Forwards Operations Safety Team Insp Rept 50-213/88-06 on 880307-11.No Violations Noted.Lack of Consolidated & Formal Review Process to Assure Readiness for Startups & Lack of Adherence to Administrative Control Procedures Noted
ML20151X730
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 04/25/1988
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20151X735 List:
References
NUDOCS 8805040233
Download: ML20151X730 (2)


See also: IR 05000213/1988006

Text

_

~

.-:). (> ; - .

. . .

&

APR 2 51988

Docket / License: 50-213/DPR-61

Connecticut Yankee Atomic Power Company

-ATTN: 'Mr; E. J.-Mroczka

Senior Vice President --Nuclear

Engineering and Operations

'P. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject: Team Inspection 50-213/88-06 (March 7-11, 1988)

This-transmits the findings of ~an operations safety team inspection led by Mr.

,.

R. Conte of my staff at the Haddam Neck Plant. The inspection team reviewed your

preparations for operation af ter the extended Cycle 15 refueling outage. The in-

spection findings were discussed with Mr._ D. B. Miller and other members of your

staff.

The team concluded that the plant was ready to proceed with mode changes up to full

power operations, assuming 5 tisfactory completion of identified items prior.to

these mode changes. We noted, however, the lack of a consolidated and formal re-

view. process to assure readiness for such startups. We understand that a formal

process is being developed for this. Please let us know if we have any misunder-

standings in this regard.

The team also identified. persistent lack of adherence to administrative control

procedures. Although no safety issues were identified, it is important that this

matter be addressed promptly to assure that it does not lead to a more serious

concern. We~ note that your corrective action systems are viable and should iden-

tify 'any associated conditions which may affect safety; however, you should remain

sensitive.to this persistent problem. ,

No response to this letter is required. Thank you for your cooperation in these

matters.

Sincerely,

i

CrisinaJ. 314;r.c& 4

- William F. Kane, Director

Division of Reactor Projects

l Enclosure: NRC Region I Report 50-213/88-06

!

l

,

<.

!

'

8805040233 880425

l

PDR ADOCK 05000213

Q DCD

OFFICIAL RECORD COPY DL50-213/88-06 - 0001.0.0 f

03/30/88 I

w l

_ -- .

_ . _ _ _ _ _ _ _ _ . _.

3 -- '

' * -

' , . it. 2'

-

r-

.. .

~

~ Connecticut Yankee Atomic-Power Company 2 APR 2 515

cc w/ enc 1:

LD. B. Miller,' Station Superintendent

D. 0. Nordquist, Director of Quality Services

R. M. Kacich, Manager, Generation Facilities Licensing

-W. D. Romberg, Vice President, Nuclear Operations

Geiald Garfield, Esquire.

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear-Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bec w/ enc 1:

Region I Docket Room

Management Assistant, DRMA

DRP Section Chief

W. Raymond, SRI, Millstone

R. Bores,.DRSS

R. Conte, SRI, TMI

M. Chatterton, NRR

.

-

RI:DRP RI:0RP DRI

_ o e/cph

3/.30/88

Mc be

44 (i 3 h///

hausen

9 e[

lllN

OFFILIAL RECORD COPY OL50-213/88-06 - 0002.0.0

03/30/88

,-- . _ -