ML20151Y189
| ML20151Y189 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 09/09/1998 |
| From: | Gordon Peterson DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20151Y194 | List: |
| References | |
| NUDOCS 9809180145 | |
| Download: ML20151Y189 (1) | |
Text
.,
['~ g Duk3 Energy Corporatlin g't Catawba Nudear Station
=
4800 Concord Road York, SC 29745 Gary R. Petenon (803) 8314251 om Vice kidn (803) 831-3426 Mx September 9, 1998 l
l U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, DC 20555-0001
Subject:
' Duke Energy Corporation Catawba Nuclear Station Units 1 and 2 l
Docket Nos. 50-413 and 50-414 Emergency Plan Implementing Procedures Please find enclosed for NRC Staff use and review the following Emergency Plan Implementing Procedures:
OP/0/A/6200/021, Operating Procedure for the Post Accident Liquid Sampling System II+ (8/26/98)
SR/0/B/2000/003, Activation of the Emergency Operations Facility (8/20/98)
Please delete the following Emergency Plan Implementing Procedure:
RP/0/A/5000/021, The Emergency Operations Facility (EOF)
Activation Procedure These revisions are being submitted in accordance with 10CFR
- 50. 54 (q) and do not decrease the effectiveness of the Emergency Plan Implementing Procedures or the Emergency Plan.
By copy of this letter, two copies of the above documents are being provided to the NRC, Region II.
If there are any questions, please call Steve Christopher at 803-831-4027.
Very uly yours, D
j D b
i ary R.
Peterson Attachments 9809180145 980909 PDR ADOCK 05000413 F
PM 4
i
a_m
-a d
+
,.a.
- .m--+-
i-4w a
r.....
U.S. Nuclear Regulatory Commission i
September 9, 1998 Page 2 l
xc (w/ attachments):
l L. A.
Reyes U.S.
Nuclear Regulatory Commission Regional Administrator, Region II Atlanta Federal Center 61 Forsyth St.,
SW, Suite 23T85 i
Atlanta, GA 30303 (w/o attachments):
P.
S. Tam NRC Senior Project Manager (CNS)
U.S. Nuclear Regulatory Commission Mail Stop O-14H25 Washington, DC 20555-0001 D.
J.
Roberts Senior Resident Inspector (CNS)
U.S.
Nuclear Regulatory Commission Catawba Nuclear Site
Page1of4 DUKE POWER COMPANY CATAWBA NUCLEAR STATION 1
EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX O
VOLUMEI L
l PROCEDURE TITLE l
RP/0/A/5000/001 Classification of Emergency (2/17/98)
RP/0/A/5000/002 Notification of Unusual Event (6/25/98)
RP/0/A/5000/003 Alert (6/25/98)
RP/0/A/5000/004 Site Area Emergency (6/25/98) l f-RP/0/A/5000/005 General Emergency (6/25/98)
RP/0/A/5000/06 Deleted RP/0/A/5000/006 A Notifications to States and Counties from the Control Room (2/26/98) l.
RP/0/A/5000/006 B Notifications to States and' Counties from the Technical Support Center (2/26/98) j RP/0/A/5000/006 C Notifications to States and Counties from the Emergency Operations Facinty l (7 (2/26/98)
- . %)
RP/0/A/5000/007 Natural Disaster and Earthquake (6/10/97)
RP/0/A/5000/08 Deleted
' RP/0/B/5000/008 Spill Response (6/7/98)
RP/0/A/5000/009
. Collision / Explosion (3/3/97)
RP/0/A/5000/010 Conducting A Site Assembly or Preparing the Site for an Evacuation (6/29/98) l RP/0/A/5000/11 '
Deleted I
RP/0/B/5000/12 Deleted RP/0/B/5000/013 NRC Notification Requirements (11/13/97)
. RP/0/B/5000/14 Deleted l'
RP/0/A/5000/015 Core Damage Assessment (7/27/98)
RP/0/B/5000/016 Deleted
~
RP/0/B/5000/17 Deleted September 9,1998 L;
i Page 2 of 4 DUKE POWER COMPANY CATAWBA NUCLEAR STATION n
EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX
~
PROCEDURE-TITLE RP/0/A/5000/018 Emergency Worker Dose Extension (1/15/96)
RP/0/B/5000/019 Deleted RP/0/A/5000/020 Technical Support Center (TSC) Activation Procedure (7/27/98)
RP/0/A/5000/021 Deleted RP/0/B/5000/022 Evacuation Coordinator Procedure (6/29/98)
.. RP/0/B/5000/023 Deleted RP/0/A/5000/024 OSC Coordinator Procedure (7/27/98)
RP/0/B/5000/025 Recovery and Reentry Procedure (2/17/98)
RP/0/B/5000/026 Response to Bomb Threat (5/30/96)
RP/0/B/5000/028 Communications and Community Relations EnergyQuest Emergency l
Response Plan (2/27/97)
- (./
September 9,1998
Page 3 of 4 DUKE POWER COMPANY CATAWBA NUCLEAR STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX VOLUME 11 PROCEDURE TITLE
~ HP/0/B/1000/006 Emergency Equipment Functional Check and Inventory (Rev 52)
HP/0/B/1009/001 Radiation Protection Recovery Plan (Rev. 007) i HP/0/B/1009/003 Radiation Protection Response Following a Primary to Secondary Leak (Rev 007)
HP/0/B/1009/004 Environmental Monitoring for Emergency Conditions Within the Ten-Mile Radius of CNS (Rev. 0)
HP/0/B/1009/005 Personnel / Vehicle Monitoring for Emergency Conditions (Rev. 016)
HP/0/B/1009/006 Alternative Method for Determining Dose Rate Within the Reactor Building (Rev. 007)
HP/0/B/1009/007 in-Plant Particulate and Iodine Monitoring Under Accident Conditions 4
(Rev. 017)
HP/0/B/1009/008 Contamination Control During Transportation of Contaminated Injured ~
Individuals (Rev. 014) h HP/0/B/1009/009 Guidelines for Accident and Emergency Response (Rev. 037)
HP/0/B/1009/014 Radiation Protection Actions Following an Uncontrolled Release of L
Radioactive Material (Rev. 007)
HP/0/B/1009/016 Distribution of Potassium Iodide Tablets in the Event of a Radioiodine Release (Rev 010)
HP/0/B/1009/017 Post-Accident Containment Air Sampling System (Rev. 013) r-HP/0/8/1009/018 Deleted HP/0/B/1009/019 Emergency Radio System Operation, Maintenance and Communication
. (Rev. 010)
HP/0/B/1009/024 Implementing Procedure for Estimating Food Chain Doses Under Post-Accident Conditions (Rev. 002)
HP/0/B/1009/025 Emergency Response OfTsite Dose Projections (Rev. 001)
L
- HP/0/B/1000/026 On-Shift Offsite Dose Projections (Rev. 0)
L i-
, OP/0/A/6200/021 Operating Procedure for the Post Accident Liquid Sampling System 11+
l (Rev. 029)
SR/0/B/2000/001 Standard Procedure for Public AfTairs Response to the Emergency Response Facility (Rev. 001)
September 9,1998 f
Page 4 of 4
.n DUKE POWER COMPANY V
CATAWBA NUCLEAR STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX VOLUME 11 PROCEDURE TITLE SR/0/B/2000/002 Standard Procedure for EOF Commodities and Facilities (Rev. 0)
SR/0/B/2000/003 Activation of the Emergency Operations Facility (Rev. 0) l l
l t
I i
L l
l-I l
l r
September 9,1998 i
i
1 l
September 9,1998 lO I
Please delete the following procedure from your Catawba Nuclear Station Emergency Plan Implementing Procedures Manual:
RP/0/A/5000/021, The Emergency Operations (EOF) Activation Procedure sb_Y od %w Steven'If Christo%er Emergency Planning Manager O
4
- O
!