Text
'
OPERATING DMA REPORT DOCKET NO.
50-364
- ('
DME 2/2/B8 CDIPIJ!"I1!D BY J. D. Woodard 1
TEIZPEDE (205)899-5156 OPERATING S1A'IUS Notes
- 1. Unit Name:
Joseph M. Farley - Unit 2
- 2. Reporting Period:
January, 1988
- 1) Cumulative data since
- 3. Licensed Wermal Power ( M t):
2,652 7-30-81, date of
- 4. Nameplate Rating (Gross We):
860 cournercial operation
- 5. Design Electrical Rating (Net m e): 829
- 6. Maximum Dependable Capacity (Gross W e):
863.8
- 7. Maximum Dependable capacity (Net Me):
822.8
- 8. If Changes Occur in Capacity Ratings (Items Number 3 2 rough 7) Since last Report, Give Reasons: Items 46 and #7 have been changed due to evaluation of operating experience.
- 9. Power Level To Which Restricted, If Any (Net We):
N/A
- 10. Reasons For Restrictions, If Any:
N/A r
this Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 744 744 57,049
- 12. Number Of Hours Reactor Was Critical 744.0 744.0 53,637.9 (14. Hours Generator On-Line 1.3. Reactor Reserve Shutdown Hours 0.0 0.0 138.0 744.0 744.0 47,992.6
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross hermal Energy Generated ( WH) 1,971,889 1,971,889 121,315,161
- 17. Gross Electrical Energy Generated (WH) 659,612 659,612 39,862,828
- 28. Het Electrical Energy Generated (EH) 629,032 629,032 37,780,770
~
- 19. Unit Service Factor 100.0 100.0 84.1
- 20. Unit Availability Factor 100.0 100.0 84.1
- 21. Unit Capacity Factor (Using MDC Net) 102.8 102.8 81.2
- 22. Unit Capacity Factor (Using DER Net) 102.0 10TT 79.9
- 23. Unit Forced Outage Rate 0.0 0.0 S.3 l
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Ea'ch):
l l
N/A
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: t;/A
- 26. Unitri In Test Status (Prior to Cocunercial Operation):
Forecast Achieved l
INITIAL CRITICALITY 05/06/81 05/08/81 l
INITIAL ELEC'IRICITY 05/24/81 05/25/81 l
CDMMERCIAL OPERATICH 08/01/81 07/30/81 l
l l
L orm 2/30 l
8803230173 s80314 PDR ADOCK 05000364 R
pon m, n m--,
, m w,,y,,,-,m
,.c.
~
OPERATIN3 DMA REPCRT DOCKET NO.
50-364
- ('
DME 2/2/88 OCMPIEIED BY J. D. Woodard
'IELEPfDE (205)899-5156 OPERATING STMUS Notes
- 1. Unit Name:
Joseph M. Farley - Unit 2
- 2. Reporting Period:
January, 1988
, 1) ttrulative data since
- 3. Licensed 'Ihermal Power (Mt):
2,652 wcenercial operation 7-30-81, date of
- 4. Nameplate Rating (Gross We):
860
- 5. Design Electrical Rating (Net We): 829
~
- 6. Maximum Dependable Capcity (Gross Me):
863.8
~
- 7. Maximum Depe:v'atble capacity (Net We):
822.8
- 8. If Changes Occur in Capacity Ratings (Items Number 3 ThroulgNWee Last Report, Give Reasons: Items #6 and 57 have been changed dut to evaluation of operating experience.
- 9. Power Level To Which Restricted, If Any (Net M e):~~ "" yA
- 10. Reasons For Restrictions, If Any:
N/A x_,
m i da honth Yr-w-Date n e lative
- 11. Hours In Reporting Period 744 744 57,049
- 12. Number Of Hours Reactor Was Critical 744.0 744 7 53,637.9 g14.HoursGeneratorOn-Line
~
.3. Reactor Reserve Shutdown Hours 0.0 t.0 138.0 74TQ-744.0 47,992.6
~
~
~
- 15. Unit Reserve Shutdown Hours
~0'T-O.0 0.0
- 16. Gross 'Ihermal Energy Generated (mf)
E7% 9?If --
T.971,889 121,315,161
~T5W 6
'39,862,828
- 17. Gross Electrical Energy Generated (th'H) 659,612
~6bs,la
~
- 18. Net Electrical Energy Generated (' 1H)
~~D9,022 32 37,780,770 l
- 19. Unit service Factor 7 5ti 6 ~
MT 84.1
~
- 20. Unit Availability Factor
~~1UCli-MDT 84.1
~ ~ ' ~
- 21. Unit Capacity Factor (Using MDC Net)
TU '.8
---' ~f5TF 81.2
- 22. Unit capacity Factor (Using DER Net)
IICCT-
.10t.F 79.9
"~
l
- 23. Unit Forced Outage Rate 0.0
~ ~ ' ~ M ~~
5.3 l
l
- 24. Shutdowns Scheduled Over Next 6 MonthL (Type, Date, and Dur5 & n of la3ic: ~
N/A l
- 25. If Shut Down At End Of Report Period, Estimated Date of Stsrtup:'J N
- 26. Units In Test Status (Prior to Ca:rnercial Operation):
Arrecast Achievel INITIAL CRITICALITY OS/05.41 OU0 cgs 1 INITIAL ELEC'mICITY 05M/01- ~ V577B/31 l
CCEMERCIAL OPERATICH
,D3761'/41
'~ 07/30/bl i
3 (Worm 2/30 I.
ly a.
-.:.n,,,.,.-.n.,-...n.,..~...,.,
-,H