ML20151X374

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-458/88-17 on 880701-31.No Violations or Deviations Noted
ML20151X374
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/18/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
Shared Package
ML20151X378 List:
References
IEB-88-005, IEB-88-5, NUDOCS 8808250334
Download: ML20151X374 (2)


See also: IR 05000458/1988017

Text

_ _ _ _ _ _ _ _ . . _ - _ _ _ _ _ _ _ _ _ - _ . _ _ - _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ .

,,.. .

'

% .

,.

,

l

'In Reply' Refer To: M [$ g

-Docket: 50-458/88-17

Gulf States Utilities '

ATTN: Mr. James C. Deddens

Senior Vice President, (RBNG)

Nuclear Licensing -

  • .

P.O.. Box 220

St. Francisville, LA 70775

Gentlemen:

This refers.to the inspection conducted by Messrs. E. J. Ford, W. B. Jones and

P. W. Michaud of this office during the period July 1-31, 1988, of activities

authorized by NRC Operating License NPF-47 for the River Bend Station,- and to

the discussion of our findings with you and other members of your staff at the

conclusion of the inspection.

Areas examined during the inspection included review of licensee action on NRC

Bulletin 88-05, surveillance test observation, maintenance observation,

operational safety verification, radiological protection observation and

security. Withi'n these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with

personnel, and observations by the NRC inspectors. The inspection findings are

documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

~

-, Sincerely.

Onginal SLned Bp

A.B.DEACH

L. J. Callan, Director

Division of Reactor Projects

2

Enclosure: (see next page)

V- I O /C D:

hT//'2/88 ,rd ones

/1/88

chaud

f //t/88

G

f //2/88

$Iable LJCaTlan

6/17/88

-\

i

em m.

G

,

l

_ _ _ _ _ _ __ __ __ _ ______ _ __ _- _ _

.. .-

-? 6 > *

-

_c

^

Gulf States Utilities- -2-

-

.

7

. Enclosure..

'

Appendix - NRCLInspection Report

50-458/88-17 .

cc'w/ enclosure: .. ._.

Gulf States Utilities

,

ATTN:- Mr. J. E. - Booker, Manager-

River Bend Oversight

P.O. Box 2951

. Beaumont,' Texas 177704

Gulf States Utilities

ATTN:- Mr.-Les England. Director,

Nuclear Licensing 'RBNG

EP.O. Box 220

St. Francisville, Louisiana 70775

Louisiana State University,

Government Documents Department

. Louisiana Radiation Control Program Director

bec to DMB (IE01)

bec distrib by RIV:

~

  • DRP * Resident Inspector

R. D. Martin, RA *Section Chief (DRP/C)

  • Lisa Shea, RM/ALF * MIS System -

RPSB-DRSS . *RSTS Operator

'

  • Project Engineer, DRP/C *RIV File
  • W. Paulson, NRR Project Manager *DRS
  • w/766

,

W

h

$

I

i

,.