Forwards Monthly Operating Rept for Feb 1988 & Revised Rept Data for Jan 1988,correcting Cumulative Unit Force Outage Rate from 5.1% to 5.3%
ML20153B563
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/14/1988
From: Mcdonald R
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20150C186 List:
References
NUDOCS 8803220270
Download: ML20153B563 (1)


Text

.,q

.I

' 'Allbama Powir Company 600 North 18th Street Post Office Box 2641 -

Birmingham, Alabama 35291-0400 Telephone 205 250-183!,

m R. P. Mcdonald

, Alabama Power Se.iior Vice President the southem electic system March 14, 1988 Docket No. 50-364 U. S. Nuclear Regulatory Connission ATIN: Document Control Desk Washington, D. C.

20555 Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the February 1988 Monthly operating Report for Joseph M. Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specificationr4. Also attached are two (2) revised copies of the January 1988 report data. A revision was necessary to correct the Cumulative Unit Forced Outage Rate from 5.1% to 5.3%.

If you have any questions, please advise.

4 l

Yours very ly, l

?

&w R. P. Mcdonald RPM /JGS:mab/1.6 Attachments xc: