ML20151V825
| ML20151V825 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 04/27/1988 |
| From: | Cline W NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Woody C Florida Power & Light Co |
| References | |
| NUDOCS 8805030198 | |
| Download: ML20151V825 (3) | |
Text
SAFEGUARDS INFORMATION APR 2 71988 Florida Power and Light Company ATTN:
Mr. C. O. Woody Group Vice President Nuclear Energy Department P.O. Box 14000 Juno Beach, Florida 33408 Gentlemen:
SUBJECT:
DOCKET NOS. 50-335 AND 50-389 This acknowledges the receipt of your letter of March 7, 1988, which trans-mitted Revision 13 to the St. Lucie Physical Security Plan.
Our review of the changes has found portions of the changes to be consistent with the provisions of 10 CFR 50.54(p).
Accordingly they are acceptable for inclusion into the plan. Other portions are not consistent with the provisions of 10 CFR 50.54(p) as delineated in the enclosure to this letter. To preclude a violation of /egulatory requirements, you must not continue to implement those changes deemed inconsistent.
During a conference call on March 10, 1988, between your Corporate Licensing Office, NRC's Office of Nuclear Reactor Regulation and Region II staff you were informed to revert to your prior commitments concerning the Intake Canal Intrusion Detection System or, if desired, to modify your plan to accommodate the enclosed comments. Corrected plan pages should be submitted, as necessary, to maintain plan continuity. Additionally, the barrier integrity inspection date referenced in the enclosure is deemed a decrease and you must submit a request to the Commission's Office of Nuclear Reactor Regulation, under the provisions of 10 CFR 50.90 for amendment to your license should you want to pursue that change.
The enclosure to your letter is being withheld from public disclosurc because it contains Safeguards Information and must be protected in accordance with the i
provisions of 10 CFR Part 73.21.
The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.
Therefore, the enclosures will not be placed in the Public Document Room, i
\\
ENCLOSURS C0dTAINS SAFEGUAhDS INFO!UJATIO UPOM SEPARATION THIS I
PACE IS DECONTROLLED.
SAFEGUARDS INFORMATION RG#'
$$$5oggggg g g5 i
o F
SAFEGUARDS INFORMATION Florida Power and Light Company 2
Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely, William E.
Cline, Chief Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards
Enclosure:
Inconsistent Changes (Safeguards Information) cc w/ encl:
K. N. Harris, Vice President St. Lucie Nuclear Plant P. O. Box 128 Ft. Pierce, Florida 33454 D. A. Sager, Plant Manager St. Lucie Nuclear Plant P. O. Box 128 Ft. Pierce, Florida 33454 cc w/o encl:
Harold F. Reis, Esq.
Newman & Holtzinger, P.C.
1615 L Street, N.E Washington, DC 20036 Norman A. Coll, Esq.
Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 U. S. Er.vironmental Protection Agency Region IV Regional Radiation Representative 345 Courtland Street, N.E.
Atlanta, Georgia 30308 Attorney General Department of Legal Af fairs The Capitol Building g 8 0 4 0s 03 p c olli Tallahassee, Florida 32301
[AVEcons
- syy, (cc w/o enc 1 cont'd - see page 3) pf 30 or.f f
7 AFEGU ARDS INFORMATION
APR 27 9BB 3AFEGUARDS INFORMATl0N Florida,Fowcr and Light Company 3
(cc w/o enci cont'd)
Allan Schubert Public Health Physicist Manager Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, Florida 32301 l
Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida i
Twin Towers 2600 Blair Stone Road Tallahassee, Florida 32301 State Planning and Development Clearinghouse Office of Planning and Budgeting Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Weldon B. Lewis County Administrator St. Lucie County 2300 Virginia Avenue, Room 104 Fort Pierce, Florida 33450 Charles B. Brinkman Washington - Nuclear Operations Combustion Engineering, Inc.
7910 Woodmont Avenue Bethesda, Maryland 20814 Intergovernmental Coordination and Review Office of Planning and Budgeting Executive Office of the Governor The Cepitol Building Tallahassee, Florida 32301 bec w/ enc 1:
Director, Division of Reactor Inspection and Safeguards, NRR EWS-305A Region II Licensing File, (50-335) (50-389) (22VA), TAB 2 bcc w/o encl:
)
Document Control Desk (RG01), 42-P NRC Resident Inspector e
sAFEGUA$p0RMATIONfdn Del%
te of Florid e
NC# gg%
N, DTho n
CPer ire RCrienjak 4 4e88 o4
- 88
~~
o4 m 88 o4=88