Forwards Insp Rept 50-425/88-16 on 880328-31.No Violations or Deviations Noted
ML20151V396
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/19/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Head G
GEORGIA POWER CO.
Shared Package
ML20151V401 List:
References
NUDOCS 8805030050
Download: ML20151V396 (2)


See also: IR 05000425/1988016

Text

A_

- - . . -_

..

,

,

/

. , . . -

.

'

APR 191988

i

,

"

Docket No. 50-425

-License No. CPPR-109

Georgia Power Company ,

ATTN: Mr. George F. Head  ;

Senior Vice President

P. O. Box 4545  !

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC INSPECTION REPORT N0. 50-425/88-16

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted

by M. D. Hunt on March 28-31, 1980. 'the inspection included a review of

activities authorized -for your Vogtle facility. At the conclusion of the .

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.  ;

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were identi-

fied.

Your attention is invited to the unresolved item identified in the inspection

,

report. This matter will be pursued during future inspections. j

In accordance with Section 2.790 of the NRC's "Rules of Practice, Part 2,

Title 10 Code of Federal Regulations, a copy of this letter and its enclosure

. will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely.

Alan R. Herdt, Chief

Engineering Branch

Division of Reactor Safety

'

Enclosure: (See page 2)

i

~

8805030050 880419

PDR ADOCK 05000425

3\

O DCD

_ _ _ _

W

-

.. .

'

.w

.  :. :APR 1.9988

.; -

,

,

.

Georgia . Power Company 2

r

Enclosure:

NRC Inspection Report

cc w/ enc 1:

~P. D.- Rice, Vice President, Project

Director

C. W. Hayes, Yogtle Quality

Assurance Manager

G. Bockhold,' dr. , General Manager,

NJclear Operations

L. Gucwa, Manager, Nuclear Safety

and Licensing

J. A. Bailey, Project Licensing

Manager '

B.'W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

D.'Xirkland, III, Counsel,

Office of the Consumer's Utility

Council

<

D. Feig, Georgians Against .

Nuclear Energy

bec w/ enc 1: '

E. Reis, 0GC '

J. Hopkins, NRR

.

M. Sinkule, RII

M. N. Miller, RII

DRS Technical Assistant  :

NRC Reside,it Inspector

Document Control Desk

State of Georgia

i

~

,

MH n er TConlon GyMSinkule

04///788 04//5788 04/ /88 04/p8

.. _- . - -- _ - _ - - - . .-. - - - - - _ -