- c UNITED STATES E
N NUCLEAR REGULATORY COMMISSION 5
E W ASHING TON, D. C. 20555 March 11, 1988 Docket No: 50-353 Mr. Edward G. Bauer, Jr.
Vice President and General Counsel Philadelphia Electric Company 2301 Market Street Philadelphia, Pennsylvania 19101
Dear Mr. Bauer:
SUBJECT:
Development of Technical Specifications RE:
LIMERICK GENERATING STATION, UNIT 2 Over the past year, we have had several meetings with your staff regarding the development of Technical Specifications for Unit 2.
Enclosed for your information and use for the approximate 1-year period before the fuel load / low power Operating License (OL) is issued is the milestones chart established for the development of OL Technical Specifications (TS).
It will be used as guidance for scheduling various milestones.
Flexibility to establish the actual milestones dates within the chart is permitted to support your schedule as long as a thorough TS review is tnsured.
Enclosed is a printed copy of the Unit 1 TS as maintained in our computer file but relabeled as the Unit 2 TS.
Please have your staff review that Unit 2 TS document and mark it up to identify non-applicable portions, those areas where TS are required but are not provided, and those TS that shoulti be replaced by plant-specific TS.
Please note that, for the second unit supplied by the same vendor and of the same type as an existing unit at a multi-unit site, the TS for the seccnd unit should normally be virtually identical to those of the previously licensed unit. The only TS changes that are normally permitted are those that are absolutely necessary and justified (e.g., by actual design differences or by new regulatory requirements applicable to the unit to be licensed).
Any "administrative-type" changes requested by your staff should be submitted for the previously licensed unit in time to permit approval before licensing of the second unit. Once approved, these changes can be incorporated into the draft TS for the second unit. Changes which cannot be handled on this schedule will be deferred until after the second unit is licensed; the changes would then be processed as amendments for both units.
h!O kOO K $
3 A
r
..... I want tc emphasize that the applicant is responsible for ensuring that the proposed plant-specific TS are accurate and consistent with the final safety analysis report (FSAR) and other supporting documents and the as-built plant.
The marked-up document must be submitted on the docket.
The Project Manager (PM) will send it to the Technical Specification:, Branch (OTSB) for initial review.
If you have any questions, please call me at 301-492-3041.
Sincerely.
Original signed by, Richard J. Clark Richard J. Clark, Project Manager Project Directorate I-2 Division of Reactor Projects I/II
Enclosures:
1.
Figure A Milestones Chart 2.
Draft Unit 2 TSs cc w/o enclosures:
See Next Page i
DISTRIBUTION w/o enclosures LDocRetF11ezj
'PDI-2 Rsading NRC PDR/LPDR SVarga/BBoger M0'Brien MThadani/DFischer OGC-WF E. Jordan J. Partlow ACRS(10)
Previously concurred
- PDI-2/PM*
PDI-2/D*
RClark:tr WButler 3/11/88 3/11/88 f
2 2
I want to emphasize that the applicant is responsible for ensuring that the proposed plant-specific TS are accurate and ennsistent with the final safety analysis report (FSAR) and other supporting documents and the as-built plant.
The marked-up document must be submitted on the docket.
The Project Manager (PM) will send it to the Technical Specifications Branch (OTSB) for initial review.
If you have any questions, please call me at 301-492-3041.
Sincerely, Ri hard J.
ark, Project Manager P oject Directorate I-2 D vision of Reactor Projects I/II
Enclosures:
1.
Figure A Milestones Chart 2.
Draft Unit 2 TSs cc w/o enclosures:
See next page l
l
Mr. Edward G. Rauer, Jr Limerick Generating Station Philadelphia Electric Company Units 1 & 2 cc:
Troy B. Conner, Jr., Esquire Mr. Robert Gramm Conner and Wetterhahn Senior Resident Inspector 1747 Pennsylvania Ave., N.W.
U.S. Nuclear Regulatory Commissinn Washington, D. C.
20006 P. O. Box 58 Sanatoga, Pennsylvania 19464 Mr. Charles Pengers $7-1 Philadelphia Electric Company Chairman Board of Supervisors of 2301 Market Street Limerick Township Philadelphia, Pennsylvania 19101 646 West Ridge Pike Limerick, Pennsylvania 19468 Mr. David Honan N2-1 Philadelphia Electric Company Dept of Environmental Resources 2301 Market Street ATTN:
Director, Office Radiologic Philadelphia, Pennsylvania 19101 Health P. O. Box 2062 Mr. Grahm M. Leitch, Acting Plant Manager Harrisburg, Pen 1sylvania 17105 Limerick Generating Station Post Office Fox A Thomas Gerusky, Director Sanatoga, Pennsylvania 19464 Bureau of Radiation Protection PA Dept. of Environmental Resources Mr. James Linville P. O. Box 2063 U.S. Nuclear Regulatory Commission Harrisburg, Pennsylvania 17120 Region I 475 Allendale Road Governor's Office of State King of Prussia, PA 19406 Planning and Development ATTN:
Coordinator, Pennsylvania State Clearinghouse P. O. Box 1323 Harrisburg, Pennsylvania 17102 1
I I
l l
l l
i
u FIGURE A: DEVELOPMENT OF OL TECHNICAL SPECIFICATIONS A
,,e a..
wiu s.e, oise as orse
,e N
a e
e.
e,,,,,,,e,.
m4
.e-oism e-wa
.e e
.ua
- e. a.
i.e s to.
s t 5 e.
e.s s.we.
.sa s y of Po.nor w.e wee so ees..two s sei h..
ww.we aus..re s,or
.v es,,, si
<e s
e e
ue
==, a
.e u as,
. is.
t.. nee
.e se
..n
.e e,ia..
wa
.e
. w
...su.
u n.
a
- 5..
es.o. e.
.e,.
.m is e n
is= ap i.e.o
.e
- r.,,
..ee e
esaaen esa=
ee ee A-a.
t i
.ie,,e.u,,
s t..
se a si a =
.e.
s.qt e.8 e y
en, no.
seg de.g 4.e re.n gn 3
.rwt NRC ets wes is 4 80 menes(M g
Q s
se y aevo
- mensue, B.
e l
is l
8 l
I
-e l
l ge.
e e,
em a=o oise T
l l
l 1
i I
I i
9 l
l f//2j@l8 l
l l
l 1
I I
I I
i i
I l-l I
e l
l c/oln 0
l i
i i
i i
l i
l 14 1
21 1
27 31 l
39 l 44 l
50 153l56!
72 3I I I
I I
I I I I
I I
I I
I I I I I I
z5 5 5
5 5
I I I I
I I
E I
E 5 5 5 3
- ' 5
-0i n
24 37 g
43 as I
l2s l
g 52 l 54 l Ss l
w 2
I I
l l
l 1
I I
l 1
i i
i i
l l
I i
i i
I I
l 4
I I
i i
0 l
l l
1 l
l i
l g
l ois.
l 1
I
~.
-e j
.essauntos l
.me e f es 6
g so.nues B
[
D,eh.ee oise gg l
ea.a* and s.ua es TS
.ew or O ""'**"
os no -
.ew.sa is as,. i
.o.pe.e er orse e
oise
.e*
s=.e.*
oiss
==een eve se,e,.
l
**8"-
.e
-ee-e.
e eu. ems oise sign Peeven a
.sen.
pas e a, a
ee SIR i.h up e ai. ep
- g. pero and oise maeaeWee is Fsan pones " A'"
f O _.-
-'.s.-
e,'is.
.t
--.'.'.e.
-' ' ' '5a
~~
.e.-
,e.e o.e is o
.=s tu as se,er
.ev.s.
een of Ts we.een of m aegiunal so apph by ensape 44ehe aI is eeued Oe e.c Ts anosotwo 4.se.sh o e 30 days t Is as sevs T k e
<e ce eens een sep.e ser weh rwe W.W b IIs e.g IM 8.*e.d
. meek gyp 5.eek typ Gr.a6 810488*5 fleg.U., er 3 Budtent ts
.eeuent e Po,er navss de,s.
9ess eeht e.gt sign ts deyg3 533 dayst eu.th kenee tiger.ee i
f 8
l l