Forwards Safety Insp Rept 50-423/85-75 on 851209-13.No Violations Noted
ML20151Y703
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/06/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20151Y707 List:
References
NUDOCS 8602130103
Download: ML20151Y703 (2)


See also: IR 05000423/1985075

Text

. -- _ . _ . _ - -. . _ .- - . . _ _ _ - - - -.. . . _ - _ . .-..

.

.

.-F

.

W

.

FEB 6 1986

I

Docket No. 50-423 License No. CPPR-113

,

Northeast Nuclear Energy Company .

ATTN: Mr. J. F. Opeka '

i Senior Vice President - Nuclear ,

Engineering and Operations Group ,

'

P. O. Box 270

l Hartford, Connecticut 06101

Gentlemen:

1

Subject: Inspection Report No. 50-423/85-75

4

This refers to the routine safety inspection conducted by Mr. Henri F. vanKessel

,

'

of this office on December 9-13, 1985, at Millstone Nuclear Power Station, Unit  ;

3, Waterford, Connecticut, of activities authorized by NRC License No. CPPR-113

and to the discussions of our findings held by Mr. Van Kessel with Mr. W. Richter

of your staff at the conclusion of the inspection.

I Areas examined during this inspection are described in the NRC Region I Inspec-

i tion Report which is enclosed with this letter. Within these areas, the inspec-

<

tion consisted of selective examinations of procedures and representative records,

'

interviews with personnel, and observations by the inspector. ,

Within the scope of this inspection, no violations were observed,

j Your cooperation with us in this matter is appreciated.

l

Sincerely,

I or,iginal Sieurt. By 8

b  ?! [

.

/ tewart D. bneter, Director

j Division of Reactor Safety

Enclosure: NRC Region I Inspectf6n Report No. 50-423/85-75 I

i

'

1

'

s

! '

I

'

D602130103 060206

PDR ADOCK 05000423 i

G PDR [

i

1

} OFFICIAL RECORD COPY IR MILL 3 85-75 - 0001.0.0

02/05/86

i e tt

l I


_ _- _ _ _ _ _ -

-_

.

9

'

Northeast Nuclear Energy Company 2

cc w/ encl:

V. Papadopoli, Construction Quality Assurance Supervisor

E. R. _ Foster, Director of Generation Construction

E. J. Mroczka, Vice President, Nuclear Operations

D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

W. D. Romberg, Station Superintendent

Public Document Room (PDR)

local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

,

E. C. McCabe, Chief, Section 3B, DRP

G. Walton, SRI, BV-2

T. Shediosky, SRI, Millstone 1&2

B. Doolittle, LPM, NRR

g

F

RI:0RP D RI RI:DRP

vanKessel/ca/ms E Bettenhausen

3*3 v.

2/b/86 2/.f/86 2/4/86

0FFICIAL RECORD COPY IR MILL 3 85-75 - 0002.0.0