ML20151Y168

From kanterella
Jump to navigation Jump to search
Confirms 880428 Enforcement Conference in Region III Ofc to Discuss Failure to Enter Appropriate Action Statements for Limiting Condition for Operations Associated W/Standby Gas Treatment & Control Ctr HVAC Sys,Per 880421 Telcon.W/Encl
ML20151Y168
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/27/1988
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Sylvia B
DETROIT EDISON CO.
References
EA-88-104, NUDOCS 8805040375
Download: ML20151Y168 (2)


Text

. .

Docket No. 50-341 APR 2 7J988 EA 88-104 The Detroit Edison Company ATTN: B. Ralph Sylvia l Group Vice. President l Nuclear Operations 6400 North Dixie Highway Newport, MI 48166 Gentlemen:

This confirms our plans as discussed on April 21, 1988, between R. W. Cooper, II of my staff and L. Goodman of your staff to conduct an Enforcement Conference at 9:30 a.m. (CDT) on Thursday, April 28, 1988, at the Region III office in Glen Ellyn, Illinois. The conference.is to discuss two potential escalated enforcement issues. The first concerns the failure to enter appropriate action statements for LCOs associated with the Standby Gas Treatment and Control Center HVAC systems due to the inoperability of the Non-interruptable Control Air System. The second concerns the failure to evaluate the deviations between the as-built Primary Containment Radiation Monitor System and the UFSAR in accordance with 10 CFR 50.59.

We will gladly discuss any questions you may have concerning this matter.

Sincerely,

~8 0dg{nal $1gned by E.C. Greeman#

Edward G. Greenman, Director Division of Reactor Projects cc w/ enclosure:

Patricia Anthony, Licensing P. A. Marquardt, Corporate Legal Department DCD/DCB (RfDS)

Licensing Fee Management Branch Resident Inspector, RIII ,

Ronald Callen, Michigan '

Public Service Connission i Harry H. Voight, Esq.

Michigan Department of l Monroe u fice of h!k $O0ck $!0$b41 Civil Preparedness G PDR ~

J. R. Goldberg, 0GC  !

F. J. Miraglia, NRR J. Lieberman, OE WJ \l0 "J[gm ($ / RHj R

g RH f RH gy Pelke/pb Gr

~

er Kno Virgilio Gre d '

f YMn 'fra 4h $$ qpcp ,

l

---, J i_ ( )

,y-- -

j pW4( UNITED STATES 4 *g NUCLEAR REGULATORY COMMisslON REGloN lli E ~j 799 noostvtLT noAo t cLtN ELLvn, stusois soin

%,*... /a 1APR 2 71988 NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee: The Detroit Edison Company Name of Facility:' Fermi 2 Date and Time of Meeting: Thursday, April 28, 1988, at 9:30 a.m. (CDT) location of Meeting: V. S. Nuclear Regulatory Commission Region III Office 799 Roosevelt Road Glen Ellyn, Illinois 60137 Purpose of Meeting: Enforcement {0nference to discuss: (1) the failure to enter appropriate action statements for LCOs associated with the Standby Gas Treatment and Control Center HVAC systems due to the inoperability of the Non-interruptable Control Air System and (2) the failure to evaluate the deviation between the as-built Primary Containment Radiation Monitor System and the UFSAR in accordance with 10 CFR 50.59.

Region III Attendees:

Dr. C. J. Paperiello, Deputy Regional Administrator E. G. Greenman, Director, Division of Reactor Projects M. J. Virgilio, Acting Deputy Director, Division of Reactor Projects R. C. Knop, Chief, Projects Branch 3, Division of Reactor Projects R. Cooper, Chief, Projects Section 3B, Division of Reactor Projects W. G. Rogers, Senior Resident Inspector Others as designated by Region III NRR Attendees:

T. R. Quay, Licensing Project Manager Licensee Attendees:

B. Ralph Sylvia, Group Vice President W. S. Orser, Vice President Nuclear Operations Others as designated by the licensee Note: Attendance at this meeting by NRC personnel should be made known to P. Pelke via telephone call (FTS 388-5560) by COB April 27, 1988.

Distribution:

J. M. Taylor, Deputy Executive Director for Regional Operations T. E. Murley, Director, Office of Nuclear Reactor Regulation ,

J. G. Partlow, Director, Division of Reactor Inspection and Safeguards D. M. Crutchfield, Director, Division of Reactor Projects III/IV/V, NRR F. Miraglia, Associate Director for Projects, NRR G. Holahan, Assistant Director for Region III and V, NRR M. Johnson, RIII Coordinator, EDO T. V. Wambach, Acting Director, Project Directorate III-1, NRR l T. R. Quay, Licensing Project Manager, NRR ,

j J. Lieberman, Director, Office of Enforcement J. R. Goldberg, Office of General Counsel 1 i

-