Text
-
'
'
.
)
.
.
MG 17 1989
Docket Nos.
50-277
License Nos. DPR-44
50-278
Philadelphia Electric Company
ATTN: Mr. C. A. McNeill
Executive Vice Pre:ident
Nuclear
2301 Market Street
Philadelphia, Pennsylvania 19101
Gentlemen:
Subject: Combined Inspection Report Nos. 50-277/88-27 and 50-278/88-27
A routine safety inspection of your emergency preparedness program was
conducted by Mr. C. Conklin of this office on August 2-4, 1988, at the Peach
Bottom Atomic Power Station, Delta, Pennsylvania.
Discussions of our
findings were held by Mr. Conklin with your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the NRC Region I
inspection report which is enclosed. Within these areas, the inspection
consisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were identified.
No reply to this letter is required.
Your cooperation with us in this matter
l
is appreciated.
l
Sincerely,
!
Orir,inal Gigned By:
Rwald R. Ballamy
Ronald R. Bellamy, Chief,
Facilities Radiological Safety
and Safeguards Branch
l
Enclosure:
NRC Region I Combined Inspection Report Nos. 50-277/88-27 and 50-278/88-27
\\*
OFFICIAL RECORD COPY
!h
l 9F//fffJJ e/KW2
0LI
v
9
Pn
.v
. _ . _ _
- . , _
,s
'
.
Philadelphia Electric Company
2
017798
cc w/ encl:
John S. Kemper, Sr., Senior Vice President - Nuclear
E. C. Kistner, Chairman, Nuclear Review Board
Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co.
Dickinson M Smith, Vice President, Peach Bottom Atomic Power Station
J. W. Gallagher, Vice President, Nuclear Services
W. H. Hirst, Director, Joint Generation Projects Department, Atlantic
Electric
Bryan W. Gorman Manager, External Affairs
JohnF. Franz,klantManager,PeachBottomAtomicPowerStation
Troy B. Conner Jr
Esquire (Without Report
EugeneJ.Bradley,. Esquire,AssistantGenera? Counsel
Raymond L. Hovis, Esquire (Without Report)
Thomas Magette, Power Plant Siting, Nuclear Evaluations
W. M. Alden, Director, Licensing Section
Doris Poulsen, Secretary of Harford County Council
Public Document Room (Room (LPDR)
PDR)
Local Public Document
Nuclear Safety Information Center (NSIC)
NRC Resident Ins)ector
Commonwealth of )ennsylvania
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
J. Linville,DRP Section Chief
T. Johnson, SRI, Peach Bottom
Robert J. Bores, DRSS
pr b
l
Laz
Bellamy
Conklin
q/hrus
S8
8/p/88
8/6/88
0FFICIAL RECORD COPY
l
l
l
l
l