ML20151V897

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-259/88-09,50-260/88-09 & 50-296/88-09 on 880404-08.No Violations or Deviations Noted
ML20151V897
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 04/27/1988
From: Barr K
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20151V901 List:
References
NUDOCS 8805030233
Download: ML20151V897 (2)


See also: IR 05000259/1988009

Text

7 . ,

m, _

_ _ - _ - _ _ _ _ _ _ _._

'

. $V

Ja . . . .

'

l

' '

'

' APR 2 71988 .

.

5

'

. Docket Nos.- 50-259, 50-260, 50-296 f

License Nos. OPR-33, DPR-52, DPR-68 i

i

. .

l

Tennessee Valley Authority i

ATTN: Mr. S. A.- White '

Manager of Nuclear Power.

6N-38A Lookout Place  :

1101 Market ~ Street  :

Chattanooga, TN 37402-2801  !

j Gentlemen:

P

SUBJECT: NRC INSPECTION REPORT NOS. 50-259/88-09, 50-260/88-09,

AND 50-296/88-09

.

This refers to the Nuclear. Regulatory Commission (NRC) inspection conducted by

J. L. Kreh :on April 4-8, 1988. The inspection included a review of activities

.

!

authorized for your Browns Ferry facility. At the conclusion of the

inspection, .the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

..

these areas, tha ' inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.  !

!

'

Within the scope of the inspection, no violations or deviations were

[ --identified,

i In accordance with ' Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy.cf this letter and its enclosure .

will be placed in the NRC Public Document Room.

'

Should you have any questions concerning this letter, please contact us.

Sincerely,

.

(

Kenneth P. Barr, Acting Assistant t

'

Director for Inspection Programs  !

TVA Projects Divisien  !

..

Office of Special Projects l

l' l

'

Enclosure:

Inspection Report l

cc w/ encl: (See page 2)  ;

!

b

i

8805030233 880427

PDR

O

ADOCK 05000259

DCD

Ilaf i

i

zEol  !

y y - - - -

'

'.ca '{ .

v ~

-Tennessee.. Valley ~ Authority 2

cc w/ enc 1:

H. P. Pomrehn, Site Director ,

Browns Ferry Nuclear Plant'

'R. L. Gridley, Director

Nuclear Safety and Licensing

J. A. Kirkebo, Director,

Nuclear Engineering

.- M. J. May, Site Licensing Manager

J. G.-Walker, P' ant Manager

TVA Representative, Rockville Office

bec w/ encl:

.J. N.~ Grace, RII

S. D. Ebneter, OSP

S.20. Richardson, 0SP

G. G. Zech, OSP

B. Di Liaw, OSP

W. S. Little, OSP/RII.

G. E. Gears, OSP

0. Moran, OSP

A. J. Ignatonis, OSP/RII

A. H. Johnson, OSP/RII

J. Rutberg, 0GC

NRC Resident Inspector

ORS Technical Assistant

NRC Document Control Desk

State of Alabama

Ws D, Tiuver5, flRRlEPB' ,

J. C . Heaed,Jr., FEMA RBC

RI RII RII

eh T0ecker DCol ns PStohr Algnatonis

4/ 32/88 4/3 v/88 4p/88 4/g5f88 4/p/88

.