ML20151X473
| ML20151X473 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 08/18/1988 |
| From: | Counsil W, John Marshall TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| TXX-88628, NUDOCS 8808250368 | |
| Download: ML20151X473 (1) | |
Text
l j.
.m M
FE Log # TXX-88628 File # 10130
=
=
IR 88-29 IR 88-25 7t/ELECTR/C Ref. # 10CFR2.201 l
gogg August 18, 1988 V. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington 0.C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS 50-445 AND 50-446 RESPONSE TO NRC INSPECTION REPORT N05.
50-445/88-29 AND 50-446/88-25 REF:
1)
TV Electric letter dated May 27, 1988, from Mr. W. G. Counsil to the NRC (Response to NRC IR fios. 50-445/88-29,50-446/88-25) 2)
TV Electric letter dated August 10, 1988, f rom fir. W. G. Counsil to the NRC (SDAR: CP-87-133)
Gentlemen:
In reference (1) a number of commitments with respect to Systems Interaction Program open items S-18 and S-30 were scheduled to be completed by August 18, 1988.
These commitments are part of the high energy line break analysis which is currently scheduled tu be completed by March 27, 1989 for Unit 1.
Therefore, the commitments associated with open items 5-18 and S-30 are now scheduled to be completed by March 27, 1989, for Unit 1.
The Systems Interaction Program for Unit 2 will be completed prior to Unit 2 fuel load.
Very truly yours, kl. G. C.w rJ W. G. Counsil By:
J. S. Marshall Generic Licensing Manager JCH/grr c - Mr. R. D. Martin, Region IV Mr. D. P. Norkin, NRC-0SP Resident inspectors, CPSES (3) l' n, e w s %
.