L MG 11 pg Docket'Nos. 50-321, 50-366 50-424, 50-425 t-License Nos. DPR-57, NPF-5 NPF-68 -CPPR-109 Georgia Power Company ATTN: Mr. W..G. Hairston, III Senior.Vice President -
Nuclear Opera + ions P. O. Box 4545 Atlanta, GA 30302 Gentlemen:
SUBJECT:
MEETING SUPEAkY - NUCLEAR OPERATIONS - TRANSITION ORGANIZATION This refers to the information meeting conducted in the NRC Region II Office on
' July 25, 1988.
This meeting was held at your request to discuss your current transitional nuclear operations organization for the corporate office, Vogtle facility and Hatch facility.
A list of attendees, a brief sumary and a copy of your handout are enclosed.
It is our opinion that this meeting was beneficial and h:s kept us apprised of your nuclear operations organization.
In accordance with Section 2.790 of NRC's "Rules of Practice,"- Part 2 Title 10, Code-of Federal Regulations, a copy of this letter and its enclosures
-will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, we will be pleased to discuss them.
Sincerely, OrJGlHAL S!CHED Fm L liRSO.'? Cy,CE J. Nelson Grace Regional Administrator
Enclosures:
1.
Meeting Summary 2.
List of Attendees 3.
Georgia Power Company Presentation cc w/encls:
(See page 2) 8808250166 800811 PDR ADOCK 05000321 P
PNU; g (
2f 1
L
K~.
c.-
8 Georgia Power Company 2
AUG 111988 cc w/encls:
R. P. Mcdonald, Executive Vice President, Nuclear Operations P. D. Rice..Vice President, Project
~ Director-C. W. Hayes, Vogtle Quality Assurance Manager-G. Bockhold, Jr., General Manager, Nuclear Operations
-L. Gucwa, Manager, Nuclear Safety and Licensing J. A. Bailey, Project Licensing Manager B. W. Churchill, Esq., Shaw, Pittman, Potts and.Trowbridge D. Kirkland, III Counsel, Office of the Consumer's Utility Council D. Feig, Georgians Against Nuclear Energy bec w/encls:
E. Reis. OGC J. Hopkins, NRR M. Sinkule, RII DRS, Technical Assistant NRC Resident Inspector Document Control Desk State of Georgia RII RII RII RII RII RII
- bPatterson MS le Bro niee G enk s Le MErnst 7/.r,/88 3/,f/88 6/88 f/ F/ 8 f///88 7/ /88 1
..w.
l ENCLOSURE 1 MEETING
SUMMARY
' On July 25,~1988, representatives of Georgia Power Company'(GPC) met with the NRC in the Region II office !in Atlanta -Georgia to discuss the~ Corporate office, Vogtle-facility, and Hatch facility nuclear operations organization.
A list of meeting attendees is in Enclosure 2.
GPC gave a presentation whichTprovided an organization status.
- An outline of GPC's presentation is given in Enclosure 3.
After approval by.the-' Securities and Exchange Commission, a nuclear operating
- company consisting of. the nuclear plants in the Southern Company (Hatch,
- Farley, Vogtle) will be formed. The corporate office location will be decided once approval for the' company is obtained.
A project' organization has been established for each plant.
m
r o,
ENCLOSURE 2 LIST OF ATTENDEES U. S. Nuclear Regulatory Comission - Region II L. A. Reyes, Director, Division of Reactor Projects (DRP)
V. L. Brownlee, Chief Branch 3, DRP H. C. Dance, Chief. Section 18, DRP M. V. Sinkule, Chief, Section 3B, DRP D. M. Verrelli, Chief, Branch 1, DRP C. Patterson, Project Engineer, DRP NRC - Office of Nuclear Reactor Regulation D. B. Matthews, Project Directorate 11-3 Georgia Power Company W. G. Hairston, III, Senior Vice President, Nuclear Operations C. K. McCoy, Vice President, Nuclear Operations J. T. Beckham, Vice President, Nuclear Operations T. J. McHenry, Manager, General Support l