Forwards Insp Repts 50-313/88-04 & 50-368/88-04 on 880229- 0310 & Notice of Violation
ML20151V432
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 04/22/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20151V435 List:
References
NUDOCS 8805030059
Download: ML20151V432 (2)


See also: IR 05000313/1988004

Text

.

-

2 ,.

'

APR 2 21988

In Reply Refer To:

Dockets: 50-313/88-04

50-368/88-04

Arkansas Power & Light Company

ATTN: Mr. Gene Campbell

Vice Preside't, Nuclear

Operations

P.O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Messrs. L. D. Gilbert, R. G. Taylor,

,

'

R. C. Haag, and I. Barnes of this office during the period February 29 through

March 10, 1988, of activities authorized by NRC Operating Licenses DPR-51 and

i NPF-6 for Arkansas duclear One, and to the discussion of our findings with

l Mr. S. M. Quennoz and other members of your staff at the conclusion of the

! inspection.

,

Areas examined during the inspection included inservice inspection, design

I changes and modifications, supplemental design control inspection, use of

I

E-Brite tubing in Unit 2 shutdown cooling heat exchangers, allegation

assessment, and 10 CFR Part 21 inspection. Within these areas, the inspection

consisted of selective examination of procedures and representative records,

interviews with personnel, and observations by the NRC inspectors. The

inspection findings are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

Three unresolved items are identif4ed in paragraphs 3, 4, and 7 of the enclosed

inspection report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

l by '.he Paperwork Reduction Act of 1980, PL 96-511,

6

l

f

"

RIV:RE RE RE .c3 C:KiQPS g D 0 C: D:

LGilbekdi Pa, r RHaag IBarnes' st' hbn Of berlain (Calan

f/J/88

/ /3/88

f h/'3/88 4 //J /88 'k\ 88 y /2/T68

'

,/22/88

Ct :k hEjbncur

l

'

MEmerson TBarnes

A /A /88 W / 'V/88

9

8805030059 880422 rev/i

l PDH ADOCK 05000313 g

a DCD ' \

. . . _ .

-.

-

.

~ l

!

Arkansas Power & Light Company -2-

l

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you, i

l

Sincerely,

Original og..m oy ,

'

A. B. Deach

L. J. Callan, Director

Division of Reactor Projects

Enclosures:

1. A;.pendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-313/88-04

50-368/88-04

cc w/ enclosures:

Arkansas Nuclear One

ATTN: J. M. Levine, Director

l Site Nuclear Operations

! P.O. Box 608

Russellville, Arkansas 72801

l

Arkansas Radiation Control Program Director

l bec to DMB (IE011

bec distrib, by R17:

  • RR! R. D. Partin, RA
  • RPSB-DRSS *Section Chief (DRP/A)

Lisa Shea, RM/ALF *RIV File

  • DRP * MIS System
  • RSTS Operator * Project Engineer, DRP/A ,

l *G. Dick, NRR Project Manager *DRS I

l

'

  • TSS D. Powers  :

L. Gilbert R. Taylor l

1. Barnes R. Haag l

M. Emerson

l

  • L. Constable
  • w/766

.