. N-FE log # TXX-88625
=
File # 10013
._r
=
Ref. # 10CFR50.34(b)
TUELECTRIC August 22, 1988
)
William G. coumil Executive Vke President V. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL OF CPSES EMERGENCY PLAN, REVISION 10 Gentlemen
- l In accordance with 10CFR50.34(b), TV Electric, the lead Applicant and acting for the other Applicants:
Texas Municipl Power Agency, Brazos Electric Power Cooperative, Inc., and Tex-La Electric Cooperative of Texas, Inc., herewith i
submits Revision 10 of the Emergency Plan (EP).
Revision 10 provides updates, revisions, additions, clarifications and editorial changes.
A detailed description, provided as Attachment 2, lists changes which are indicated by a Rev. 10 change bar and are classified as a clarification, correction, update, addition or revision.
Editorial changes are not discussed in the detailed description.
The following is a summary of the detailed description of this revision:
1)
Updated figures to reflect organization or emergency response / planning changes.
- 2) Added discussion about the Logistical Support Center.
3)
Updated the discussion about Squaw Creek Park.
4)
Revised discussion regarding dose assessment equipment and capabilities.
5)
Revised the discussion of support plans to delete the Westinghouse plan (now maintained as a separate reference document).
6)
U) dated Meteorological discussion to reflect recent modifications made to t1e system.
7)
Updated the Corporate Emergency Management Plan.
Previously, the Emergency Plan was submitted as an amendment to the FSAR.
(Revision 9 of the EP was transmitted as Amendment 58 on June 30, 1986.)
Beginning with this revision, the Emergency Plan will be transmitted as an independent document.
8808250278 880822 ib PDR ADOCK 0500044'5 gg F
PDC i 400 North Olive Street LB81 Dallas, Texas 73201
TXX-88625 August 22, 1988 Page 2 of 2 Enclosed is the following document as prescribed in 10CFR50.4(b)(5).
EMERGEfiCY PLAfi (EP) - 1 signed (and sworn)
REVISI0ft 10 original Very trul yours,
'[ML W. G. Counsil GLB/grr Attachments Enclosures c - Mr. R. D. Martin, Region IV (2)
Resident Inspectors, CPSES (3) i to TXX-88625 August 22, 1988 Page 1 of 1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of Texas Utilities Electric Company
)
Docket Nos. 50-445
)
50-446 (Comanche Peak Steam Electric
)
Station, Units 1 & 2)
)
AFFIDAVIT W. G. Counsil being duly sworn, hereby deposes and says that he is Executive Vice President, Nuclear Engineering and Operations of TV Electric, the Applicant herein; that he is duly authorized to sign and file with the Nuclear Regulatory Commission this Revision to'its supporting documentation for Operating Licenses for the captioned facilities; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.
b W.
G'. Counsil Executive Vice President, Nuclear Engineering and Operations STATE OF TEXAS Notary Seal COUNTY OF DALLAS ubscr$rtoibed and sworn to before me, a Notary Public in and for i
~
, on this _Z I day of U.uoual-
, 1988.
l DeRhL Hy coninission expires:
f7390
i to TXX-88625 Page 1 of 6 August 22, 1988 CPSES EMERGENCY PLAN REVISION 10 DETAILED DESCRIPTION EP Section Description Preface Revision:
Deletes reference to the specific annex of the Texas State Plan.
i
1.1.2 Addition
Adds clarifying statement regarding the Shift Supervisor's period of station.
1.1.2.1 Revision:
Changes "required" notification of support agencies to notification as necessary.
1.2.1 Update
Change reflects current organization name:
"TV Electric Nuclear Engineering and Operations Group." Adds reference to location of complete NE0 group discussion.
1.2.2 Revision
Adds reference to FSAR Chapter 13.
Adds reporting responsibility of Manager, Plant Operations and reduces overall MPO responsibilities from station operation to operations and maintenance [ departments].
Deletes MP0 replacements and adds reference to station procedure.
1.2.3 Update
Revises discussion to show that )ersonnel from all factions of the NE0 group ma<e up the Emergency Organization.
Revision:
Deletes references to a specific Emergency Plan Procedure and adds a generic reference to Emergency Plan Procedures.
1.2.3.1 Revision:
See Section 1.2.3; "Revision" 1.2.3.2 Revision:
Deletes specific individual assignments'and add specific responsibility for E0F activation and control.
1.2.3.4
, Update:
Discusses responsibilities of the Public Information Coordinator with respect to information releases issued from the site.
1.2.3.6 Update:
Reassigns selected duties of the Logistical Support Coordinator to the Logistical Support Center Manager.
1.2.3.8 Addition: Adds responsibility for LSC radiological concerns.
l
-, ~..
, to TXX-88625 Page 2 of 6 Auge t 22, 1988 CPSES EMERGENCY PLAN REVISION 10 DETAILED DESCRIPTION EP Section Description 1.2.3.14 Update:
Amends the discussion to address the corporate representative member.
1.2.3.18 Addition: Add the position of Logistical Support Center Manager and related responsibilities.
i 1.2.3.20 Addition: Adds reference to a licensed engineer who is qualified to fill the position of STA.
1.2.3.21 Addition: Adds duties and responsibilities of the local E0C advisors.
1.2.5.2 Revision: Area of responsibility for the Security i
Organization is reduced from onsite to the protected area.
Clarification:
Responsibility for evacuation assistance extends to all non-essential personnel (notjustTUGC0 personnel).
1.2.9 Revision
Deletes references to Squaw Creek Park, Inc. as that entity no longer exists.
Squaw Creek Park is owned by TV Electric and, 'now,' operated by l
TV Electric personnel.
1.3.1.3 Addition: Adds another "local" ambulance service to list i
of resources.
1.3.1.4 Addition: Adds another "local" hospital to list of resources.
1.3.3 Revision
Deletes specific cuantities of equipment designated for Feceral use.
1.3.4.3 Revision:
Discussion of INP0 capabilities and resources are now described in their letter-of-agreement.
Table 1.1 Revision:
Increases augmentation staffing to satisfy CPSES needs.
Figuret 1.2 Update:
Updates figures to reflect current HE0 group
& 1.3 organization.
Figure 1.4 Addition:
Adds LCS structure.
1
- to TXX-88625
.Page 3 of 6 August 22, 1988 CPSES EMERGENCY PLAN REVISION 10' DETAILEO DESCRIPTION EP Section Description Table 2.1 Addition: Adds follow-up written reports within Sheets 1-6 specified periods of time.
Table 2.2 Addition: Adds loss of all onsite meteorological Sheet 15 capabilities.
3.0 Addition
Adds telecopier to list of communication equipment resources.
3.5 Revision
Deletes radiological information from basic follow-up message format / content.
3.6 Addition
Adds this section to provide radiological data to the Texas Dept. of Health, Bureau of Radiation Control.
3.7 Revision
Deletes design characteristics of the CPSES Alert and Notification system.
4.1.4 Update
Discussion consolidates previous text and incorporates text from Section 4.1.6 (Rev. 9)
4.2 Update
Revises discussion to reflect current locations 4.3 of the ENS and HPN Telephones.
4.4 Update
Expands discussion to include the current locations of telecopiers used for emergency communications.
4.5 Addition
Adds the discussion about the autodial calling system.
4.6 Addition
Adds the discussion about the microwave communications system.
Figures 4.1 Addition: Adds current communication paths to these through 4.6 illustrations.
5.2 Revision
Deletes specific quantities of rumor control telephones.
6.1 Addition
Adds Security to the TSC staff.
6.2 Addition
Adds description of the new OSC location.
Addresses the old location as an alternate facility.
Revision: Relocates OSC equipment storage from the maintenance annex building to the OSC location.
to TXX-88625 Page 4 of 6 August 22, 1988 CPSES EMERGEf1CY PLAfi REVIS10ft 10 DETAILED DESCRIPTI0ll EP Section Description
6.3 Addition
EOF is staffed at the Alert classification (still activated at the Site Area or greater classification).
Previously, the EOF was staffed and activated at the site area (or greater) classification.
Revision:
TLD processing and radio isotopic analysis equipment no longer maintained in the E0F.
6.5 Addition
Adds description of the Logistical Support Center.
6.7 Addition
Adds discussion regarding the lab facilities being used for training and therefore are not maintained in a constant state of readiness.
6.8 Revision
Deletes the reference to Oak Ridge flational Laboratory as a backup facility. Other arrangements, demonstrated by current letters of agreement, have been made.
6.9 Revision
Reduces the commitment to retain water (used for decontamination purposes) to a statement of the ability to retain water used for decontamination.
6.11 Revision: Deletes reference to the procedure relating to equipment and supplies lists and deletes identification of emergency vehicle location.
6.13 Revision:
Deletes the detailed discussion of the Radiation Monitoring System with respect to dose assessment capabilities due to the system's inability to support timely decisions based on radiological conditions.
The EDAM software on microcomputer satisfies this need.
6.13.5 Revision:
Deletes the System Dispatcher as a source of meteorological information.
6.13.6.1 Update:
Changes the location of some of the accelerometers.
6.13.9 Revision:
Defers discussion of the fire detection instrumentation to the fire Protection Report and the FSAR.
i to TXX-88625.
Page 5 of 6 August 22, 1988 CPSES EMERGENCY PLAN REVISION 10 DETAILED DESCRIPTION EP Section Description Table 6.1 Revision: Changes the meteorological parameters to be consistent with the FSAR.
Table 6.3 Addition:
Table of Environmental Sampling Locations replaces figure 6.4, "Environmental Monitoring Locations".
Figures 6.4 Update:
Changes reflect the current meteorological and 6.5 monitoring capabilities.
Figure 6.6 Update:
Revised drawing shows complete E0F and surrounding rooms.
7.1 &
Revision: Reduces the detailed discussion of the RM-21 7.2 as it is no longer the principal means of evaluating radiological conditions.
8.1.2 &
Update:
Changes the discussion regarding Squaw Creek 8.2 Park, Inc. to address the responsibilities of squaw Creek Park management personnel with respect to notifying SCP patrons in the event of an emergency at CPSES.
~
8.3 Revision
Deletes the commitment to radiologically monitor all evacuees prior to their leaving the station.
How being addressed-in the appropriate procedure (s).
l
8.5.3 Update
Increases the supply of radioprotective drugs
]
from 400 persons to 450 persons.
8.6.2 Addition
Adds reference to local county plans with respect to the responsibility of local government for executing the evacuation plan.
i
9.1 Revision
Changes maximum guideline value from 100 Rem (wholebody dose) to 75 Rem and changes reference to EPA guidelines from NCRP-39 report.
Figure 9.1 Update:
Revises the figure to illustrate the current access control layout.
)
l Figure ~.2 Update:
Revises the figure to illustrate the current
{
capabilities located at the NOSF.
10.1 Addition:
Lists additional medical resources and updates i
facility names.
to TXX-88625 Page 6 of 6 August 22, 1988 CPSES EMERGENCY PLAN REVIS10fi 10 DETAILED DESCRIPTI0fl EP Section Description 11.2 Revision: Deletes reference to the computerized technique for total dose evaluation in favor of using actual measured values.
12.0 Revision:
Plant Evaluation personnel are now responsible for developing and planning drill and exercise programs and scenarios.
12.2.2 Update:
Fire drill frequency specified by procedure not Technical Specifications.
12.2.3 Revision: Changes the discussion to Radiation Protection and First Aid and Rescue Teams from Emergency Repair and Damage Control Teams regarding requirements toward first aid instruction.
12.3 Revision:
Emergency Planning section is responsible for developing drill and exercise objectives.
13.0 Addition: Student input to training is to be solicited and fed back to training development.
13.2 Addition:
Emergency Plan training includes practical drills to evaluate individual abilities to perform assigned emergency response functions.
14.0 Addition:
The report on the independent review to be sent to all parties involved in the review.
App. E Update:
Reflects new structures within the CPSES Figure E.2 property lines.
App. R Revision:
Deletes the Westinghouse Emergency Response Plan which is now maintained as an independent reference document.
App. S
' Update:
Incorporates the revised Corporate Emergency Management Plan which reflects current NEO group relationships and functions.
NOTICE TO COPY HOLDERS OF PRE EXISTING EMERGENCY PLANS Revision 10 is a reprint of the Emergency Plan in its entirity.
Please note that Figures 4, 6-and N.3 in Appendix-N have been reprinted as monochromatic figures that are identical to the original two color (black and white figures with a green overlay) figures. Copy holders may-wish to retain these existing two color Figures in lieu of the reprinted monochromatic Figures to allow for-greater ease in interpreting the Figures.
.