ML20151Y207

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-277/88-27 & 50-278/88-27 on 880802-04.No Violations Noted
ML20151Y207
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/17/1988
From: Bellamy R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20151Y212 List:
References
NUDOCS 8808260280
Download: ML20151Y207 (2)


See also: IR 05000277/1988027

Text

' '

-

.

)

. .

MG 17 1989

Docket Nos. 50-277 License Nos. DPR-44

50-278 DPR-56

Philadelphia Electric Company

ATTN: Mr. C. A. McNeill

Executive Vice Pre:ident

Nuclear

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject: Combined Inspection Report Nos. 50-277/88-27 and 50-278/88-27

A routine safety inspection of your emergency preparedness program was

conducted by Mr. C. Conklin of this office on August 2-4, 1988, at the Peach

Bottom Atomic Power Station, Delta, Pennsylvania. Discussions of our

findings were held by Mr. Conklin with your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the NRC Region I

inspection report which is enclosed. Within these areas, the inspection

consisted of selective examination of procedures and representative records,

interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were identified.

No reply to this letter is required. Your cooperation with us in this matter

l is appreciated.

l

Sincerely,

!

Orir,inal Gigned By:

Rwald R. Ballamy

Ronald R. Bellamy, Chief,

Facilities Radiological Safety

and Safeguards Branch

l

Enclosure:

NRC Region I Combined Inspection Report Nos. 50-277/88-27 and 50-278/88-27

\*

OFFICIAL RECORD COPY !h

l 9F//fffJJ

9

e/KW2 0LI v

.v Pn

. _ . _ _ - . , _ ,s

'

.

Philadelphia Electric Company 2 017798

cc w/ encl:

John S. Kemper, Sr., Senior Vice President - Nuclear

E. C. Kistner, Chairman, Nuclear Review Board

Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co.

Dickinson M Smith, Vice President, Peach Bottom Atomic Power Station

J. W. Gallagher, Vice President, Nuclear Services

W. H. Hirst, Director, Joint Generation Projects Department, Atlantic

Electric

Bryan W. Gorman Manager, External Affairs

JohnF. Franz,klantManager,PeachBottomAtomicPowerStation

Troy B. Conner Jr Esquire (Without Report

EugeneJ.Bradley,. Esquire,AssistantGenera? Counsel

Raymond L. Hovis, Esquire (Without Report)

Thomas Magette, Power Plant Siting, Nuclear Evaluations

W. M. Alden, Director, Licensing Section

Doris Poulsen, Secretary of Harford County Council

PDR)

Public

Local Document

Public Document Room (Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Ins)ector

Commonwealth of )ennsylvania

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

J. Linville,DRP Section Chief

T. Johnson, SRI, Peach Bottom

Robert J. Bores, DRSS

l pr b

Conklin Laz Bellamy

8/6/88 q/hrus

S8 8/p/88

0FFICIAL RECORD COPY

l

l

l

l

l

I

l  ;