Forwards Errata to Project Status Repts Mechanical Suppls a & B, Sys Interaction & Fire Protection, Respectively
ML20151Y448
Person / Time
Site: Comanche Peak  
Issue date: 04/29/1988
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
TXX-88431, NUDOCS 8805050005
Download: ML20151Y448 (9)


Text

,

a M

.9 Log #-TXX-88431 4

C File # 10068 r

C 10010 clo 1UELECTRIC April 29, 1988 w un. c. co u aan.u.aua r nam V. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL 0F PROJECT STATUS REPORT ERRATA Gentlemen:

fnclosed are fif teen (15) copies of the errata prepared for the following Project Status Reports (PSR):

Nechanical Supplement A - Systems Interaction Mechanical Supplement B - Fire Protection Please place the errata tab and enclosure at the end of the appropriate PSR.

The Project Status Reports were previously transmitted via 1XX-88117 dated January 25, 1988.

The Atomic Safety and Licensing Board will be notified of this transmittal by a separate letter from our attorneys.

Very truly yours, H

W. G. Counsil TLS/mgt Enclosures c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) 1 d$0"ASSEE5l888!!g g o$i o

DCD g

i 400 Nonk Olbs Street LD &l Dalk. Teus 7D01

4 Errata I

Mechanical Supplement A - Systems Interaction PSR PSR Pace Line/ Item No.

Correction 5-18 10 After "TU Electric Quality Assurance (QA)," add "the Engineering Assurance Surveillance Group (EA),"

5-18 12 Change "9" to "16" 5-18 20 Af ter "(TAP)" add ", the Engineering Assurance Surveillance Group (EA),"

TABLE 5-2, ATP-87-45 Change "Sep 8," to "Sep 11,"

AUDITS ATP-87-62 Change Audit Response Transmittal from "In Progress'd to "Jan. 18, 1988" TABLE 5-2, 12 Change "SURVEILLANCES-TU SURVEILLANCES ELECTRIC OUALITY ASSURANCE ENGINEERING SURVEILLANCE" TO "SURVEILLANCES-TU ELECTRLQ t "IEILLANCE" o

New Add:

ES-87-52, CPSES, Oct 5-20, 1987, Nov 17, 1987 New Add:

ES-87-55, CPSES, Oct 28-Nov 13, 1987, Nov 24, 1987._

r Errata O

Mechanical Supplement A - Systems Interaction PSR PSR Pace Line/ Item No.

Correction TABLE 5-2, New Add:

ES-88-01, CPSES, Dec SURVEILLANCES 16-21, 1987, Jan 8, 1988 New Add:

ES-88-04, CPSES, Dec 15, 1987-Jan 6, 1988, Jan 14, 1488 New Add:

EASR 87-89, CPSES, Dec. 29, 1987 - Jan.

7,

1988, In Progress

(

)

New Add:

TSR 87-59, Nov.

9, 1987-Nov. 14, 1987, Jan. 12, 1988 l

New Add:

ES-88-07, CPSES, In progress 6-1 12 Change "CPE-EB-FVM-DS-28" I

to "CPE-EB-FVM-SI-28" l

6-3 32 Change "Revision 5" to l

"Revision 6" l

i 6-3 39 Change "July 31" to "July 30" l

i l,

l Errata

()

Mechanical Supplement A - Systems Interaction PSR 4

PSR Pace Line/ Item No.

Correction i

y 6-3 43 Change "ECE-9.04, Control j

of the Post Construction Hardware Validation Program Manual, dated September 1987" to "EC 9.04 Post Construction Hardware Validation Program, Rev.

2, dated September 30, 1987" l

1 6-3 44 Change "DAP-L-40" to "DAP-L-163A"

('

Al-4 4.8 Change "Type" to "Pipe" 1

Al-4 4.13 Change "Terra" to "Tera" A3-1 1.2 Delete entire paragraph and replace with: "The issue was that interactions between pipes / conduits and cable trays were originally resolved based on inadequate criteria."

4 l

i

($)

1 1 :

_ ~.

~

Errata

()

Mechanical PSR Supplement B - Fire Protection PSR Pace Line/ Item No.

Correction 5-17 35 Change "37" to "39" l

j

{

Table 5-3 TCP-87-12 Change "Jul.

2" to "Jul.

1" page 1 e

l ATP-87-20 Change "July 20" to "July 14" ATP-87-71 Change "Dec. 23" to "Dec. 2 2

I Table 5-3, ES-86-02 Change "Dec. 8-12" to "Nov.

page 2 12-21" SO9-1208 Change "Jan. 23" to "Jan 22" SO9-1214 Change "Mar. 23" (Report Transmittal column) to "Mar. 31" SO9-1216 Change "Apr. 25" to "Apr. 30" l

Table 5-3, ES-87-34 Change "Aug. 10-14, 1987" to page 3 "July 28-Aug.

6, 1987" ES-87-42 Change "Aug. 14" to "Aug. 24" O I

Errata Mechanical PSR Supplement B - Fire Protection l

l PER_ Pace Line/ Item No.

Correction l

Table 5-3, SO9-1231 Change "Sep. 17" to "Sep. 18" page 3 11-S003 Change "Oct. 27" to "Oct. 23" and "Oct. 28" to "Oct. 27" 11-S016 Change "Dec. 24" to "Dec. 30" I

New Add:

ES-86-01, TU Electric QA, Nov. 12-19, 1986, Dec. 18, 1986

}

New Add:

ES-87-33, TU Electric QA, July 15-30, 1987, Aug. 12, 1987 6-2 22 Change "September 22" to "Septenber 23" 6-3 31 Change "April 13" to "June 10" 1

t 6-3 34 Change "1986" to "1987" 1

l 6-3 37 Change "CPE-SWEC-FVM-EE/

ME/IC/SC-090" to "CPE-SWEC-FVM-EE/ME/IC/CS-90" O I n _. - - --

-,--,------~----._____,n,

Errata l

()

Mechanical PSR Supplement B - Fire Protection l

PSR Pace Item /Line No.

Correction 6-3 40 Change "Westinghouse Technical Manual, "RCP Motor Lubrication Oil Cooler",

I August 17, 1982." to "Westinghouse Instruction Book I.B.5710-100-09, "Reactor Cot-lant Pump" Volume 1, Rev.

2, September 1986."

6-3 44 Change "CPE-SWEC-TVM-EE/

ME/IC/SC-86" to "CPE-SWEC-FVM-EE/ME/IC/CS-086" 6-3 45 Change "August 17" to "September 1" A2-2 4.6 Change "Metal Pan Type Ceilings" to "Metal Pan Ceilings" A3-1 4.2 Change "Rev.

3" to "Rev.

2" A5-2 4.1 Change "April 13" to "June 10" O

l Errata

(}

Mechanical PSR Supplement B - Fire Protection PSR Pace Line/ Item Correction A6-2 4.2 Change "CPE-FVM-FP-045, Instructions for Review of Inadvertent Actuation and Flooding and Its Effect on Safety Related Equipment" to "CPE-IM-FP-045, "Inadvertent Actuation Impact on Redundant Safe Shutdown i

Equipment,"

A6-3 4.3 Change "Preparation and Review of Design Basis Documents" to "Freparatioa of Design Basis Documents" J

()

A7-5 4.11 Change "Motor Protection" to A9-2 4.3 "Protection Philosopy" A7-6 4.15, 4.17 Change "Rev.

3" to "Rev.

2" A9-2 4.7, 4.9 4

A7-6 4.16 Change "Rev.

1" to "Rev.

0" A9-2 4.8 l

A7-6 4.17 Change "FSSA Database Change A9-2 4.9 Package Preparation" to "Unit 1 FSSA Database Change Package Preparation" 4

(,

I

I l

l Errata l

Mechanical PSR Supplement B - Fire Protection l

PSR Pacq Line/ Item Correction 4

i i

A7-6 4.18 Change "Review of Design l

A9-2 4.10 Modifications for Appendix R Fire Safe Shutdown Compliance" to "Review of Design j

Modifications for CPSES Fire i

Safe Shutdown Analysis 1

Compliance" 1

j i

i j

i O

i l

l i

l 1

i 4

lo

' l

. ---..-.-.-..i

.