, Subpart H; and 49 CFR requirements. Any questions regarding the scope or interpretation of the Plan should be addresried to the Director, QA for deter ination.

Existing UPUN OIgedzations and approved nuclear QA programs may be utilized to fulfill the requirements of the PDMS QA Plan since they will meet or exceed its intent.

I I

I I

I I 4.0 09910 I

I g -g g y ll POST-DEFUELING MONITORED STORAGE l Numb 0r l 1000-PLN-7200.04 QUALITY ASSURANCE PLAN l

l l Revisit;a No.

Title I

l 0 1.0 ORGANIZATION 1.0 ORGANIZATION 1.1 Ceneral It is the policy of CPUN to conduct PDMS activities at THI-2 in I 1.1.1 such a manner as to ensure protection of the health and safety of the public and the personnel on site. To imple=ent this policy, GPUN will adhere to the applicable QA requirements of the Nuclear I Regulatory Commission (NRC) as presented in the Code of Federal Regulations (CFR) and appropriate Regulatory Guides, codes and standards; the ASME Boiler and Pressure Vessel Code as applicable to the State of Pennsylvania; other pertinent federal, state, and I local QA regulatory requirements; and the CPUN corporate policies, as applicable.

1.1.2 To comply with these requirements, the Office of the President has authorized the establishment of a formal and comprehensive QA Program. This Program, which is described in the following sections, shall be implemented through documented and approved I policies, procedures, and instructions which adhere to this Plan.

1.2 Responsibilities 1.2.1 The organizational elements responsible for the PDMS phase of TMI-2 are outlined in the following controlled documents: The I GPLT Organizational Chart and the TMI-2 Technical Specifications identify the general structure of the on-site and off-site organizations supporting TMI-2. The CPUN Organization Plan sets forth specific responsibilities with regard to the requirements (

I of this Plan and implemenths procedures.

office of President - CPUN 1.3 I 1.3.1 The Office of President - GPUN has the overall responsibility for the establishment, implementation, and effectiveness of the TMI-2 i

)

l PDMS QA Program. This responsibility is administered through l I management staff.

The Organization Plan shall define responsibilities for the

. 1.3.2 following functions:

! 1.3.2.1 Operations and Maintenance 1.3.2.2 Engineering Support 1.3.2.3 Radiation Controls 1.3.2.4 Environmental Controls 1.3.2.5 Licensing 1.3.2.6 Independent Review 1.3.2.7 Quality Assurance i

1 5.0 09920 l

I I

l POST-DEFUELING MONITORED STORAGE I Numbar l n -(UCl68r l  ! QUALITY ASSURANCE PLAN I 1000-PLN-7200.04

!g I I l Revision No.

Title I

2.0 l 0 QUALITY ASSURANCE PROGRAM l 2.0 QUALITY ASSURANCE PROGRAM 2.1 The PDMS QA Plan is the primary document which establishes the policies, i

goals, and objectives of the QA Program for TMI-2 and is an integral part

! of the PDMS SAR. This Plan is authorized by the Office of the President and requires that the appropriate levels of management implement the PDMS QA Program. The purpose of this Plan is to establish the principal

,3 requirements which, when implemented, will provide that level of lg assurance necessary to meet and maintain secure PDMS conditions while complying with all pertinent License requirements.

2.2 The scope of the PDMS QA Program includes all items and activities which l

are necessary for safe PDMS operations, maintenance, and surveillance.

These items and activities are designated as within QA Plan Scope" and includet i 2.2.1 S t ruc ture s , systems, and components required to be operable by the TMI-2 Technical Specifications.

2.2.2 Operations associated with any of the structures, systems, and components included in 2.2.1 above, including chemistry j activities.

2.2.3 Surveillance testing and maintenance of structures, syste=s, and components included in 2.2.1 above.

2.2.4 Modifications of structures, systems, and components included in 2.2.1 above.

2.2.5 Radiological monitoring (including on-site and e-vironmental monitoring). j 2.2.6 Radiological protection.

2.2.7 Radioactive waste management.

2.2.8 Emergency planning.

2.2.9 Training.

2.2.10 Security.

2.2.11 Fire protection.

2.2.12 Additional items / activities deemed necessary by plant management.

I I 6.0 09930 I

lI I POSI-DEFUELING MON 8TORED STORAGE l Number lg (UCISar l QUAMTY ASSURANCE PLAN l I

1000-PLN-7200.04 i

ig

' l Revision No.

Title I

l 0 2.0 QUALITY ASSURANCE PROGRAM The SAR should be referred to for descriptions of the Security, fg NOTE:

Emergency, and Radiation Protection Plans astablished for PDMS.

!g 2.3 Procedures, or portions thereof, for controlling activities within QA Plan Scope shall be identified as such. Systems and major components, (I

l but not parts thereof, will be identified as within QA Plan Scope in a Quality Classification List (QCL) document. The QCL shall be established, maintained, and controlled by the assigned TMI-2 and support I organizations.

The significance of an item or activity to quality shall be considered in i

its classification. Procedures shall be preparec which establish the requirements for identification and control of items and activities within QA Plan Scope. Activities af f ecting structures, systems, and l

components within QA Plan Scope shall be considered to be within QA Plan l

Scope unless otherwise specified.

lg 2.4 Assigned organizations shall implement the requirements of the Plan through written policies, procedures, or instructions appropriate to the

'g

! ci-cuestances. The degree ta which the requirements of this Plan and its implementing documentation are applied will be based upon considerations such as:

2.4.1 The importance of a malfunction or failure of the ites to the lg maintenance of safe and stable PDv.S conditions.

lg i 2.4.2 The design and fabrication complexity or uniqueness of the item.

The need for special controls and surveillance or monitoring of

)

i3 2.4.3 processes, equipment, and operational activities.

1.4.4 The degree to which functional compliance can be demonstrated by lI inspection or test.

2.4.5 The quality history and degree of standardization of the item or activity.

2.4.6 The intended life during which the item performs a i

quality-related function.

2.5 GPUN is con =itted to a comprehensive QA Program consisting of up to three l

1evels of verification to assure satisfactory and complete implementation l

of the progtam commensurate with its requirements for maintaining PDMS i conditions. The Program's foremost considerations are the protection of the general public's health and safety.

lI I 7.0 09930 lI

I POST-DEFUELING MONITORED STORAGE l Number lg AUCISar i quatzn ASSURMCE PLAN l l

1000-PLN-7200.04

g I I Revision No.

l Title

! I l 0 2.0 OUALITY ASSURANCE PROGRAM Level 1 - Activities at this level consist of independent lE 2.5.1 IE inspections, checks, and tests. Where first-level activities involve independent inspection for purposes of acceptance and/or verification of sodifications to systems within QA Plan Scope,

,I I

the activity will be performed by the QA Department or by organizations authorized to perform the activity by the QA Department.

2.5.2 Level II - The activities at this level are primarily those of surveillance or monitoring and are performed as deemed necessary lg by the QA Department. The level of surveillance / monitoring applied is consistent with the importance of the item to

g maintaining the function and intent of activities and equipment within QA Plan Scope, and the extent of administrative controls utilized for the Level I activity.

l 2.5.3 Level III - The purpose of this level of activity is to assure, through a comprehensive progn.m of review and auditing, that the first and second levels of the program are properly functioning.

lI This level also establishes that all organizations are properly satisfying all the requirements of the PDMS QA Program.

g This Plan is supported by a Statement of Policy which is signed by the l 5 2.6 President - GPUN. The Statement of Policy provides authorization and ig evidence of management commitment to the QA Program. The Plan shall be i

.g approved by the Office of the President and shall be reviewed for concurrence by the affected division heads.

1 The Director, QA, with the assistance of the Director, Licensing and I 2.7 Regulatory Affairs, shall, for each revision to this QA Plan, determine if the changes reduce or do not reduce the commitments previously j

accepted by the NRC.

2.8 Revisions to the QA Plan that do not reduce the coenitments to the NRC i shall be subtaitted by the Director. 0A on a Document History page; concurred with by the Director, Quality and Radiological Controls; and

'I approved by the Office of the President. Revisions of this type do not require approval by the NRC prior to issuance, but must be submitted to the NRC at least annually.

Revisions to the QA Plan that reduce the commitments to the NRC shall be submitted to the NRC and receive NRC approval prior to issuance.

I Revisions shall be regatied as approved by the NRC upon receipt of a letter to this effect from the appropriate reviewing office or 60 days af ter submittal to the NRC whichever comes fint. Revisions of this type shall be submitted by the Director, QA on a revised Cover Page, concurred I

I 8.0 09930 I

lI POST-DEFUELING MONITCQED STOPAGE I Number 1000-PLN-7200.04 j UCOSTlj QUAMTY ASSURANCE PLAN

' i Revision No.

Title I l 0 2.0 QUALITY ASSURANCE PROGRAM with by the Division Directors, and approved by the Office of the lI 1

President.

The PDMS QA Plan shall be maintained in accordance with written Copies I 2.9 procedures that comply with appropriate regulatory requirements.

of the Plan may be distributed as "Contro11ei" or "Uncontrolled" copies in accordance with approved document control procedures. Changes to this I Plan shall be incorporated into implementing procedures within 60 days of issuance unless an alternative implementation schedule is approvad in writing by the Director. QA.

2.10 The effectiveness of the QA Program is evaluated and reported by the QA Department through the surveillance, monitoring, and auhting functions.

The Director, QA shall be responsible for evaluating deficiencies for the

g detection of any adverse quality trends.

g 2.11 Records of com=itments to regulatory requirements are maintained by the Licensing organtration. The TMI-2 PDMS SAR and associated License forn ll the initial basis of these commitments. They cust be comp'ied with in l3 conjunction with this QA Plan.

2.12 The GPUN QA Program includes requirements for formal indoctrination and l traininghetraining programs of personnel performing or verifying I

activities within QA Plan Scope. These programs are implemented by appropriate training plans and proceduren.

2.13 QA programs and implementing procedures for suppliers or contractors providing materials and services for GPUN which are covered under the I scope of this QA Program shall be subject, when specified in procurement documents, to review and acceptance by the QA Department prior to the commencement of any activity within QA Plan Scope.

2.14 It is the responsibility of the Director, QA, supported by his staff, to provide for the effective administration of this Plan. Accordingly, shall be all g queries regarding the scope or interpretation of the Pla3 addressed to the Director or other appropriate QA management for

,g determination.

Disputes involving quality arising from a difference of opinion between lI QA/QC personnel and other vrganization (engineering, procurement, manuf acturing, construction, eperations, maintenance, etc.) personnel l

,g shall, if possible, be resolved at the level at which such disputen l occur. If this is not possible, the difference of opinion shall be l

g escalated through supervisory / management levels until resolution is 1 achieved.

I ,

l 09930 9.0 I l

I I POST-DEFUELING MONITonED STOPAGE l Numb 2r NucIear i Quit 1Tv ASSuniNCt etxN i 1ooo-rtN-7200.04

,I Title I l l Revision No.

I i 0 2.0 QUALITY ASSURANCE PROGRAM 2.15 The Director, QA ..all make the decision on matters concerning inspection I and acceptance to established requirements. The director of the applicable engineering group shall make the decision on matters concerning interpretation cf technical requirements or design changes.

2.16 Existing GPUN organisations that are implementing approved nuclear QA Programs may apply those programs, as necessary, in support of this Plan.

I lI

!I I ,

I I

I I

I I

I I 10.0 099M I

I I Number AUCISar j I POSI-DEFUEL8NG MON 8TORED STORAGE QeAuTY ASSURANCE PIAN I 1000-PLN-7200.04 l l Title I Revision No.

l 3.0 DESIGN CONTROL l 0 3.0 DESIGN CONTROL 3.1 TMI-2 was originally designed and constructed in compliance with appropriate 10 CTR 50 Codes and Standards. Due to the non-operating and

'I defueled status of THI-2 during PDMS, there will no longer be any structures, systems, or components which perfom a safety function.

However, the TMI-2 Technical Specifications do identify certain

'3 structures, systems, and components required to be operable. Such

,B =truct"r*= = vat === > *nd co=ponents are considered withiu QA Plan Scope and, thus, require the appiteation of QA design controls on a graded basis should modifications be required. Systems and major components I within QA Plan Scope are identified in a Quality Classification List (QCL) document.

,g 3.2 To the extent defined in Section 2.0, measures shall be established for g PDMS to ensure design criteria are included or correctly translated into design documents. These measures, as a minimum, shall ensure that applicable design inputs are identified and documented. Changes from I approved design inputs shall be identified, approved, documented, and controlled. Inputs shall be translated into design output documents containing the technical and quality requirements that must be satisfied.

3.3 To the extent necessary, design control ceasures shall be implemented by controlled written procedures. Such procedures may address the following design activities 3.3.1 The organizational structure, authority, and responsibility of personnel involved in preparing, reviewing, and approving design documents. l 3.3.2 Design input requirements necessary to permit the correct 1 perfomance of design process activities. ALGA considerstions, if appropriate, shall be specified.

3.3.3 Design process activitieJ sufficient to ensure that design inputs are correctly translated into specifications, drawings, I I procedures, or instructions. l 3.3.4 Internal and external design interface controls and lines of I communication among participsting design organizations and across technical disciplines.

I 3.3.5 Design verification methods such as design review or alternate calculations. hrification may be performed by any competent party not responsible for the original design.

I I 11.0 09940 I

I lI POSI-DEFUEf.ING MON 8TORED STORAGE l Numbor NUCISarll QUAMTY ASSURANCE PMN I 1000-PLN-7200.04 iI Title I I i Revision No.

I 3.0 DESIGN CONTROL l 0 3.3.6 Design and specification changes, including field changes, I 3.3.7 subject to dusign control measures.

Records of design activities shall be generated in sufficient detc.11 to permit QA auditing as required by this Plan.

3.4 Methods shall be employed to ensure that adequate precautions or evaluations are in place during PDMS activities (including the I installation and/or removal of hardware) to preclude damaging, impeding operational movc=ents, or in any way adversely impacting the ability of items required by the Technical Specificatione to maintain the plant in a safe and stable PDMS condition.

3.5 Measures shall be provided to assure that responsiole plant personnel are made aware of design changes and/or modifications which may affect the I performance of their duties.

lI I

I

I I

1

I I

I I

, 12.0 Omo I _ - -

lI I Number Nuclear l POST-DEPUELING MONITORED STORAGE i i Quiu Ty iSSURxNCt ,txN i 1ooo.,ts-7200.o4 I

I Title I

l Revision No.

l l 0 4.0 PROCUREMENT DOCUMDIT CONTROL 4.0 PROCUREMENT DOCUMENT CONTROL 4.1 During the PDMS period, minimal procurement activities are anticipated.

Nevertheless, QA measures shall apply to the procurement of materials I including new and spare parts, replacement parts, and consumables, as established by Engineering and consistent with the scope of this Plan.

4.2 Procurement of material, equipment, and services which are considered

,I within QA Plan Scope shall be performed in accordance with written l

plicies, procedures, and instructions which shall establish methods to comply with applicable regulatory requirements.

l 4.3 Procure =ent documents shall, as applicable:

Provide, where necessary, a description of the ite=s or services I 4.3.1 to be provided by the supplier.

4.3.2 Specify technical requirements by reference to the specific iI I

drawings, specifications, codes, regulations, procedures, or instructions including revisions thereto that describe the items or services to be furnished.

4.3.3 Specify QA requirements commensurate with the importance to l quality of the items and services within QA Plan Scope being l perforced.

l l 4.3.4 Provide for CPUN e.ccess to supplier and lower-tier supplier l

f acilities and records for inspection or audit.

4.3.5 Identify those records which suppliers shall retain, maintain, I and control and those which shall be delivered prior to use or I

installation of the item.

1 1 4.4 Review of procureuent documents shall 4.4.1 Be performed by competent personnel who have access to pertinent I inf o rma t ion.

l 4.4.2 Ensure that appropriate technical, quality, and administrative I requirements have been included.

4.4.3 Procurement document changes shall be subject to the same degree I of control as utiltred in the preparation of the original documents.

I I 13.0 09950 I  ;

I l !Mmber POST-DEFtfELING PON2TORED STORACT,

  1. QUAM U ASSURA.M PLAN 1000-P1& M O.04 UDOOIll l l Revisi n No.

Title I

l y 5.0 INSTEUCTIONS, PROCEDURES, AND ') RAVINGS _

5.0 INSnUCTIONS, PROCEDURES, AND DRAVINGS 5.1 During the PDMS period, activities within QA Plan Scope shall be I prescribed by and accomplished in accordance with written instructions, procedures, or drawings of a type appropriate t0 the circumstances.

Procedural adherence shall be mandatory.

> 5.2 Standard guidelines for the format, content, review, and approval of instructions, procedures, and drawings shall be speeffled in division /

department administrative procedures. Procedural documentation Shall be prepared, reviewed, and approved by individuals kn wieigeable in the ares l

af fected by the procedure. Technical and independent reviews shall be in l accordance with the CPUN Review and Approval Matrix.

l 1

5.3 Typical procedure types that shall be established, as necessary, ares 5.3.1 Administrative Procedures - Organizational responsibilities, l

interface relationships, and QA Program and general plant administratzve implementation controls are specifici.

l 5.3.2 Operating Procedures - Provide instructions in suf ficient detail to safely operate plant syste's and components required to be operable per the PDMS Technie:1 Specifications.

I 5.3.3 Surveillance and Test Procedutts - Provide detailed instructions

' for implementing PDMS Technica Specification surveillance and I test requirements.

l Maintenance Procedures - These include both corrective and 5.3.4 preventive maintenance. Skills normally possessed by qualified 1 maintenance personnel may not require detailed step-by-step l delinestion in written procedures, j i

5.3.5 Radiation Protection Procedures - Provide for implementation of 1 the Radiation Protection Plan. l l

I 5.3.6 Engineering Procedures - Provide administrative controls for the i

technical activities necessary to support a safe PDMS condition.  !

5.1.7 Chemistry Procedures - Provide laboratory procedures and administrative controle necessary to support a safe PDMS condition.

5.3.8 QA/QC Procedures - Provide detailed implementation requirements governing the quality verification activities of monitoring, inspection, surveillance, audit, and review.

lI 14.0 09960 I

I I Numbor LE POST-DEFUEL2NG MON 870 RED STORAGE wuCISarli peruTY ASSUMNCE PMN l 1000-M.N-M 00. 04 I 3 tle 1 1 i Revision No.

I INSTRUCTIONS, PROCEDURES, AND DRAWINGS l O

, 5.0 l

If appropriate, instructions, procedures, and drawins: shall include  !

I 5.4 quantitative (such as dimensions, tolerances, and operating limits) and qualitative (such as workmanship samples) acceptance criteria sufficient for determining that activities within QA Plan Scope have been j

I 5.5 satisfactorily accomplished.

Instructions, procedures, and drawings shall be reviewed and approved in accordance with administrative requirements prior to their j I implementation. Review and approval activities shall be documented.

trocedural documentation shall be periodically reviewed for adequacy as 5.6 l set forth in administrative procedures. A revision of a procedure may fulfill the periodic review requirement provided the results of the review are documented.

5.7 Applicable procedures shall be reviewed following any significant '

operator error, calfunction, or system / component codificatier.

i I l I l I

I I

I I 1

I I

I 15.0 09960 I

I POSI-DETUELING MON 830 RED STORAGE I Number MUClear ll QUAL M ASSVRANCE PLAN l 1000-PLN-7200.04 I Title I I I Revision No.

l i 0 6.0 DOCUMENT _ CONTROL 6.0 DOCUMINT CONTROL 6.1 Documents which specify quality requirements or prescribe activities within QA Plan Scope shall be controlled in a manner appropriate to the circumstances. Such documents include, but are not limited to, those I instructions, procedures, and drawings necessary to implement the QA Program defined in Section 2.0 of this Plan.

6.2 Docunent control measures shall be established in written procedures.

These procedures shall address the following elements of document control, as necessary:

6.2.1 Measures to assure that documents within QA Plan Scope, including changes thereto, have been reviewed and apprcred for telease by authorized personnol.

6.2.2 Changes to documents have been reviewed and approved by the came organizations that performed the original review and approval unless otherwise specified by those organizations.

6.2.3 Distribution lists shall be established and maintained current.

Organizations participating in activities within OA Plan Scope I shall receive or have convenient access to documentation governing that activity, i

j 6.2.4 The issuance of documents within QA Plar. Scope is performed in a j I controlled manner in accordance with written procedures. 1 l

6.2.5 A system to identify the latest issue of documents shall be I

i established in written procedures. Master lists identifying current document revision levels may be issued to user personnel '

for reference. Alternatively, documents may be stamped in a I permanent manner to indicate their level of control. A system which combines the use of master lists and stamping techniques is acceptable provided that all documents within QA Plan Scope are

)

included. l I 6.2.6 The user of a document is responsible for ensuring that the l

i latest issue of the document is used to perform work within QA l I Plan Scope. Users are also responsible for removing voided, superseded, or obsolete documents from the wolk place to prevent their inadvertent use. l l

6.2.7 Measures to ensure that the periodic and mandatory (e.g., a system modification) document reviews required by Section 5.0 of this Plan have been conducted.

I I 16.0 09970 I

l l POSI-DETUEL2NG MONZIORED STORAGE l Numbor NUCI68r i ceAuTY ASSURANCE PMN l 1000-PLN-7200.04 l l I Title I Revision No.

I 6.0 I Doct.HENT CONTROL l 0 _

6.2.8 In the special case of documents containing infomation pertaining to plant security, provisions shall be made to I prohibit unauthorized disclosure of certain safeguards inf oma t i on. These provisions shall include identification of the documents, restrictions on their distribution, and storage in

'I locked security storage containers.

6.2.9 Documents that are distributed for information purposes only shall not be utilized to perform activities within QA Plan Scope.

I I

I I

!I 1 I l3

I lP

's I 17.0 09970 I

l lI POST-DEFUELING MONITORED STORAGE l Number

.g YUCI68rll QUALITY ASSU W CE P W l I

1000-Pl.N-7200.04 I

l3 Title i Revision No.

I CONTROL OF PURCHASED MATERIAL, EQUIPMENT, AND SERVICES l 0 7.0 7.0 CONTROL OF PURCHASED MATERIAL, EQUIPMENT, AND SERVICES 1

r 7.1 During the PDMS period, measures shall be established to assure that purchased material, equipaent, and services conform tu the procurement documents. The degree to which control measures will be employed shall I be based upon the significance to qttality of the item or service being supplied.

7.2 Procurement sources shall be evaluated and selected considering the ites or service being supplied. Methods may include any or all of the followingt l

! 7.2.1 Review of supolier histories l

7.2.2 Evalitation of current quality records.

7.2.3 Direct evn uation of the supplier's facilities.

7.3 If appropriate, a manufacturing assurance program will be implemented.

This progran may includes

,3 7.3.1 if required by procurement docueeSts, CPUN approval of supplier's lW drawings, procedures, and manufacturing plans.

7.3.2 Review of supplier recoris documentation f or completeness and i acceptability.

I I

,.3.3 Source inspection, surveillance, or audit of supplier quality activities relative to the pr';urement speciftentions.

7.4 P.aterial acceptance requirements shall be estabitshed at the plant site to assure that l 7.4.1 The item's handling and shipp>. requirements have been observed i by the supplier and maintained by the carrier.

7.4.2 The items provided meet the technical and quaMty requirements specified in applicable receiving inspection plans.

7,4.3 The item's quality records package or compliance certifteation is complete and adequate.

7.4.4 Items delivered which are not in compliance with procurement I I documents are identified and controlled in accordance with nonconformance control procedures.

I I 09980 18.0

W I l POST-DEFUELING MONITORED STORAGE l Number i

NUCI88r l QUALITY ASSURANCE PLAN l 1000-PLN-7200.04 j

)

Title 1 Revision No.

l CONTROL OF PURCHASED MATERIAL, EQUIPMENT, AND SERVICES I O 7.0 7.5 Sufficient records documentation shall be maintained at the plant site to identify the specific requirements, such as codes, standctds, and I specifications met by purchased material and equipment within QA Plan Scope.

\

E ,

I .

1 I

I I l i

I I  :

I  !

I I

I ,

I 19.0 09980 l

I l

l I POST-DEFUEE.ING MONITORED STORAGE l Number MUCl88r]l QUAM U ASSURANCE PLAN l I

1000-PLN-7200.04 I

I Title i Revision No. i I

l O

8.0 IDENTIFICATION AND CONTROL OF MATERIALS, PARTS, & COMPONENTSI l l

1 8.0 IDENTIFICATION AND CONTROL OF MATERIALS, PARTS, & COMPONENTS 8.1 Materials, parts, and components, including partially fabricated subassemblies, necessary to support a safe PDMS condition, shall be j identified and controlled in accordance with written procedures '

I appropriate to the circumstances.

8.2 Item identification requirements, when specified by Engineering in I procurement documents, shall be verified prior to installation as a condition of acceptance.

8.3 Physical identification shall be used to the maximum extent possible.

The location and method of identification shall be specified so as not to affect the form, fit, function, or quality of the item being identified.

Where physical identification on the item is either impractical or I insufficient, physical separation, procedural control, or other appropriate means shall be employed.

8.4 When required by codes, standards, or specifications, traceability of materials, parts, or components to specific inspection, test, or other records shall be provided for and verified.

8.5 Where specified, items having limited calendar or operating life or cycles shall be identified and controlled to preclude use of items whose shelf life or operating life has expired.

8.6 Provisions shall be made for the control of item identification consistent with the planned duration and conditions of storage, such as:

8.6.1 Maintenance or replacement of markings and identification records, if necessary, due to aging.

3.6.2 Protection of identifications on items subject to excessive deterioration due to environmental exposure, 8.7 Correct identification of materials, parts, and components shall be f verified prior to release for fabrication, shipping, installation, or testing.

I I

E E 20.0 09990 I

I I Number POST-DEFUELING MONITORED STORAGE (UCI88r l Quiun ASSURANCE PLAN l 1000-PLN-7200.04 I Title i

I I I

l Revision No.

l 0

,?.' CONTROL OF SPECIAL PROL.SSES 9.0 CONTROL OF SPECIAL PROCESSES 9.1 During the PDMS period, special processes associated with items and activities within QA Plan Scope shall be controlled by written procedures or instructions. Special processes, as defined by Engineering, are those I that require interim in-process controls in addition to final inspection to assure quality including, but not limited to, such processes as welding, heat treating, chemical cleaning, and nondestructive examination

!I (NDE).

'a 9.2 Special process procedures or instructions shall be established to assure that special processes are accomplished under controlled conditions in J' accordance with applicable codes, standards, applications criteria, and other special requirements including the use of qualified personnel, procedures, and equipment, if necessary.

9.3 Procedures or instructions for the control of special processes shall 4 contain appropriate process acceptance criteria and be reviewed and

approved by qualified personnel.

9.4 Personnel, procedures, and equipment performing special processes may reautre au tification- orsent==tionet responsibitities for dettains

B qualification requirements and for implementing qualification programs
m

' shall be specified.

9.5 For special processes not covered by the existing codes or standards or when item quality requirements exceed the require =ents of established

, codes or standards, the necessary qualifications of personnel, procedures, and equipment shall be defined in the procedures.

9.6 Qualification records of personnel, procedures, and equipment associated

'g with special processes shall be established, maintained, and kept current. Records of the performance of special processes shall be

E maintained in accordance with applicable requirements.

I it I

E 1 lE 100000i 21.0 lI I

I POST-DEFUELING MONITORED STORAGE l Numbar NucIear l i QUu rry iSSuRiNcE ,txN i i

1000_,ty_7200.04 l

Title l Revision No.

I l 0 10.0 INSPECTION 10.0 INSPECTION 10.1 A program for the inspection of activities within QA Plan Scope conducted during the PDMS period shall be established. This program shall provide for suitable levels of independent verification to assure quality, and is I a Level I verification activity as defined in Section 2.0 of this Plan.

Inspection program activities will be contro led by written procedures appropriate to the circumstances.

10.2 Inspection personnel (including NDE specialists) who verify conformance of work activities for purposes of acceptaace shall be qualified to perform the assigned inspection task. Qualification levels shall be I established in accordance with applicable codes, standards, and GPWI training programs. Records of personnel qualification and certification If individuals assigned to perform I

shall be maintained and kept current.

inspections are not part of the responsible GPUN QA organization, applicable procedures and personnel gaalification criteria shall be re tewed and concurred with by the responsible QA organization prior to commencing the inspection activity.

10.3 Inspections may be conducted by second-line supervisory personnel or by other qualified personnel not assigned first-line supervisory I responsibility for the conduct of work. Inspections to verify quality shall not be conducted by individuals who perforsad the work or the first-line supervisor responsible for the activity.

10.4 Work authorizing documents used to implement work in the field within QA Plan Scope shall be reviewed by QA Department personnel when the need for the following is determined by Engineering:

10.4.1 Inspections and/or process monitoring.

10.4.2 Hold and/or witness points.

10.5 The inspection program shall require inspection and/or test of items for work operations where such is necessary to verify conformance to I applicable instructions, procedures, and drawings for accomplishing the activity. If inspection of processed items is impossible or disadvantageous, indirect control by monitoring of process shall be required. Both inspection and process control. shall be performed when I required by applicable code, standard, or specification.

10.6 Mandatory inspection hold points shall be included in appropriate I documentation. When QA hold points have been established, either contractually, by procurement, or internally by plant procedures, work say not proceed beyond the hold point until either inspection is I performed or waived by the responsible QA organization.

I 22.0 10010

I

POST-DEFUELING MONITORED STORAGE l Number (UClearl ] QU RITY ASSURANCE PLAN l

\

1000-PLN-7200.04 l I \

l Revision No. )

Title I  !

l 0 10.0 INSPECTION i

10.7 Inspection activities shall be planned and controlled by procedures, 4 instructions, or checklists. These documents shall include, as required:

10.7.1 The characteristic or activity to be inspected.

I 10.7.2 Prerequisites and/or special conditions associated with the {

inspection. l E 10.7.3 Measuring and test equipment needed and the accuracy requirements. l 10.7.4 Inspection methods or procedures to be used. Where verification of p:ior inspection is to be performed, a sampling inspection ,

I plan approved by QA may be used. j

)

10.7.5 Provisions for recording the results of inspection hold points i and approvals for work to continue.

10.7.6 Acceptance criteria for evaluating results.

10.7.7 Provieions for recording inspection data evaluation results and admin *,st rative information.

10.8 Inspection data and results shall be evaluated by qualified personnel to assure that inspection requirements have been satisfied. Inspection results shall he approved by authorized personnel.

10.9 Items and activities failing to conform to inspection requirements shall be identified and controlled in accordance with established nonconformance control procedures.

I E

I l I

I I 23.0 10010

, I 1

I POST-DEFUELING MONITORED STORAGE l Nusbar I muClearll LE I

QUAL M ASSURANCE PLAN l I

1000-PLN-7200.04 l Title l Revision No.

l i 0 11.0 TEST CONTROL 11.0 TEST CONTROL 11.1 A test program shall be established to assure that items will perform satisfactorily in service and that a safe and stable PDMS condition is i I

maintained. Test procedures shall incorporate or reference the I requirements and acceptance limits contained in applicable design and licensing documents.

11.2 The PDMS test program shall cover required tests including:

11.2.1 Surveillance tests and inspections required by the PDMS Facility License and Technical Specifications to demonstrate conformance I. with operability requirements.

11.2.2 Tests required to demonstrate satisf actory performance following I plant maintenance and modifications within QA Plan Scope.

Testing shall be sufficient to confirm that the changes reasonably produce expected results and that the change does not

(

reduce the safety or stability of the PDMS condittoa.

11.3 A schedule for all identified tests and inspections within QA Plan Scope shall be established and maintained. This schedule shall be monitored, I as necessary, to ensure that required tests and inspectiona are performed, evaluated, and reported on a timely basis.

I 11.4 Test procedures or instructions shall provide for the following, as required:

11.4.1 A description of test objectives.

11.4.2 Test prerequisites (e.g., calibrated .nstrumentation, environmental conditions, trained personnel, etc.).

11.4.3 Instructions for performing the test ur surveillance inspection including cautionary or safety notes and equipment control measures, 11.4.4 Identification of mandatory hold or witness points.

I 11.4.5 Documentation of corrective actions performed on nonconformances identified.

11.4.6 Acceptance criteria for evaluating test results.

11.4.7 Documenting the evaluation of test results.

E I 24.0 10020 I

l POST-DEFUELING MONITORED STORAGE I Number NUCIBar li oufa.m ASSUMNCE PLAN l 1000-PLN-7200.04 I Title f I l Revision ho.

l l 0 11.0 TEST CONTROL 11.5 Results shall be evaluated and their acceptability determined by an 4 authorized individual or group.

11.6 Unacceptable test results shall be identified in accordance with established nonconformance control procedures.

I 11.7 Records of PDMS testing activities shall be maintained as required by the Technical Specifications.

I I

E I

R I

I I  !

l 5

I I 10020 25.0 I

l

< 1 POST-DEFUELING MONITORED STORAGE l Numbar ig MUClear l!

QUALITY ASSURANCE PLAN l 1000-PLN-7200.04 I

g }

l Revision No. l Title l l

l 0 12.0 CONTROL OF MEASURING AND TEST EQUIPMENT 12.0 CONTROL OF MEASURING AND TEST EQUIPMENT 12.1 A program to control the measuring and test equipment (M&TE) used to support PDMS activities within QA Plan Scope shall be established. M&TE I includes tools, gauges, instruments, reference and transfer standards, and other measuring and testing devices, including NDE equipment. The M&TE control program shall be implemented by use of written procedures.

12.2 Major elements of the control program are:

12.2.1 Identification of all M&TE within the scope of the program.

12.2.2 Inspection and verification of accuracy upon receipt of equipment calibrated off site.

g 12.2.3 Measures to control, calibrate, adjust, and maintain M&TE at 5

prescribed intervals or prior to use.

12.2.4 Traceability of calibration test data to nationally recognized I standards or approved and documented alternatives.

12.3 Installed operations M&TE requiring calibration shall be labeled, tagged, I or otherwise controlled in accordance with written procedures to ensure that approved calibration intervals are not exceeded. Portable M&TE may be si=ilarly controlled but shall, as a minimum, be clearly labeled to indicate the date on which the current calibration expires. M&TE that I has exceeded the approved calibration interval shall not be used for measurements or tests until recalibrated.

12.4 The calibration frequency for M&TE shall be based on required accuracy, purpose, degree of usage, stability characteristics, and/or any other condition which may affect the measurement. A calibration recall system I shall be implemented to assure recalibration within the required period for each piece of M&TE covered under the scope of this program.

I 12.5 Calibration procedures shall delineate any necessary environmental controls, limits, or compensations in excess of those which may be inherent to the general program. Calibration of M&TE shall be against l

standards that have an accuracy that assures the equipment being I calibrated will be within required tolerance.

12.6 NDE equipment shall be controlled and calibrated in accordance with the i industry code governing its use.

12.7 When M&TE is found to be out of calibration, the validity of previous tests and calibrations that utilized the item since its last calibration I shall be evaluated. Such evaluations shall be documented in suitable 26.0 10030

I' l Number .

l POST-DEFUELING MONITORED STORAGE

g NUCIGar I quit m ASSURANCE PLAN I 1000-PLN-7200.04 l
q l I i Revision No.
Title 1 1 l O 12.0 CONTROL OF MEASURING AND TEST EQUIPMENT I

form. Corrective actions shall be taken as necessary. If any item of I J M&TE is consistently found to be out of calibration, it shall be l

'5 repaired or replaced. l 12.8 Specia.'. calibrations shall be performed should the accuracy of any item of M&TE become questionable.

i.

12.9 Rulers, tape measures, levels, and other such devices may not be i

included in the M&TE control program if normal commeccial practices provide for adequate accuracy.

l 12.10 Sufficient records shall be maintained to provide objective evidence that M&TE control program activities have been implemented.

1

!I lI I

it

I )

lI t

lI il I

27.0 10030

'I

lI ' POST-DEFuELING MONITORED STORAGE l Numbar i Nuclear l l i ouitm iSSuaiNCE aiN i 1ooo-nN-7200.04  :

l l

l Title i Revision No. l l

I l l 1.' . 0 HANDLING, STORAGE AND SHIPPING l 0 l 13.0 HANDLING, STORAGE AND SHIPPING l 13.1 The handling, storage, shipping, cleaning, and preservation of material and equipment within QA Plan Scope necessary to support PDMS shall be l

W controlled in accordance with written instructions, procedures, and drawings to prevent damage, deterioration, or loss.

g 13.2 Special handling tools and equipment shall be provided where necessary to g assure that items can be handled safely and without damage. Handling l operations will be performed by suitably trained personnel.

, 13.3 Storage practices shell provide for methods of storage and the control of l

items in storage which will minimize the possibility of damage or deterioration during storage. The ;elease of items for installation shall be procedurally controlled.

I 13.4 Special measures sh:.11.be established for the storage of chemicals, reagents, lubricants, and other consumable materials.

13.5 Controls shall be established to encure that items whose shelf life has expired will not be used.

13.6 Shipping control measures shall be established that conform to standard industry practices appropriate to the item involved.

13.7 Cleaning requirements shall be included in design and procurement I documents, specifications, and procedures, if appropriate.

I 13.8 Preservation requirements shall be included in design and procurement documents, specifications, and procedures, if appropriate, l

I I

I E

28.0 10040 1E

I' a POST-DEFUELING MONITORED STORAGE l Number muClear l ] QUALITY ASSURANCE PLAN l 1000-PLN-7200.04

.I Title I I l Revision No.

14.0 INSPECTION, TEST AND OPERATING STATUS 0 14.0 INSPECTION, TEST AND OPERATING STATUS 14.1 During PDMS, a program to identify the inspection, test, and operating

' status of structures, systems, components, and individual items withio QA

Plan Scope shall be established and implemented by written procedures.

i 14.2 The inspection and test status of individual items shall be maintained I through the use of status indicators such as physical location and tags, l orkings, shop travelers, stamps, inspection records, labels, routing l eards, or other suitable means. Only items that have passed required inspections and tests are used, installed, or operated.

14.3 Procedures shall be provided to require identification of the operating l status of structures, systems, components, centrols, or support equipment in order to prevent inadvertent or unauthorized operation. These i

i 6 procedures shall require control measures such as locking or tagging to secure and identify equipment in a controlled status. The procedures shall also require that the status of inspections and test performed upon

I l

individual items be indicated by the use of markings such as stamps, tags, labels, routing cards, or other suitable means.

l l 14.4 Permission to release equipment or systems for maintenance or l modification shall be granted by designated operating personnel.

Granting of such permission shall be documented. Af ter permission has l been granted to temove equipment from service, it shall be made safe to work on. Measures shall provide for the protection of equipment and

, workers.

l  !

l ll 14.5 Wen equipment is ready to be returned to service, operating personnel l5 shall place the equipment in operation and verify and document its j functional acceptability. l l

14.6 Control measures for temporary modifications, such as temporary bypass ,

lines, electrical jumpers, lif ted electrical leads, and temporary trip l point settings, shall be established. A log shall be maintained of the l current status of temporary modifications.

l 14.7 The use of status indicators shall be controlled by written procedures.

'3 These procedures will specify the authority for application and removal of tags, markingi, labels, stamps, or other indicators.

g l

14.8 Where required dor.umentary evidence of acceptability is not available, I j

l the associated equiement or materials will be considered nonconforming, j 4 Items not installed shall be appropriately controlled. Nonconforming -

l items shall be identified in accordance with established nonconformance

!g control procedures.

I5 29.0 10050 I

POST-DEFUELING MONITORED STORAGE l Number )

YUClBar l 1000-PLN-7200.04 I QUALIU ASSURANCE PLAN l 1 l

1 I Title i Revision No.

1 l 15.0 NONCONFORMING MATERIALS, PARTS, OR COMF0NENTS i 0 l

15.0 NONCONFORMIhG MATERIALS, PARTS, OR COMPONENTS 15.1 Nonconforming materials, parts, components, services, or activities within the secpe of the GPUN PDMS QA Program shall be identified and controlled in accordance with written procedures. The procedures shall include instructions for identification, documentation, segregation, review, disposition, and notification to affected organizations, as appropriate.

15.2 Nonconformances include both hardware problems involving materials, parts, components, or systems which do not comply with established requirements and non-hardware problems such as failure to comply with the E Facility License and Technical Specifications, procedures, regulations, and/or other es:ahlished requirements. It is the responsibility of all organizations and individuals involved with TMI-2 PDMS functions to I identify and report nonconfomances which may af f ect structures, systems, equipment, materials, parts, and components within QA Plan Scope.

15.3 Nonconfomance reports shall be used to identify conconforming materials, parts, components, and activities; and shall be used to identify itec..s or activities whose status is indeterminate due to lack of documentation.

Nonconfctmance report documentation shall provide for the following, as necessary:

15.3.1 Identification of the nonconforming item or activity.

15.3.2 Description of the nonconformance.

15.3.3 Cause of the nonconfomance.

15.3.4 Disposition of the nonconfomance.

15.3.5 Notification to the affected organization of the nonconformance.

15.3.6 Documenting the controls applied to nonconforming items (e.g. ,

hold tags, segregation, etc.)

15.3.7 Evidence of review for reportability per the Technical Specifications.

15.3.8 Administrative data, including reviews and approvals.

15.4 Measures shall be established to procedurally control further processing, I delivery or installation of a nonconforming item or continuation of a nonconfoming service or activity, pending a decision on its disposition. Nonconforming items shall be appropriately identified and I controlled until their acceptability for use has been estab"(shed. In E

30.0 10060

\E ' POST-DEFUELING MONITORED STORAGE l Number a (UClBarll QUALITY ASSURANCE PLAN I 1000-PLN-7200.04

'g Title i l l Revision No.

I l 0 15.0 NONCONFORMING MA QSlALS, PARTS, OR COMPONENTS order to prevent

  • heir inadvertent use or installation, nonconforming lE items shall be identified by marking or tagging and shall be physically

'g segregated, where practical. If physical segregation is not practical, identification of items as nonconforming by marking or tagging shall be l

l acceptable.

l

! 15.5 The responsibility and authority for the evaluation and disposition of nonconforming items, services, and activities shall be procedurally I defined. Personnel performing evaluations to determine a disposition shall be competent in the specific area being evaluated. Nonconforming items, services or activities shall be reviewed and accepted, rejected, l

l repaired, or reworked. Appropriate administrative corrective actions shall be applied to non-hardware issues.

E 15.6 Repaired or reworked items shall be reinspected and/or retested in accordance with original inspection and test requirements, or acceptable l5 altert etives as determined by Engineering. For items dispositioned "repair" or "use-as-is," a description of the change, waiver, or deviation shall be docueented to record the change and, if applicable, l denote the as-built condition. Documentation verifying the acceptability 1 and approval of such items shall be required.

15.7 When all necessary actions associated with the disposition of l nonconforming items, services, e,r activities have been completed and o verified, nonconformance reports shall be administrative 1y closed.

Records of nonconfemance report documentation shall be maintained in l

accordance with the Technical Specifications and governing administrative j i procedures.

4 lI i

31.0 10060 I

lE.

i POST-DEFUELING MONITORED STORAGE l Number g UC88rlj QUAI,ITY ASSURANCE PLAN 1000-PLN-7200.04 Title l Revision No.

0 16.0 CORRECTIVE ACTION I

16.0 CORRECTIVE ACTION t

16.1 Section 15.0 of this Plan describes the program that will be established

!g to identify and control nonconforming items, services, and activities within QA Plan Scope during the PDMS period. Integral to the program to g

control nonconformar es, requirements to accomplish prompt and effective corrective action shall be established. Requirements for the corrective action program sh 11 be included in appropriate written procedures.

16.2 Nonconformances shall be evaluated to determine the cause of the condition and the need for corrective action. Evaluations and resulting dispositions shall La made by competent personnel. Nonconformances shall be dispositioned "scrap," "repair," "rework," "use-as-is," or an ep;ropriate admini.trative correction. Corrective action necessary to preclude recurrence of nonconformances shall also be detenined and (I

J i=plemented, as appropriate.

'g 16.3 Manage =ent controls shall be established to ensure that required  ;

3 corrective actions are being addressed by responsible organizations in a timely manner. Disputes regarding corrective action issues shall be ,

escalated to appropriate levels of management for resolution, if l l

I necessary. Follow-up activ'.:les shall be conducted to verify implementation of corrective actions and to close-out corrective action documentation.

l ll 16.4 Significant nonconformances (e.g., violations reportable to the NRC) 5 shall be documented and reported to appropriate levels of CPUN i l

management. Such reports shall identify the nonconformance, its cause,

,i and the corrective action taken.

1 l

16.5 Records of nonconformances and their associated corrective actions shall I be maintained in accordance with the Technical Specifications and governing administrative procedures. Periodically, these records shall be reviewed and analyzed to identify adverse quality trends, if any.

Results of these reviews shall be reported to management.

I I

E I 32.0 10070

t POST-DEFUELING MONITORED STORAGE l Number 1000-PLN-7200.04 g UCgSarlj QUAUTY ASSURANCE PLAN l Revision No.

Title 0

17.0 QUALITY ASSURANCE RECORDS ,

I 17.0 QUALITY ASSURANCE RECORDS 17.1 Records of items and activities within QA Plan Scope shall be generated, supplied, and maintained during PDMS in accordance with written lI procedures. Sufficient records and documentation shall be malatained to provide evidence of the quality of items or activities.

17.2 The TMI-2 Technical Specifications, design specifications, procurement ll documents, and GPUN procedures identify the records necessary to comply WB with regulatory requirements, industry codes and standards, and GPUN

,g management control requirements. Documents that are designated records g shall be legible, accurate, and completed appropriate to the work

' accomplished. Documents shall be considered valid records only if stamped, initialed, or signed and dated by authorized personnel or otherwise authenticated.

17.3 Records within QA Plan Scope shall be included in an indexing system with suf ficient information to permit identification between the record and lI the item (s) or activities to which it applies. The system shall also include retention times and the location of the record within the record systee.

l l

17.4 Records shall be classified as either "lifetime" or nonpermanent" records and retained accordingly. Retention times for nonpermanent records shall lg l

be specified in writing and shall be of sufficient duration to assure the ability to reconstruct significant events and satisfy statutory l3 l requirements.

17.5 Records within QA Plan Scope may be corrected subject to the review and approval of the originating organization or as authorized in written procedures.

17.6 Organizations responsible for receiving records shall be identified and

' shall implement an appropriate receipt control system. These organizations shall provide for the protection of records from damage or loss while the records are in their custody.

l 17.7 Records shall be stored in predetermined location (s) that meet the l

requirements of applicable standards, codes, and regulatory agencies.

lgg l

Appropriate single or dual facility methods of storage may be used. The facilities shall be constructed and maintained in a manner which minimizes the risk of damage or destruction from the following:

I 17.7.1 Natural disasters such as winds, floods, or fires.

17.7.2 Environmental conditions such as high and low temperatures and l

' humidity.

33.0 10080 5

.g -

POST-DEFUELING MONITOPED STOPAGE l Number (UClSar ll 1000-PLN-7200.04 I

QUALITY ASSURANCE PLAN l I I

~

Title l Revision No.

I i 17.0 QUALITY ASSURANCE RECORDS l 0

17.7.3 Infestation of insects, mold, or rodents.

17.8 Storage methods shall protect records from damage due to moisture, temperature, or pressure. Provisions, as required, shall ba made for

,I special processed records, (such as radiographs, petographs, negatives, and microfilm) to prevent damage from excessive light, stacking, electromagnetic fields, and temperature. Measures shall be established 4

to preclude the entry of unauthorized personnel into storage areas.

17.9 Records shall be identifiable and retrievable. Lists shall be established and maintained identifying those personnel having access to 4

I record files. The removal of reccrds from storage areas shall be controlled.

l 1

! l iI 4

it  !

'I.

l iI

I

!I E

34.0 10080

POST-DEFUELING MONITORED STORAGE I Numbar

-40OiOOI l QUALITY ASSUMNCE PLAN l 1000-PLN-7200.04 ,

I l l I l Title l Revision No.

I I 0 18.0 AUDITS 18.0 AUDITS 18.1 During PDMS, a system of planned and scheduled audits shall be established for both GPUN and supplier functions which affect items and I activities within QA Plan Scope. Audits include an objective evaluation of practices, procedures, and instructions including an independent review of activities, items, and records within QA Plan Scope which demonstrate effective implementation. The audit system shall be defined I and implemented in accordance with written procedures and is a Level III verification activity as defined in Section 2.0 of this Plan.

I 18.2 Audit areas required by the TMI-2 Technical Specifications shall be scheduled and conducted in compliance with the specified frequencies.

Audit schedules shall be periodically reviewed and revised, as necessary, to ensure that appropru te audit coverage is maintained. Unscheduled I audits may be conducted at any time or as requested by responsible GPUN management.

1 18.3 An individual audit plan describing the audit to be performed shall be i developed and documented by the auditing organization. This plan shall j identify the audit scope, the requirements, the activities to be audited, J the applicable documents, and written procedure or checklists to be used I

1 in performing the audit. )

i' 18.4 Audits shall be performed by trained and qualified personnel not having direct responsibilities in the areas being audited. Qualification and training requirements shall be established and documented, and records of qualifications shall be maintained and kept current. Personnel selected h for QA audit assignments shall have experience or training commensurate W with the scope, complexity, or special nature of the activities to be audited. For each audit, an appropriately qualified individual shall be appointed as audit team leader. Other audit team members shall be I utilized as required and will be classified as either auditors or technical specialists, depending on their function on the audit team.

18.5 Audits shall be conducted in accordance with approved procedures and/or i

I checklists. Audited organizations shall provide sufficient support to assure the accuracy of audit results. Selected elements of the QA program shall be audited to the depth necessary to determine whether or I not they are being implemented effectively. Objective evidence shall be examined. Conditions requiring prompt corrective action shall ba reported immediately to management of the audited organization. At the I conclusion of the audit, a post-audit conference shall be held with ranagement of the audited organization to discuss audit results and present any adverse audit findings (i.e. , nonconformances) .

I E 10090 35.0

e POST-DEFUELING MONITORED STO *1E l Number YUClear li 1000-PtN-7200.04 I Title l

QUALITY assurance PtAN I l

l Revision No.

I 18.0 AUDITS l 0 18.6 Audit reports shall be issued in a timely manner following performance of the audit. Reports shall contain a summary of audit results, an evaluation of QA Program implementation, and a description of adverse findings, if any. Audit reports shall be distributed to responsible management in both the audited and the auditing organizations.

18.7 Management of the audited organization or activity shall review and investigate any adverse audit findings to determine and schedule I appropriate corrective action including action to prevent recurrence. A response shall be made as requested by the audit report, giving results of the review and investigation. Responsible QA organizations shall I conduct follow-up activities to verify that appropriate corrective actions have been taken in a timely manner.

I 18.8 Audit findings shall be periodically reviewed and analyzed to identify adverse quality trends, if any. Results of these reviews shall be reported to management. Section 16.0 of this Pian addresses trending activities associated with other types of nonconformance report I documentation.

18.9 Records of audit activities shall be maintained as required by the Technical Specifications and GPUN audit system implementing procedures.

I i

i I

I I

I l 36.0 10090 1

l I. POST-DEFUELING MONITORED STORAGE l Number I l

-(UClear l l QUALITY ASSURANCE PLAN l 1000-PLN-7200.04 l l l l l Revision No.

Title I I TERMS AND DEFINITIONS l 0 EXHIBIT 1 i

I Terms and Definitions l

This Exhibit contains certain terms and their definitions needed to achieve a uniform j understanding of PDMS QA Progra n requirements. It is not intended that this Exhibit l be considered as a comprehensive listing of terminology used in the Program.

l Therefore, additional terms and their definitions may be included in ralated GPUN policies, plans, and procedures.

l ACCEPTANCE (as used in relation to acceptance of a document): Generally approved, 5 believed, or recognized. Does not require signature of person accepting.

3 ACCEPTANCE CRITERIA: Specified limits placed on characteristics of an item, process,

g. or service defined in codes, standards, or other requirement documents.

AIARA: (Acronym for As Low As Reasonably Achievable) - a method of analysis of the i performance of activities in radiological areas to determine specific methods for (I reducing man-res exposure.

1 ARCHITECT / ENGINEERING (A/E): A firm under contract to provide engineering or design )

I services. l APPROVAL: An act of endorsing and adding positive authorization (signature) to a document by the person (s) responsible for the document.

AS-BUILT DATA: Documented data that describes the condition actually achieved in a l product.

I CONCURRENCE: Written agreement that the provisions in a document for which review has been requested are acceptable for implementation within, or from the standpoint of, the signer's area of responsibility.

l CONTRACTOR: Any organization under contract for furnishing items or services. It

! includes the term vendor, supplier, subcontractor, fabricator and subcontractor levels, where appropriate.

CONTROLLED DOCUMENT: A document which is assigned and distributed to an individual or ,

organization and requires that individual or organization to be accountable for the I document and to acknowledge receipt of the document in writing. The distributing agent is responsible for providing the recipients with current revisions to the l

document and for maintenance of the return acknowledgment receipts.

CORRECTIVE ACTION: Measures taken to rectify conditions adverse to quality and, where l necessary, to preclude repetition.

l El-1 10100 l

ll l

i

1 s l l

POST-DEF"ELING MONITORED STORAGE l Number  !

UC Bar l I quat m ASSURANCE PLAN I 1000-PLN-7200.04 I I Title

\ l l Revision No.

I l

l I TERMS AND DEFINITIONS I O DOCUMENT: Any written or pictorial information describing, defining, specifying, reporting, or certifying activities, reauirements, procedures or results. A document I'

s is not considered to be a QA record uatti R 3a c6cpleted and contains the required signatures.

EXTERNAL ORGANIZATIONS: Any organizati63 participating in the project which is not a part of GPUN or the TMI-2 on-si " Q izat$oo. Th',s term =.a.lud6s vendors, A/E's, and contractors.

I FIELD CHANGE REQUEST (FCR): A doc us~

engineering approval of a drawing, i w 'd e generated in the field requesting

'is *i o sr proccAure change.

MONITORING / SURVEILLANCE: An act o. *esuring cocpliance of activities to program l requirements by direct observation or record review. Generally, monitoring is 1 performed on site and surveillance is performed at a vendor's favi'ity. I I PROCUREMENT DOCUMENT: Purchase requisitions, purchase orders, drawings, contracts, specifications, or instructions used to define requirements for purchase. l QA PLAN (Plan): The basic document which describes the method and extent of compliance of the QA Program to the applicable regulatory and GPUN requirements.

QA PROGRAM (Program); The planned and systematic actions which constitute compliance with regulatory quality assurance requirements and the controlled documents which l describe and prescribe those actions.

QA RECORD: A completed document that furnishes evidence of the quality of items and/or activities af fecting quality.

QUALIFICATION (Personnel): The characteristics or abilities gained through education, training, or experience as measured against established requirements, such as standards or tests, that qualify an individual to perform a required function.

QUAL PICATION (Procedures): An apprcved procedure that has been demonstrated to meet the specified requirements for its intended purpose.

QUALITY CLASSIFICATION LIST (QCL): The controlled document used to record the j identification of systems and major components subject to the requirements of the PDMS  ;

QA Plan.

SPECIAL PROCESS: A process, the results of which aro highly dependent on the control of the process or the skill of the operators, or both, and in which the specified 1

quality cannot be readily determined by inspection or test of the product.

SUPPLIER: Any individual or organization who furnishes items or services in accordance with a procurement document. An all-inclusive term used in place of any of El-2 10100 I

POST-DEFUEL1NG MON 1TORED STORAGE i Number Nuclear i l Quit 1TT iSSuxiNCE etiN i 1ooo-rtN-7200.04 I Title I I l Revision No.

I TERMS AND DEFINITIONS i 0 the fallowing: vendor, seller, contractor, subcontractor, f abricator, consultant, and their subtier levels.

SUPPLIER QUALITY CLASSIFICATION LIST (SQCL): A list of suppliers who have been evaluated by the GPUN QA Department for their capabilities to produce or provide I items, equipment, or services for nuclear power plants.

TRACEABILITY: The ability to trace the history, application, or location of an item I and like items or activities by means of recorded information.

TREND ANALYSIS: A quantitative method of collecting and analyzing nonconformance/ deviation events with the goal of systematically determining prog ammatic/ procedural weaknesses.

VERI}ICATION: An act of confirminF, substantiating, and assuring that an activity or I condition has been implemented in onformance with the specified requirements.

I I

I I

I q

ll I