Forwards Exam Rept 50-395/OL-88-01 Administered on 880307- 10
ML20151V981
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 04/27/1988
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nauman D
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML20151V985 List:
References
NUDOCS 8805030262
Download: ML20151V981 (2)


Text

r April 27, 1988 South Carolina Electric and Gas Company ATTH: Mr. D. A. Nauman Vice President, Nuclear.0perations P. O. Box 88 Jenkinsville, SC 29065 Gentlemen:

SUBJECT:

V. C. SUMMER NUCLEAR STATION EXAMINATION REPORT 395/0L-88-01 The NRC administered examinations on March 7-10, 1988, to employees of your 4

compar/ who had applied for licenses to operate the V. C. Sumer Nuclear Station.

At the conclusion of the written examination, a copy of the exam was left with your staff; at the conclusion of the site visit, preliminary findings on the operating tests were discussed with those members of your staff identified in i

the Examination Report, Enclosure 1.

Copies of the written examination questions and answer key are included in this report as Enclosure 2.

Facility coments regarding the written examination are included in this report as Enclosure 3. sumarizes simulator performance deficiencies observed during conduct of the simulator portion of the operating examinations.

In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosures will be placed in NRC's Public Document Room.

l Should you have any questions concerning this letter, please contact us.

Sincerely, (ORIGINAL SIGNED BY C. A. JULIAN)

Caudie A. Julian, Chief Operations Branch i

Divisien of Reactor Safety Enclosures-1.

Exam Report 50-395/0L-88-01 2.

R0/SR0 Exam Questions & Answer Key 3.

Facility Cements 4.

Simulation Facility Fidelity Report cc w/ enc'Is 1 & 3:

M. B. Williams, Corporate Training Dir.

O. S. Bradham, Plant Manager cc w/encls 1, 2, 3 & 4:

K. Woodward, Site Training Director bec:

(See Page 2) i g 50$ h oho 5

9 1my

7-South Carolina Electric and Gas Co. April 27, 1988 bec w/ encl 1:

J. Hopkins, Project Manager, NRR H. Dance, Section Chief, DRP M. Morgan, OL Examiner, DRS State of South Carolina bec w/encls 1, 2 3 & 4:

Senior Resident Inspector Opp ator Licensing Branch, OLPQ:NRR Wocument Control Desk INEL, Contractor l