Deficiency Rept DER 85-39 Re NSSS Pipe Stop Bolting Matl. Initially Reported on 851108.Final Rept Delayed Until 860214 Due to Required Extensive Investigation & Evaluation
ML20151V733
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/16/1986
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-34664-EEVB, DER-85-39, NUDOCS 8602110391
Download: ML20151V733 (2)


Text

r L

Arizona Nuclear Power Project P.O. BOX 52034 o PHOENIX, ARI2oNA 85072-2034 ANPP-34664-EEVB/TDS/DRL-92.12 January 16', 1986 g

c2 N

m U. S. Nuclear Regulatory Commission j-Region V 2

m Si!D 1450 Maria Lane - Suite 210 2

" T's Walnut Creek, CA 94596-5368 7

53 Attention:

Mr. D. F. Kirsch, Acting Director p

Division of Reactor Safety and Projects Palo Verde Nuclear Generating Station (PVNGS)

-Units 2, 3-Docket Nos. 50/529, 530

Subject:

Time Extension For Report - DER 85-39 A 50.55(e) Potentially Reportable Deficiency Relating to NSSS Pipe Stop Bolting Material File:.86-006-216; D.4.33.2

Reference:

(A) Telephone conversation between A. Hon and T. R. Bradish on November 8, 1985 (B) ANPP-34232, Dated December 12, 1985 (Interim Report)

(C) ANPP-34396, Dated January 3, 1986 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A),

an Interim Report was transmitted by Reference (B), and a Time Extension by

. Reference (C). At that time, it was estimated that a Final Report would be available by January 24, 1986.

Due to the extensive investigation and evaluation required, it is now expected that this information-will be finalized by February 14, 1986, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly ou CUL1.

4 10 E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/DRL/1df

/ll##

8602110391 060116

'PDR ADOCK 05000529 S

PDR

e 7

a+

ANPP-34664-EEVB/TDS/DRL-92.12 January 16, 1986 Mr. D. F. Kirsch DER 85-39 Page Two cc:

Richard DeYoung, Director Office of Inspection and Enforcement U..S. Nuclear Regulatory Commission Washington, D. C.

20555 J. G. Haynes (4060)

W. E. Ide (4074)

D. B. Fasnacht (6330)

A. C. Rogers (4056)

L. A. Souza (6195)

T. 1). Shriver (6085)

D. E. Fowler (6260)

C. N. Russo (6330)

J. R. Bynum

-(6125)

J. M. Allen (6130)

D. Canady (6345)

A. C. Gehr (4141)

G. A. Hierzer (6330)

W. G. Bingham (6330)

R. W. Welcher (Bechtel/Norwalk)

H. D. Foster (6330)

D. R. Hawkinson (6330)

R. P. Zimmerman (6241)

M. L. Clyde (6079)

B. T. Parker (6345)

J. Provasoli (4057)

D. N. Stover (4082)

J. D. Houchen (6330)

J. E. Kirby (6501)

Records Center Institute of Nuclear Power Operations 1100 circic 75 Parkway, Suite 1500 Atlanta, Georgia 30339