Forwards Insp Repts 50-327/88-16 & 50-328/88-16 on 880229-0304.No Violations or Deviations Noted
ML20151V484
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/21/1988
From: Barr K
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20151V487 List:
References
NUDOCS 8805030074
Download: ML20151V484 (2)


See also: IR 05000327/1988016

Text

s

l*

'

APR2! W3

Docket Nos. 50-327, 50-328

License Nos. OPR-77, DPR-79

Tennessee Valley Authority

ATTN:

Mr. S. A. White

Manager of Nuclear Power

{

6N 38A Lookout Place

is

1101 Market Street

Chattanooga, TN 37402-2801

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-327/88-16 /.ND 50-328/88-16

This refers to the Nuclear Regulatory Commission (hRC) inspection conducted by

S. Elrod on February 29 - March 4,

1988.

The inspection included a review of

activities authorized for your Sequoyah facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Subsequent to the inspection,

your site management was informed of the unresolved item discussed below on

April 19, 1988.

Areas examined during the inspection are identified in the report.

These

areas included operational staf fing, review commit.ee activities, maintenance

status, status of testing, and review of your operational readiness assessment.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and observa-

tion of activities in progress.

Within the scope of the inspection, no violations or deviations were identi-

fied.

One unresolved item was identified concerning the technique used for

end-of-cycle moderator temperature coef ficient measurement.

This matter will

be purused during future inspections.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

JGjnccIb< U b 0

CRt6.

j

Kenneth P. Barr, Acting Assistant

8805030074 880421

Director for Inspection Programs

PDR

ADOCK 05000327

TVA Projects Division

a

DCD

Office of Special Projects

Enclosure:

(See page 2)

\\

\\\\

.

ri

y

s

APR 21 1986

j

Tennessee Valley Authority

2

y

Enclosure:

l

NRC Inspection Report

g

cc w/ encl:

"

H. L. Abercrombie, Site Director

s

. Sequoyah Nuclear Plant

?

?J. A. Kirkebo, Director,-

Nuclear Engineering

_*,

R. L. Gridley, Director

fi

Nuclear Safety and Licensing

D:

M. R. Harding, Site Licensing

-Manager

-TVA-Representative, Rockville

s

i

Office

bec w/ encl:

~S. D. Ebneter, OSP

S. D. Richardson,-0SP

G. G. Zech, OSP

B. D. Liaw, OSP

P

W. S. Little, OSP/RII

F. R. McCoy, OSP/RII

R.,E. Carroll, OSP/RII

-J. B. Brady, OSP/RII

J. Rutberg, OGC

ll

NRC Resident Inspector

E

DRS Technical Assistant

NRC Document' Control Desk-

State of Tennessee

<

J

l

l-

l

RI

RII

RI

( rod:ser

FMc oy

WLittle

04/ /88

04/va/88

04/S.\\/88

l

,

L