ML20151V377
| ML20151V377 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 08/27/1998 |
| From: | Dave Solorio NRC (Affiliation Not Assigned) |
| To: | Cruse C BALTIMORE GAS & ELECTRIC CO. |
| References | |
| TAC-MA2210, TAC-MA2211, TAC-MA2212, NUDOCS 9809140287 | |
| Download: ML20151V377 (4) | |
Text
.
,/
August 27, 1998 Mr. Charles H. Cruse, Vice President Nuclear Energy Division Baltimore Gas and Electric Company -
1650 Calvert Cliffs Parkway
. Lusby, MD 20657-47027
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS 1 & 2, INTEGRATED PLANT ASSESSMENT FOR SCOPING (TAC NOS. MA2210, MA2211 AND MA2212)
Dear Mr. Cruse:
i-By letter dated April 8,1997, Baltimore Gas and Electric (BGE) submitted its license renewal application. The NRC staff is reviewing the integrated plant assessment reports contained in the application against the requirements of 10 CFR 54.21(a)(1) and 10 CFR 54.21(a)(3). Based on a review of the information submitted, the staff has identified in the enclosure, areas where additional information is needed to complete its review.
Please provide a schedule by letter or telephonically for the submittal of your responses within 30 days of the receipt of this letter. Additionally, the staff would be willing to meet with EGE
_ prior to the submittal of the responses to provide clarifications of the staff's requests for i
additionalinformation.
Sincensly, DJ David L. Solorio, Project Manager License Renewal Project Directorate l
Division of Reactor Program Management Office of Nuclear Reactor Regulation i
Docket Nos. 50-317 and 50-318
Enclosure:
Request for Additional Information cc w/ encl: See next page DISTRIBUTION:
\\
See next page -
i
{
DOCUMENT NAME:G:\\ WORKING \\ LEE \\ SCOPE _37.LTR %
LA:PDI-g PDLR/D@
P%DRP)V PDLR/DRPM:D OFFICE 1
NAME SlittleW DSolorW Slee[
CGrimes @
{
DATE-86%/98 8/a/98
/ 8/ /9hN 8/2998 l
OFFICIAL RECORD COPY aA 9809140287 980827 PDR ADOCK 05000317 p
PDR gm HLE CENTER COPY
(,
i.
4 Mr. Charles H. Cruse Calvert Cliffs Nuclear Power Plant Baltimore Gas & Electric Company Unit Nos.1 and 2 I
cc:
i '
President Mr. Joseph H. Walter, Chief Engineer Calvert County Board of Public Service Commission of Commissioners Maryland j
175 Main Street Engineering Division l
Prince Frederick, MD 20678 6 St. Paul Centre j
Baltimore, MD 21202-6806 James P. Bennett, Esquire Counsel Kristen A. Burger, Esquire Baltimore Gas and Electric Company Maryland People's Counsel P.O. Box 1475 6 St. Paul Centre Baltimore, MD 21203 Suite 2102 Baltimore, MD 21202-1631 Jay E. Silberg, Esquire Shaw, Pittman, Potts, and Trowbridge Patricia T. Birnie, Esquire 2300 N Street, NW Co-Director Washington, DC 20037 Maryland Safe Energy Coalition P.O. Box 33111 Mr. Thomas N. Prichett, Director Baltimore, MD 21218 NRM Calvert Cliffs Nuclear Power Plant Mr. Loren F. Donatell 1650 Calvert Cliffs Parkway NRC TechnicalTraining Center Lusby, MD 20657-4702 5700 Brainerd Road Chattanooga, TN 37411 4017 Resident inspector U.S. Nuclear Regulatory Commission David Lewis P.O. Box 287 Shaw, Pittman, Potts, and Trowbridge St. Leonard, MD 20685 2300 N Street, NW Washington, DC 20037 Mr. Richard I. McLean Nuclear Programs Douglas J. Walters Power Plant Resetrch Program Nuclear Energy Institute Maryland Dept. of Natural Resources 1776 l Street, N.W.
Tawes State Office Building, B3 Suite 400 Annapolis, MD 21401 Washington, DC 20006-3708 DJW@NEl.ORG Regional Administrator, Region i U.S. Nuclear Regulatory Commission Barth W. Doroshuk 475 Allendale Road Baltimore Gas and Electric Company King of Prussia, PA 19406 Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway NEF ist Floor Lusby, Maryland 20657
,,,n_,,.eunr.
+,.#-
- e--
- - - -- ~ =
P
~
L Distribution:
HARD COPY
'Gookst Ellessi PUBLIC PDLR R/F MEl-Zeftawy DISTRIBUTION: E-MAIL:
FMiraglia (FJM)
JRoe (JWR)
DMatthews (DBM)
CGrimes (CIG)
TEssig (THE)
GLainas (GCL)
JStrosnider (JRS2)
GHolahan (GMH)
SNewberry (SFN)
GBagchi (GXB1)
RRothman (RLR)
JBrammer (HLB) -
CGratton (CXG1)
JMoore (JEM)
MZobier/RWeisman (MLZ/RMW)
SBajwa/ADromerick (SSB1/AXD)
LDoerflein (LTD)
BBores (RJB) i SDroggitis (SCD)
RArchitze! (REA)
CCraig (CMC 1)
LSpessard (RLS)
RCorreia (RPC)
RLatta (RML1)
EHackett (EMH1)
- AMurphy (AJM1)
TMartin (TOM 2)
DMartin (DAM 3)
GMeyer (Gt M)
WMcDowell(WDM)
SStewart (JSS1)
THiltz (TGH)
SDroggitis (SCD)
DSolorio (DLS2)
PDLR Staff TCheng (TMC)
PShemanski (PCS)
THiltz (TGH)
SLittle (SLL)
1 9
REQUEST FOR ADDITIONAL INFORMATION CALVERT CLIFFS NUCLEAR POWER PLANT UNIT NOS.1 & 2 LICENSE RENEWAL APPLICATION DOCKET NOS. 50 317 AND 50-318 Sconing Table 3-1 in Section 2.0 of Appendix A to the application lists the Calvert Cliffs Nuclear Power Plant (CCNPP) systems and structures. Appendix A to the application contains the aging management review of certain systems and structures which are within the scope of license renewal. Aging management of many of the systems and structures listed in Table 3-1 are not apparently discussed in the application. These latter systems and structures may not be within the scope of license renewal or may have been addressed as part of other systems and structures. To assess whether Baltimore Gas and Electric Company has identified CCNPP systems and structures within the scope of license renewal, the staff is sampling the following -
CCNPP systems and structures from Table 3-1, which are not apparently discussed in the
- application:
CCNPP Desianation 2
Electrical 125VDC Distribution 4
Electrical 4kV Transformers & Buses 5
Electrical 480V Transformers & Buses 48-Engineering Safety Feature Actuation 58 Reactor Protective Transformer Foundation Switchgear Structure Well Water Pump House For the above CCNPP systems and structures, please provide a brief description of their functions and indicate whether any of the functions are intended functions as defined in 10 CFR Part 54.4. For systems and structures with intended functions, that is, within the scope of license renewal, briefly describe where the system and structure components (such as, bus, insulated cables and connections, insulators, and transmission conductors) are evaluated for aging management in the application.
I I
Enclosure
..--