From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8808310034
Download: ML20153B646 (5)


Text

'

/

[

TENNESSEE VALLEY AUTHORITY CH ATTANOOG A. TENN ESSEE 37401 SN 157B Lookout Place AUG 251988 U.S. Nuclear Regulatory Comission ATTN: Document Control Desk Washington, D.C.

20555 Centleman:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUC' EAR PLANT (SQN) - NRC INSPECTION REPORT NOS. 50-327/88-02, 50-328/88 REVISED RESPONSE TO NOTICE OF VIOLATION Enclosed is TVA's revised response to F. R. McCoy's letter to S. A. White dated February 25, 1988, that transmitted Notice of Violation 50-327/88-02-01 and 50-328/88-02-01. This response is being initiated as a result of questions asked by the resident inspector regarding the responso dated March 29, 1988. provides TVA's response to the notice of violation, example 3.

Sumary statements of comitments contained in this submittal are provided in enclosure 2.

If yw have any questions, please telephone M.

A., Cooper at (615) 870-6549.

Very truly yours, TENNESSEE VAL E AUTil0RITY R. G diey, Man r

j Nuclear Licensing and Regulatory Affairs l

Enclosures cc: See page 2 8808310034 800825 PDR ADOCK 05000327 O

PNU ol l

An Equal Opporturdty Employer

r U.S. Nuclear Regulatory Commission AUG 251988 cc (Enclosures):

Ms. S. C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. F. R. McCoy, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 i

r s

i

]

ENCLOSURE 1 Violation 50-327. -328/88-02-01 "Administrative Instruction ( AI)-25, (Part I), Rev. 23, 'Drawins control After Licensing,' requires that controlled copies, date stamped copies, work plan copies or best available vendor drawing copies be used to perform work."

"Contrary to the above,"

"3.

On January 31, 1988, a portion of an unidentified drawing marked

'Information only' was used to perform work on centainment spray system flow indicator 2-FI-72-34."

Admission or Denial of the Alleged Violation TVA admits the violation.

Reason for the Violation s

As stated in TVA's response dated March 29, 1988, "On January 31, 1988, maintenance work was performed on the containment spray pump 2A flow loop 2-F-72-34.

The work to be performed consisted of backfilling the low-side sense line of 2-FM-72-34A, 2-Rt-72-34B, and 2-FI-72 34 in accordance with SI-203."

As a result of the NRC resident inspector's questions, TVA has conducted an additional investigation into this incident. TVA could not determine whether physicci work had been performed using information-only drawings.

This investigation did reveal that AI-25 could be a contributing factor with an incident of this type in that it could be misconstrued. However, because no objective evidence can be established regarding this situation and because TVA fully agrees with the technical merits regarding use of drawings, TVA does not take issue with the violation.

Corrective Steps That Have Been Taken condition Adverse to Quality Report (CAQR) SQN880159 has been issued to document and track corrective actions taken. The incident has been discussed with the employees involved, and they are aware of the procedural requirement to use only controlled drawings or controlled prints.

Instrument Maintenance has conducted training classGs with instrument mechanlCs to relnforce the i

requirements described it. AI-25.

TVA has stressed the importance of using controlled drawings for performing work. TVA continues to reinforce tho j

proper use of controlled drawings during periodic training sessions.

1 t

--n

.. ~ -,...,, -

w

_,e

-~--r'

r Q*

. Corrective Steps That Will Be Taken to Avoid Further Violations AI-25 will be revised by October 15, 1988, to provide more specific direction for control of drawings used during perfornuance of work.

Date When Full Compliance Will Be Achieved TVA is in full compliance.

I a

F b

em I

r DCLOSURE 2-List of Cotualttnents 1.

AI-25 will be revised by October 15, 1988, to provide teore specific direction for control of drawings used during performance of work.

[