Monthly Operating Rept for Jul 1988 for Davis-Besse Nuclear Power Station Unit 1
ML20153B596
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/31/1988
From: Cipriani J, Storz L
TOLEDO EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
KB88-00259, KB88-259, NUDOCS 8808310014
Download: ML20153B596 (6)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

REFUELI!1G It1FORMATI0!1 Date:

July 1988 1.

tiame of facility:

Davis-Besse Unit 1 2.

Scheduled date for next refueling outage? Tentative Outage Vindy October 1989 3.

Scheduled date for restart from current refueling:

September 1988 4.

Vill refueling or resumption of operation thereafter require a technical specification change or other license amendment? If answer is yes, what in genercl vill these be? If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?

Ans: The Reittd Report requires standard reload fuel design Technical Sy cifications changes (2. Safety Limits and Limiting Safety System Set ings, 3/4.1 Reactivity Control Systems. 3/4.2 Power Distribution Limits and 3/4.4 Reactor Coolant System.)

5.

Scheduled date(s) for submitting proposed licensing action and supporting inftrnation:

Submitted May 18. 1988 6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

The highly absorbing silver-itdium-cadmium axial power shaping a.

rods vill be replaced with reduced absorbing inconel rods.

b.

The discrete neutron sources vill be removed from the core and not replaced.

The physics testing has been reduced in scope.

c.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool, and (c) the new fuel storage areas.

(a) 0 (b) 445 (c) 0 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

I Present:

735 Increased size by:

0 (zero) 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensd capacity.

Date:

1995 - assuming ability to unload the entire core into the spent fuel pool is maintained d

g'l 8 sos 31oot4 eso731 gDR ADOCk 05000346 PDC

e.

OPERATLNG DATA REPORT DOCKET NO. 5.,0_346 DATE August 15, 1988 COMPLETED BY J. Cipriani TELEPHONE x4460 OPERATING STATUS Davis-Besse Unit No. 1 Notes

1. Unit Name:
2. Reporting Period:

July 1988

3. Licensed Thermal Power (MWt):

2772 925

4. Namepiste Rating (Gross MWe'c

$. Design Electrical Rating (Net MWe): -906

6. Maximum Dependable Capacity (Gross MWe):

904 860

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Sinc = Last Report.Glie Reasons:

i

9. Power Level To Which Restricted.lf Any(Net MWe):
10. Reasons For Restrictions. If Any:

This Month Yr. to Dete Cumuistive II. Hours in Reporting Period 744 5.111 87.767

12. Number Of Hours Reactor Was Critical 0.0 1.661.3 45.142.I
13. Reactor Reserve Shutdown Hou,,

0.0 0.0 5,o5n,i

14. Hours Generator On l.ine 0.0 1.550 43,3gg
15. Unit Rearrve Shutdown Hours 0.0 0.0 1.732.5
16. Geese Thermal Energy Generated (MWH) 0.0 3.306.442 101.268.641
17. Gross Electrical Ensegy Generated (MWM) 0.0 1.072.485 33.448.288
18. Net Electrical Energy Generated (MWH)

-_ 0.0 998.737 31.299.434 l

19. Unit Service Factor 0,0 30.9 49,4
20. Unit Aseitability Facto, 0.0

'30.9 51.4

21. Unit Capacity Factor (Uning MDC Net) 0.0 22.7 41.5
22. Unit Capscity Factor (Uning DER Net) 0.0 21.6 39.4
23. Unit Forced Outage Rat, 0.0 0.0 32.5
24. Shutdowns Scheduled Over Nest 6 Months tType.Dare,and Duration of Eacht:

Refueline - started on March 10 1988 - 29 weeks - ends on September 29. 1988

25. If Shut Down At End of Report Period. Estimated Date of Startup.

September 29. M88

!6. Units in Test Status iPrior to Commercial Operationi:

Forecast Achiesed l

INITIAL CRITICALITY INITIAL ELECTRICITY i

COMMERCIAL OPER ATION 19/77)

h,...

I a

AVERAGE DAILY UNIT POWER LEVEL 20-346 DOCKET NO.

DB-1 UNIT August 15. 1988 DATE.

J. Cipriani COMPLETED BY TELEPHONE X4460 1

MONTH lulv 1988 L

DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL L

IMWe Net)

(MWe Net t i

0.0 0,0 1

y7 2

0.0 gg o,o 3

0.0 g,

o,o 0.0 0.0 4

20 0.0 0.0 21 0.0 6

22 0.0 0.0 7

23 0,0 0.0 o,o 3

74 O'O 0.0 e

gg 10 26 00 ll 0.0 37 0,0 0.0 0,0 0.0 13 2,

0.0 0.0 14 30 0.0 o,o 15 yi 0.0 INSTRUCTIONS On this format,bst the aserage dath unit power lesel in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(u177 )

!! NIT 5NUTDOWMS AND p0WEa BEDUCTIONS tm T nas.

SG-h6 UtstT ISAME Davis-So.ee t CATE August 15, 1988 N 8ETED 8Y J C87'8*al atromT sowTu July 1988 TatErmont Uls) 249-5555 est. 7365 t '.

L E:

=

g

];x Lic.ne

1 g.

c

.e 6c.es.ct1..

K

}~

g3 actsee ee

u E..et,

=.

1y s..

o...

y t a

..r.

a.p.rt c

2 88-3-10 5

744 C

1 N/A N/A N/A

'Ihe unit outage which began on March 10, 1988 was still in progress through the end of July 1988.

See Operational Sununary for further details.

i l

l l

l l

'F 3

Fort.A meeeen:

hethod:

'Enhibit C - leetractione for Freparation of Date S: Scheduled A-Equipment Fe11ere (Emplete) l-Manuel Entry Sheets for Licensee Eweet Report (LER)

B-Matatemence er Test 2-Manuel Scram File (NUaEC-0161)

C-Befuelleg 3-Aetematic Scram D-Seguletety seearictien 6-Conttousttoo frou I

E-Operator i'reistag & Licenee Ementeet ten Frevieve stooth Emhtbit I - Some Source F-Ada kistretswo 3-1.eed medvetion

  • Seport challenges to Fever Operated Belief Velves C-Operettesel Error (Emplete) 9-Other (Emplain)

(F0 ave) med Presourtser Code Safety Velves (FCSVs)

IIAher (Emplete)

7 _ - _ _ _ _.

oo.

0 OPERATIONAL

SUMMARY

July 1988 The fifth refueling outage is scheduled to be complete on September 29, 1988. During July, investigation of material found in the reactor vessel, after core offload, revealed that an HPI thermal sleeve had broken.

Fiberscope inspections were performed on the other three of the HPI thermal sleeves and another sleeve was discovered to have a linear indication which was later shown not to be cracked. Currently, installation of two new thermal sleeves is in progress. This emergent work along with field change packages requiring implementation in association with SFRCS modifications are on the critical path to outage completion.

Good progress has been made in other areas. Cooling tower work vill be The test completed in early August as vill be the ISI and M0 VATS programs.

program for restart is one third complete with 12 of the 36 post modification tests required for Mode 4 entry having been accomplished.

Major Events Completed in July

- Makeup feed and bleed modification flush

- Reactor Coolant Pump Motor 2-2 flywheel inspection

- Control Room center console vire terminations

- Decay Heat Loop 1 maintenance

- Condensate Polisher 1 element replacement

- Reactor Coolant Pump seal replacement (3 RCPs)

- Main condenser leak chick i

- Auxiliary Teedvater Pump and turbine maintenance

- 2N and 2P battery replacement testing

- Control Room painting demarcation l

1 l

i i

i I

b

.,,~

  • EbISON August 15, 1988 KB88-00259 f

Docket No. 50-346 License No. NPF-3 l

l I

Document Control Desk U. S. Nuclear Regulatory Commission Vashington, D. C.

20555 Gentlement Monthly Operating Report, July 1988 Davis-Besse Nuclear Power Station Unit I r

Enclosed are ten copies of the Monthly Operating Report for Davis-Besse Nuclear i

Power Station Unit No. 1 for the month of July 1988.

t If you have any questions, please contact Bilal Sarsour at (419) 249-5000, i

extension 7384.

Very truly yours, y',

C d..g/

7 gg 3

Louis F. Storz [

Plant Manager Davis-Besse Nuclear Power Station

[

l i

BMS/JEC/plg I

Enclosures l

cci Mr. A. Bert Davis l

Regional Administrator, Region III Mr. Paul Byron NRC Resident Inspector pd Mr. A. V. DeAgazio NRC Project Manager ig l

THE TOLEDO ED: SON CO*.iPANY EO SON PLAZA 300 MAD SON AVENL'E TOLECO. CH O 43652