Text
.
-
2
,.
'
APR 2 21988
In Reply Refer To:
Dockets:
50-313/88-04
50-368/88-04
Arkansas Power & Light Company
ATTN: Mr. Gene Campbell
Vice Preside't, Nuclear
Operations
P.O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Messrs. L. D. Gilbert, R. G. Taylor,
R. C. Haag, and I. Barnes of this office during the period February 29 through
,
'
March 10, 1988, of activities authorized by NRC Operating Licenses DPR-51 and
i
NPF-6 for Arkansas duclear One, and to the discussion of our findings with
l
Mr. S. M. Quennoz and other members of your staff at the conclusion of the
!
inspection.
Areas examined during the inspection included inservice inspection, design
,
I
changes and modifications, supplemental design control inspection, use of
I
E-Brite tubing in Unit 2 shutdown cooling heat exchangers, allegation
assessment, and 10 CFR Part 21 inspection.
Within these areas, the inspection
consisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the NRC inspectors.
The
inspection findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
Three unresolved items are identif4ed in paragraphs 3, 4, and 7 of the enclosed
inspection report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
l
by '.he Paperwork Reduction Act of 1980, PL 96-511,
6
l
f
RIV:RE
RE
RE .c3
C:KiQPS g D 0
C:
D:
"
LGilbekdi
Pa, r
RHaag
IBarnes'
st' hbn Of
berlain (Calan
f/J/88
/3/88
h/'3/88 4 //J /88
'k\\ 88 y /2/T68
,/22/88
'
/
f
C :k
hEjbncur
t
l
MEmerson
TBarnes
'
A /A /88
W / 'V/88
9
rev/i
8805030059 880422
l
PDH
ADOCK 05000313
g
a
' \\
. . . _ .
-.
-
.
l
~
Arkansas Power & Light Company
-2-
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you,
i
l
Sincerely,
Original og..m oy
,
A. B. Deach
'
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
1.
A;.pendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-313/88-04
50-368/88-04
cc w/ enclosures:
Arkansas Nuclear One
ATTN:
J. M. Levine, Director
l
Site Nuclear Operations
!
P.O. Box 608
l
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
l
bec to DMB (IE011
bec distrib, by R17:
- RR!
R. D. Partin, RA
- RPSB-DRSS
- Section Chief (DRP/A)
Lisa Shea, RM/ALF
- RIV File
- DRP
- MIS System
- RSTS Operator
- Project Engineer, DRP/A
,
l
- G. Dick, NRR Project Manager
- DRS
l
- TSS
D. Powers
'
L. Gilbert
R. Taylor
1. Barnes
R. Haag
M. Emerson
- L. Constable
- w/766
.