x Arizona Nuclear Power Project W6 J4y q i$ k: g P O. box 52034 e PHOENIX. ARIZONA 85072-2034 ANPP-34488-EEVBhh/TPS992.12
~ ' '
January 8,1986 U. S. Nucicar Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention:
Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects
Subject:
Interim Report - DER 85-42 A 50.55(e) Potentially Reportable Deficiency Relating To Diesel Generator Fuel Rack Linkage File:
86-006-216; D.4.33.2
Reference:
Telephone Conversation between R. C. Sorenson and T. P. Siegfried on December 9, 1985.
Dear Sir:
The NRC was notified of a potentially reportable deficiency in the ref-erenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.
(January 8, 1986)
Due to the extensive investigation and evaluation required, an Interim Report is attached.
It is now expected that this information will be finalized by February 14, 1986, at which time a complete report will be submitted.
Very truly urs CV.A_.
OM(
E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/TPS/1df Attachment (s) cc:
See Page Two 0602110444 G60100
' I PDR ADOCK 05000537 S
r.
i
/
ANPP-34488-EEVBJr/TPS-92.12 January 8, 1985 Mr. D. F. Kirsch DER 85-42 Page Two cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 J. G. Haynes (4060)
D. B. Karner (4060)
W. E. Ide (4074)
D. B. Fasnacht (6330)
A. C. Rogers (4056)
L. A. Souza (6195)
T. D. Shriver (6085)
D. E. Fowler (6260)
C. N. Russo (6330)
J. R. Bynum (6125)
J. M. Allen (6130)
.D. Canady (6345)
A. C. Gehr (4141)
G. A. Hierzer (6330)
W. G. Bingham (6330)
R. W. Welcher (Bechtel/Norwalk)
H. D. Foster (6330)
D. R. Hawkinson (6330)
R. P. Zimmerman (6241)
M. L. Clyde (6079)
B. T. Parker (6345)
J. Provasoli (4057)
D. N. Stover (4082)
J. D. Houchen (6291)
J. E. Kirby (6501)
Records Center Institute of Nucicar Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 3
?s 1 INTERIM REPORT - DER 85-42 POTENTIAL REPORTABLE DEFICIENCY ARIZONA NUCLEAR POWER PROJECT PVNCS UNIT 2, 3 I.
Potential Problem
.The Unit 2. Train B. Tag No. 2M-DG-H01 Diesel Generator started, overspeeded and tripped due to sluggish operation of the fuel rack. Further investigation revealed that the fuel rack linkage lever had slipped and rotated on the governor shaft, moving the rack out of proper adjustment.
II.
Approach To and Status Of Proposed Resolution Bechtel Engineering has contacted the vendor (Cooper Energy
[
Services), letter B/CES-E-52621, dated December. 31, 1985, requesting concurrence with the reportability evaluation and their proposed corrective action. -A response by January 17, 1986 has been requested. A higher strength bolt has been installed to secure the lever to the govenor control arm in Units #1 and #2.
l III.
Projected Completion of Corrective Action and Subnittal of the Final Report The complete evaluation and Final Report are forecast to be completed by February 14, 1986.
l' i
i k
.