ML20151V340
| ML20151V340 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 08/15/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20151V343 | List: |
| References | |
| NUDOCS 8808220239 | |
| Download: ML20151V340 (2) | |
See also: IR 05000498/1988045
Text
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ __ ,
"
.'
AUG I 51988
-
,
In Reply Refer To:
Dockets:
50-498/88-45
50-499/88-45
Houston Lighting & Power Company
ATTH:
J. H. Goldberg, Group Vice
President, Nuclear
P.O. Box 1700
Houston, Texas 77001
Gentlemen:
This refers to the inspection conducted by Messrs. L. E. Ellershaw and W. M.
McNeill of this office during the period July 11-29, 1988, of activities
authorized by NRC Jperating License NPF-76 and Construction Permit CPPR-129 for
the South Texas Project. Units 1 and 2, and to the discussion of our findings
with Mr. J. T. Westermeier and other members.of your staff at the conclusion of
the inspection.
The area examined during the inspection inclu' ed verification of as-builts
d
(structures) for Unit 2.
Within this area, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the NRC inspectors.
The inspection findings are
documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Signed By
A.B. Urach
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
50-498/88-45
50-499/88-45
/
u
RIV:RI:MQP,S27/w
RI:MQPh
C:MQP
Jg
D:M
lh
Q
LEEllersha7$
WP94cNeil
IBar
JLM
oan
LJCallan
9/// /88[
$/M88
$/l$/88
w
f/t /88
r/a /88
)
8808220239 8808d49q,
5
I k
$DR
ADOCK 0500
(
""
'
TLor
l
..
.
,
.
Houston Lighting & Power Company
-2-
cc w/ enclosure:
Houston Lighting & Power Company
Newman & Holtzinger, P.C.
ATTN:
M. A. McBurnett, Manager
ATIN:
J. R. Newman, Esquire
Operations Support Licensing
1615 L Street, N.W.
P.O. Box 289
Washington, D.C.
20036
Wadsworth Texas 77483
Houston Lighting & Fower Company
Houston Lighting & Power Company
ATTN:
Gerald E. Vaughn, Vice President
ATTN:
S. L. Rosen
Nuclear Operations
P.O. Box 289
P.O. Box 289
Wadsworth, Texas 77483
Wadsworth, Texas 77483
Houston Lighting & Power Company
Houston Lighting & Power Company
ATTN:
J. T. Westermeier, General Manager
ATTN:
R. W. Chewning, Chairman
South Texas Project
Nuclear S3fety Review Board
P.O. Bcx 289
P.O. Box 289
Wadsworth, Texas 77483
Wadsworth, Texas 77483
Central Power & Light Company
City Public Service Board
ATTN:
R. L. Range /R. P. Verret
ATTN:
R. J. Costello/M. T. Hardt
P.O. Box 2121
P.O. Box 1771
Corpus Christi, Texas 78403
San Antonio, Texas 78296
City of Austin Electric 'Jtility
Houston Lighting & Power Cortpany
ATTN:
R. J. Miner, Chief Operating
ATTN:
Licensing Representative
Officer
Suite 610
721 Barton Springs Road
Three Metro Center
Bethesda, Maryland 20814
Texas Radiation Control Program Director
bec to DMB (IE01)
bcc distrib, by RIV:
- DRP
- RRI-OPS
R. D. Martin, RA
- DRS
- SectionChief(DRP/D)
- RPB.DRSS
- MIS System
- RIV File
Lisa Shea, RM/ALF
- RSTS Operator
R. Bachmann, 0GC
- D. Hunnicutt
- G. Dick, NRR Project Manager
- L. E. Ellershaw
- I. Bornes
- W. M. McNeill
- w/766
.
i