ML20151V344
| ML20151V344 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 04/19/1988 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Cruden D VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML20151V348 | List: |
| References | |
| NUDOCS 8805030031 | |
| Download: ML20151V344 (3) | |
See also: IR 05000338/1987032
Text
' , '
,
.'
'
'
APR 191988
.
Docket Nos. 50-338, 50-339
Virginia Electric and Power Company
ATTN: Mr. D. S. Cruden, Vice President
Nuclear Operations
P. O. Box 26666
Richmond, VA 23261
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT NOS. 50-338/87-32 AND 50-339/87-32)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted
by A. B. Ruff on October 5-9, 1987.
.The inspection included a review of
activities authorized for your North Anna Power Station. At the conclusion of
the inspection, the findings were discussed with those members of your staff
'
identified in the enclosed inspection report.
The report documenting this
inspection was sent to you by letter dated December 11, 1987. As a result of
this inspection, a lailure to comply with NRC regulatory requirements was
identified, and accordingly, NRC concerns relative to the inspection findings
were discussed in an Enforcement Conference held on January 21, 1988.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with persor.nel, and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
The violations, references to pertinent requirements, and
i
elements to be included in your response are described in the enclosed Notice
of Violation.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosure are not subject to the
clearance procedures of the Office of Ma'1agement and Budget as- required by the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
Should you have any questions concerning this letter, pp ce contact us.
Sincerely,
ORIGINAL. S10NIO Bh
L NELSON GHCl
.
g50ggobk
3g
J. Nelson Grace
a
Regional Administrator
i\\
Enclosure: (See page 2)
ze o/
-
- - - -
-
.
.
. . _ .
_.
__ _ - _ _ _ _ _ .
'
.
'
..-
APR 191988
-
.
Enclosure:
'
cc w/ encl:
E'. W. Harrell, Station Manager
.
N. E. Hardwick, Manager - Nuclear
Programs and Licensing
P
bec w/ encl:
NRC Resident Inspector
DRS Technical Assistant
J. Lieberman, OE:HQ
Document Control Desk
Commonwealth of Virginia
,
,
c
,
RI
{
RI
RI
FGibson-
LAReyes
GRJenkins
Eyr st
e"04//s/88
04/(6 /88
4//f/88
4/fY/88
7
H&*OG
J. % -
(p. +/i+/a S-
i
g g, LJ
-
_____________ ________
'.
'
.
.
APR 19 M
Virgiriia Electric and Power Company
2
Enclosure:
cc w/ encl:
E. W. Harrell, Station Manager
N. E. Hardwick, Manager - Nuclear
Programs and Licensing