ML20151Z004

From kanterella
Jump to navigation Jump to search
Forwards Response to NRC Re Violations Noted in Insp Rept 50-344/88-05.Response Withheld
ML20151Z004
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 04/29/1988
From: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8805050172
Download: ML20151Z004 (1)


Text

r

. SAFEGUARDS INFORMATION I sums. 4 i e__ me Portland General Electric Corpraiy 1

l GC David W. Cockfield Vice President. Nuclear April 29, 1988 L Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington DC 20555

Dear Sir:

Response to Notice of,Violt,ti_on By Nuclear Regulatory Commission letter dated March 30, 1988 (Montgomery to Cockfield), Portland General Electric Company received Inspection Report 88-05 and a Notice of Violation concerning security requirements at the Trojan Nuclear Plant. Our response to the Notice of Violation is attached.

Sincerely,

& (&

Attachment c: Mr. John B. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. William Dixon State of Oregon Department of Energy Mr. R. C. Barr NRC Resident Inspector Trojan Nuclear Plant Unclassified Alen separated from Safeguards Information orelosures.

8805050172 880429 PDR ADOCK 05000344 O

DCD

/ Mqph SAFEGU ARDS INFORif. ATION l  :

l wsvm v sw v u c m 9uca