ML20151V340

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-498/88-45 & 50-499/88-45 on 880711-29.No Violations or Deviations Noted
ML20151V340
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 08/15/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20151V343 List:
References
NUDOCS 8808220239
Download: ML20151V340 (2)


See also: IR 05000498/1988045

Text

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ __ ,

"

-

,

.' AUG I 51988

In Reply Refer To:

Dockets: 50-498/88-45

50-499/88-45

Houston Lighting & Power Company

ATTH: J. H. Goldberg, Group Vice

President, Nuclear

P.O. Box 1700

Houston, Texas 77001

Gentlemen:

This refers to the inspection conducted by Messrs. L. E. Ellershaw and W. M.

McNeill of this office during the period July 11-29, 1988, of activities

authorized by NRC Jperating License NPF-76 and Construction Permit CPPR-129 for

the South Texas Project. Units 1 and 2, and to the discussion of our findings

with Mr. J. T. Westermeier and other members.of your staff at the conclusion of

the inspection.

The area examined during the inspection inclu' d ed verification of as-builts

(structures) for Unit 2. Within this area, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the NRC inspectors. The inspection findings are

documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Signed By

A.B. Urach

L. J. Callan, Director

Division of Reactor Projects

Enclosure:

Appendix - NRC Inspection Report

50-498/88-45

50-499/88-45

/ u

RIV:RI:MQP,S27/w

LEEllersha7$

w

RI:MQPh

WP94cNeil

C:MQP

IBar

Jg D:M

JLM oan

lh Q

LJCallan

f/t /88 r/a /88 9/// /88[ $/M88 $/l$/88

)

8808220239 8808d49q, 5 I k

$DR ADOCK 0500 ' (

""

TLor

l

.. .

,

.

Houston Lighting & Power Company -2-

cc w/ enclosure:

Houston Lighting & Power Company Newman & Holtzinger, P.C.

ATTN: M. A. McBurnett, Manager ATIN: J. R. Newman, Esquire

Operations Support Licensing 1615 L Street, N.W.

P.O. Box 289 Washington, D.C. 20036

Wadsworth Texas 77483

Houston Lighting & Fower Company Houston Lighting & Power Company

ATTN: Gerald E. Vaughn, Vice President ATTN: S. L. Rosen

Nuclear Operations P.O. Box 289

P.O. Box 289 Wadsworth, Texas 77483

Wadsworth, Texas 77483

Houston Lighting & Power Company Houston Lighting & Power Company

ATTN: J. T. Westermeier, General Manager ATTN: R. W. Chewning, Chairman

South Texas Project Nuclear S3fety Review Board

P.O. Bcx 289 P.O. Box 289

Wadsworth, Texas 77483 Wadsworth, Texas 77483

Central Power & Light Company City Public Service Board

ATTN: R. L. Range /R. P. Verret ATTN: R. J. Costello/M. T. Hardt

P.O. Box 2121 P.O. Box 1771

Corpus Christi, Texas 78403 San Antonio, Texas 78296

City of Austin Electric 'Jtility Houston Lighting & Power Cortpany

ATTN: R. J. Miner, Chief Operating ATTN: Licensing Representative

Officer Suite 610

721 Barton Springs Road Three Metro Center

Austin, Texas 78704 Bethesda, Maryland 20814

Texas Radiation Control Program Director

bec to DMB (IE01)

bcc distrib, by RIV:

  • DRP *RRI-OPS

R. D. Martin, RA *DRS

  • SectionChief(DRP/D) *RPB.DRSS
  • MIS System *RIV File

Lisa Shea, RM/ALF *RSTS Operator

R. Bachmann, 0GC *D. Hunnicutt

  • G. Dick, NRR Project Manager *L. E. Ellershaw
  • I. Bornes *W. M. McNeill
  • w/766

.