ML20150D183

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Jan 1988
ML20150D183
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/31/1988
From: Woodard J
ALABAMA POWER CO.
To:
Shared Package
ML20150C186 List:
References
NUDOCS 8803230173
Download: ML20150D183 (2)


Text

'

OPERATING DMA REPORT DOCKET NO.

50-364

- ('

DME 2/2/B8 CDIPIJ!"I1!D BY J. D. Woodard 1

TEIZPEDE (205)899-5156 OPERATING S1A'IUS Notes

1. Unit Name:

Joseph M. Farley - Unit 2

2. Reporting Period:

January, 1988

1) Cumulative data since
3. Licensed Wermal Power ( M t):

2,652 7-30-81, date of

4. Nameplate Rating (Gross We):

860 cournercial operation

5. Design Electrical Rating (Net m e): 829
6. Maximum Dependable Capacity (Gross W e):

863.8

7. Maximum Dependable capacity (Net Me):

822.8

8. If Changes Occur in Capacity Ratings (Items Number 3 2 rough 7) Since last Report, Give Reasons: Items 46 and #7 have been changed due to evaluation of operating experience.
9. Power Level To Which Restricted, If Any (Net We):

N/A

10. Reasons For Restrictions, If Any:

N/A r

this Month Yr-to-Date Cumulative

11. Hours In Reporting Period 744 744 57,049
12. Number Of Hours Reactor Was Critical 744.0 744.0 53,637.9 (14. Hours Generator On-Line 1.3. Reactor Reserve Shutdown Hours 0.0 0.0 138.0 744.0 744.0 47,992.6
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross hermal Energy Generated ( WH) 1,971,889 1,971,889 121,315,161
17. Gross Electrical Energy Generated (WH) 659,612 659,612 39,862,828
28. Het Electrical Energy Generated (EH) 629,032 629,032 37,780,770

~

19. Unit Service Factor 100.0 100.0 84.1
20. Unit Availability Factor 100.0 100.0 84.1
21. Unit Capacity Factor (Using MDC Net) 102.8 102.8 81.2
22. Unit Capacity Factor (Using DER Net) 102.0 10TT 79.9
23. Unit Forced Outage Rate 0.0 0.0 S.3 l
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Ea'ch):

l l

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup: t;/A
26. Unitri In Test Status (Prior to Cocunercial Operation):

Forecast Achieved l

INITIAL CRITICALITY 05/06/81 05/08/81 l

INITIAL ELEC'IRICITY 05/24/81 05/25/81 l

CDMMERCIAL OPERATICH 08/01/81 07/30/81 l

l l

L orm 2/30 l

8803230173 s80314 PDR ADOCK 05000364 R

pon m, n m--,


, m w,,y,,,-,m

,.c.

~

OPERATIN3 DMA REPCRT DOCKET NO.

50-364

- ('

DME 2/2/88 OCMPIEIED BY J. D. Woodard

'IELEPfDE (205)899-5156 OPERATING STMUS Notes

1. Unit Name:

Joseph M. Farley - Unit 2

2. Reporting Period:

January, 1988

, 1) ttrulative data since

3. Licensed 'Ihermal Power (Mt):

2,652 wcenercial operation 7-30-81, date of

4. Nameplate Rating (Gross We):

860

5. Design Electrical Rating (Net We): 829

~

6. Maximum Dependable Capcity (Gross Me):

863.8

~

7. Maximum Depe:v'atble capacity (Net We):

822.8

8. If Changes Occur in Capacity Ratings (Items Number 3 ThroulgNWee Last Report, Give Reasons: Items #6 and 57 have been changed dut to evaluation of operating experience.
9. Power Level To Which Restricted, If Any (Net M e):~~ "" yA
10. Reasons For Restrictions, If Any:

N/A x_,

m i da honth Yr-w-Date n e lative

11. Hours In Reporting Period 744 744 57,049
12. Number Of Hours Reactor Was Critical 744.0 744 7 53,637.9 g14.HoursGeneratorOn-Line

~

.3. Reactor Reserve Shutdown Hours 0.0 t.0 138.0 74TQ-744.0 47,992.6

~

~

~

15. Unit Reserve Shutdown Hours

~0'T-O.0 0.0

16. Gross 'Ihermal Energy Generated (mf)

E7% 9?If --

T.971,889 121,315,161

~T5W 6

'39,862,828

17. Gross Electrical Energy Generated (th'H) 659,612

~6bs,la

~

18. Net Electrical Energy Generated (' 1H)

~~D9,022 32 37,780,770 l

19. Unit service Factor 7 5ti 6 ~

MT 84.1

~

20. Unit Availability Factor

~~1UCli-MDT 84.1

~ ~ ' ~

21. Unit Capacity Factor (Using MDC Net)

TU '.8

---' ~f5TF 81.2

22. Unit capacity Factor (Using DER Net)

IICCT-

.10t.F 79.9

"~

l

23. Unit Forced Outage Rate 0.0

~ ~ ' ~ M ~~

5.3 l

l

24. Shutdowns Scheduled Over Next 6 MonthL (Type, Date, and Dur5 & n of la3ic: ~

N/A l

25. If Shut Down At End Of Report Period, Estimated Date of Stsrtup:'J N
26. Units In Test Status (Prior to Ca:rnercial Operation):

Arrecast Achievel INITIAL CRITICALITY OS/05.41 OU0 cgs 1 INITIAL ELEC'mICITY 05M/01- ~ V577B/31 l

CCEMERCIAL OPERATICH

,D3761'/41

'~ 07/30/bl i

3 (Worm 2/30 I.

ly a.

-.:.n,,,.,.-.n.,-...n.,..~...,.,

-,H