ML20151V801
| ML20151V801 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 01/16/1986 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-34665-EEVB, DER-85-41, NUDOCS 8602110411 | |
| Download: ML20151V801 (2) | |
Text
ty i
tlECEWED fiRC Arizona Nuclear Power Proje63 JAft 22 SI 10: 31 P.O. BOX 52034 e PHOENIX, ARIZONA 85072-2034 ANPP-34665-EEVB/TDS/DRL-92.12 4EGION VI?F U. S. Nuclear Regulatory Connaission Region V 1450 Maria Inne - Suite 210 Walnut Creek, CA 94596-5368 Attention:
Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects Palo Verde Nuclear Generating Station (PVNGS)
Units 2, 3 Docket Nos. 50/529, 530
Subject:
Time Extension For Report - DER 85-41 A 50 55(e) Potentially Reportable Deficiency Relating to Burned Wire Insulation File: 86-006-216; D.h.33.2
~
Reference:
A) Telephone Conversation between R. C. Sorenson and T. P. Siegfried on December 19, 1985 B) ANPP-34498, dated January 9, 1986 (Interim Report)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in reference (A), and an interim 7, ort was transmitted by reference (B). At that time, it was estimated that~ a final report would be available by January 22, 1986.
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by February 19, 1986, at which time a complete report will be submitted.
I There is no new information or change to the interim report at this time.
j Very truly yours, CLLL_
qt
_q E. E. Van Brunt, Jr.
l Executive Vice President Project Director l
l EEVB/DRL/pgk B602110411 860116 I D ADOCK0500Dj9 DR
(
ANPP-34665-EEVB/TDS/DRIr-92.12 January 16, 1986 Mr. D. F. Kirsch DER 85-41 Page Two
~
cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 2
Washington, D. C.
20555 J. G. Haynes (4060)
W. E. Ide (4074)
D. B. Phsnacht (6350)
A. C. Rogers (4056) i L. A. Souza (6195)
T. D. Shriver (6085)
D. E. Pbwler (6260)
C. N. Russo (6330)
J. R. Bynum (6125)
J. M. Allen (6130)
D. Canady (6345)
... C. Gehr (41h1)-
G. A. Hierzer (6330)
W. G. Bingham (6330)
R. W. Welcher (Bechtel/Norwalk)
H. D. Foster (6330)
D. R. Hawkinson (633) 4 R. P. Zimmernan (6241)
M. L. Clyde (6079)
B. T. Parker' (6345)
J. Provasoli (4057)
D. N. Stover (4082)
J. D. Houchen (6330)
J. E. Kirby (6501)
Records Center Institute of Nuclear Power Operationn 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339