ML20151Z461
| ML20151Z461 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 05/02/1988 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20151Z465 | List: |
| References | |
| EA-88-125, NUDOCS 8805050277 | |
| Download: ML20151Z461 (2) | |
See also: IR 05000456/1988015
Text
...
. .
sisEGJAR3S%04W5M
" '"
?
.
.
MAY 0 21988
Docket No. 50-456
Docket No. 50-457
EA 88-125
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Senior Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the special safeguards inspection conducted by Mr. J. R. Kniceley
of this office on April 20-21, 1988, of activities at Braidwood Nuclear Power
Station, Units 1 and 2, authorized by NRC Operating Licenses No. NPF-72 and
No. NPF-75 and to the discussion of our findings with Mr. R. Querto and other
members of your staff at the conclusion of the inspection.
During this inspection, certain of your activities appeared to be a potential
violation of NRC requirements. You will be notified by separate correspondence
of our decision regarding enforcement actions based on the findings of this
inspection.
No wr16 ten response is required until you are notified of the
proposed enforcement action.
Areas examined during this inspection concern a subject matter which is exempt
from disclosure according to Part 73, Title 10, Code of Federal Regulations,
Section 73.21(c)(2).
This information must be handled and protected in
accordance with the provisions of 10 CFR 73.21.
Consequently, our report of
this inspection will not be placed in the NRC Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
ORIGINAL SIGNED BY C. E. NORELIUS
1
Charles E. Norelius, Director
d
0
Division of Radiation Safety
g6
.
and Safeguards
g
Enclosure:
Inspection Reports
No. 50-456/88015(DRSS);
Enclosure contatns
No. 50-457/88016(DRSS)
SAFEGUARDS INFORMATION
,
(UNCLASSIFIED SAFEGUARDS INFORMATION)
Upon separation this
"
See Attached Distribution
'
-
d)( ,p
b\\" '
RIII
RIII
RII
RIII
RI
RIII
RIII
Knic
y/ jaw
MIdYda
Cr ed
erson
Mal ett
N
6)Ms
,
$$$' $$$5 $$$$8$s6
MM
"
Q
,
. - -
_
_ _ _ _ _ _ _ _ _
<
, .
o
D a
~ ~r ' I A 3 30
' s t n a n ,r g, n y
'
VD'
' L Jn
h su
t,
v,u,,,i,,v,<
Commonwealth Edison Company
2
MAY 0 21988
Distribution
cc w/ enclosure:
T. J. Maiman, Vice President,
PWR Operations
H. Bliss, Nuclear
Licansing Manager
M. Wallace, Manager of Projects
M. Lohmann, Project Construction
'
and Startup Superintendent
W. Vahle, Construction
Superintendent
R. E. Querto, Station Manager
P. L. Barnes, Regulatory
Assurance Supervisor
NRR/DRIS/SGB
NRR/DRIS/ SIB
J. Lieberman, OE
L. Chandler, OGC
F. Miraglia, NRR
cc w/ enclosure, w/o
UNCLASSIFIED SAFEGUARDS
INFORMATION:
DCD/DCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
D. W. Cassel, Jr. , Esq.
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, 0GC
G. Berry, OGC
Stephen P. Sands, NRR
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB
The Honorable Ivan W. Smith, ASLB
The Honorable Gary J. Edles, ASLAP
The Honorable Dr. W. Reed Johnson, ASLAP
The Honorable Christine N. Kohl, ASLAP
g# "a rrn e i a n no ,,, r, m .
Enclosure contafns
. . . . . , ,
-u"'"suulaivitnog,,c,
SAFEGUMDS ItiFORf'AT
Upon separation this
Pa70 is Decentrolled