Text
_
(> ; -
~
.-:).
.
.
.
.
&
APR 2 51988
Docket / License: 50-213/DPR-61
Connecticut Yankee Atomic Power Company
-ATTN: 'Mr; E. J.-Mroczka
Senior Vice President --Nuclear
Engineering and Operations
'P. O. Box 270
Hartford, Connecticut 06141-0270
Gentlemen:
Subject: Team Inspection 50-213/88-06 (March 7-11, 1988)
This-transmits the findings of ~an operations safety team inspection led by Mr.
R. Conte of my staff at the Haddam Neck Plant.
The inspection team reviewed your
,.
preparations for operation af ter the extended Cycle 15 refueling outage.
The in-
spection findings were discussed with Mr._ D. B. Miller and other members of your
staff.
The team concluded that the plant was ready to proceed with mode changes up to full
power operations, assuming 5 tisfactory completion of identified items prior.to
these mode changes. We noted, however, the lack of a consolidated and formal re-
view. process to assure readiness for such startups. We understand that a formal
process is being developed for this.
Please let us know if we have any misunder-
standings in this regard.
The team also identified. persistent lack of adherence to administrative control
procedures. Although no safety issues were identified, it is important that this
matter be addressed promptly to assure that it does not lead to a more serious
concern. We~ note that your corrective action systems are viable and should iden-
tify 'any associated conditions which may affect safety; however, you should remain
sensitive.to this persistent problem.
,
No response to this letter is required. Thank you for your cooperation in these
matters.
Sincerely,
i
CrisinaJ. 314;r.c& 4
William F. Kane, Director
-
Division of Reactor Projects
l
Enclosure: NRC Region I Report 50-213/88-06
!
l
,
<.
!
8805040233 880425
'
l
ADOCK 05000213
Q
OFFICIAL RECORD COPY
DL50-213/88-06 - 0001.0.0
f
03/30/88
I
l
w
_
--
.
.
.
.
3 --
' , . it. 2'
'
'
-
-
r-
..
.
~
~ Connecticut Yankee Atomic-Power Company 2
APR 2 515
cc w/ enc 1:
LD. B. Miller,' Station Superintendent
D. 0. Nordquist, Director of Quality Services
R. M. Kacich, Manager, Generation Facilities Licensing
-W. D. Romberg, Vice President, Nuclear Operations
Geiald Garfield, Esquire.
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear-Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
bec w/ enc 1:
Region I Docket Room
Management Assistant, DRMA
DRP Section Chief
W. Raymond, SRI, Millstone
R. Bores,.DRSS
M. Chatterton, NRR
.
RI:DRP
RI:0RP
DRI
-
e[
_
o e/cph
Mc be
hausen
3/.30/88
44 (i 3
h///
9
lllN
OFFILIAL RECORD COPY
OL50-213/88-06 - 0002.0.0
03/30/88
,--
.
-