Safety Evaluation Supporting Amend 9 to License NPF-68
ML20151V274
Person / Time
Site: Vogtle 
Issue date: 08/17/1988
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20151V271 List:
References
NUDOCS 8808220202
Download: ML20151V274 (4)


Text

_.--

o UNITED sT%in

[

NUCLEAR REGULATM WIKION 5

WASHINGTON, - '.

2

(+....

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 9 TO FACILITY OPERATING LICENSE NPF 68 GEORGIA POWER COMPANY. ET AL DOCKET NO. 50-424 V0GTLE ELECTRIC GENERATING PLANT UNIT 1 3

1.0 INTRODUCTION

By letter dated May 19, 1988, supplemented July 5,1988, Georgia Power Company, et al., (the licensee) requested a change to the Technical Specifications for Vogtle Electric Generating Plant, (VEGP), Unit 1.

The proposed change would 4

change the Technical Specifications to allow removal of portions of the temporary wall dividing the control room.

2.C EVALUATION Unit 1 is protected from Unit 2 construction and testing activities by existence of physical barriers and administrative controls. In particular, the Vogtle Unit 1 and Unit 2 control room areas are separated by a temporary wall and the heating, ventilation, and air conditioning (HVAC) systems are sepat;ted by a series of dampers, removed duct sections, and caps on open ducts. After the Protected / Vital Area is extended to include the Unit 2 portion of the control room, the licensee proposes to remove portions of the temporary wall prior to the scheduled Unit I refueling outage. A plan has been developed for wall l

removal with a minimum of disruption to Unit 1 operation.

1 During the period that the temporary wall is dismantled, Unit 1 is operating, and Unit 2 has not yet received an operating license, operation of the Unit 2 control room emergency filtration system (CREFS) must be restricted to assure

)

that the Unit 1 CREFS would be capable of performing its intended function, j

The Unit 2 outside air intake will be maintained closed during this period since the instrumentation in the flow path which initiates control room l

isolation will not be continuously operable.

Operation of the Unit 2 CREFS will be prevented to assure that, in the event of a Unit I control room initiation (CRI), operation of an excessive nunber of CREFSs will not lead to j

fan damage from unstable operation or unacceptable control room doses. The 4

i Unit 1 outside air flowpath is provided with two redundant chlorine detection l

systems and two redundant radiation monitoring systems. The chlorine detection l

systems are inoperable and the Unit 1 control room isolation dampers are maintained open as discussea in licensee event report 50-424/1987-044. Each safety injection signal for Unit I will initiate its associated CRI signal 3

thereby actuating the associated CREFS and isolating the normal HVAC system.

I

)

j gB2cono2800817 p

ADOCK 05000424 PNu I

1

i

-2~

Y The licensee proposes 4 notes to Technical Specification (TS) 3/4.7.6, "Control Room Emergency Filtration System" to accomplish the wall removal.

In support of notes 1 and 2, the licensee provided the following information Specific 611y, Note 1 would allow the control room HVAC supply and return headers, which are p*esently separated into Unit 1 and Unit 2 sections, to be connected together.

Connection of these headers allows balancing of both the Unit 1 and Unit 2 Control Room Emergency filtration Systems (CREFSs) for two-unit operation before making an opening in the temporary wall.

Dampers in the headers will enable isolation of the Unit 1 CREFS from the Unit 2 CREFS.

If a Unit 1 Control Room Isolation (CRI) signal is received, closure of the required isolation dampers and shutdown of any operating Unit 2 CREFS within 4.5 minutes would ensure Unit 1 control room pressurization in accordance with the Technical Specification bases.

Once Unit 1 CREFS balancing for two-unit operation has begun, it becomes necessary to re-establish system operability in accordance with Technical Specification 4.7.6.e.3.

Note 2 allows a temporary waiver of this operability verification to allow a reasonable amount of time for flow balancing, temporary wall panel removal, and re-testing of control room pressurization. The planned test sequence provides a high degree of assurance that the Unit 1 CREFS balancing for two-unit operation will be preceded by (1) Unit 2 control room )ressurization to 1/8 inch water gauge with 650 cfm outside air, and (2) Unit 2 CREFS flow balancing for two-unit operation with 1500 cfm outside air. Acceptable results i

from these tests would be a prerequisite for the proposed waiver.

The NRC staff has reviewed the above information and finds that note 1 is acceptable because action will be taken to ensure Vogtle Unit 1 control room pressurization within 4.5 minutes which will maintain radiation doses within acceptable limits. Also, the NRC staff finds that note 2 is acceptable because Vogtle Unit 2 will verify its control room pressurization capability prior to i

use of the 7 day waiver and Vogtle Unit 2 will be flow balanced for two-unit operation prior to use of the note 2 waiver to try and minimize the amount of i

time that the waiver will be needed.

In support of notes 3 and 4 the licensee provides the following inforr.ation:

The proposed notes restrict Yogtle Unit 2 CREFS operation during the period that the temporary wall is removed and Unit 2 has not yet received an operating license.

These restrictions are necessary to ensure proper operation of the Unit 1 CREFS.

Following removal of temporary wall panels and pressurization testing of the conbined control room, operation of the Unit 2 CREFS will not be required until receipt of the Unit 2 operating license.

If a Unit 1 CRI were to occur during operation of a Unit 2 CREFS, an excessive nurber of CREFSs in operation could lead to fan damage from unstable operation and operator radiation doses in excess of GDC 19 limits.

Unit 2 CREFS operation will tierefore be prevented during i

this period.

-3 Instrumentation in the Unit 2 outside air flow path which initiates CREFS operation will not be continuously operable until receipt of the Unit 2 operating license. At least one Unit 2 control room isolation damper must therefore be maintained closed.

If a Unit 1 CREFS is in operation, hcwever, these dampers may be open since automatic initiation would no longer be a concern.

Unit 1 control room isolation dampers must be maintained open in accordance with comitments made in LER 50-424/1987-044 The NRC staff has reviewed the above information and finds notes 3 and 4 acceptable because they prevent fan damage and maintain radiation doses within acceptable limits.

In addition, the proposed amendment revises the maximum control rcom air temperature from 80 to 85'F and revises the maximum control rooin pressurization flow from 850 to 1500 cfm.

The increase in temperature is needed due to the heat loads added when the Vogtle Unit 2 portion of the control room is included in the control room envelope. All equipment in the control room is designed to operate at temperatures greater than 85'F arbient air temperature. Therefore, the NRC staff concludes that this change is acceptable.

The increase in pressurization flow is needed due to the added volume of the Unit 2 portion of the control room.

Radiation doses are maintained within acceptable limits with the 1500 cfm flow. Therefore, the NRC staff concludes that this change is acceptable.

3.0 ENVIRONFENTAL CONSIDERATION This amendment involves a change in surveillance requirements.

The staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational exposure. The NRC staff has made a determination that the amendment involves no significant hazaros consideration, and there has been no public coment on such finding. Accordingly, the amendment meets the eli criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9)gibility Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.

4.0 CONCLUSION

j The Comission made a proposed determination that the einendment involves no significant hazards consideration which was published in the Federal Register on June 29, 1988. (53 FR 24510), and consulted with the state of Georgia.

No public coments were received, and the state of Georgia did not have any coments.

The staff has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safet endangered by operation in the proposed manner, and (2)y of the public will not be such activities will be conducted in ccmpliance with the Comission's regulations, and the issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public.

Principal Contributor: Jon B. Hopkins, PDil-3/DRP-1/II 1

Dated:

August 17, 1988

r i

DATED: anguet 17. 19AR AMENDHENT NO.

TO FACILITY OPERATING LICENSE NPF Vogtle Electric Generating Plant. Unit 1 D'STRIBUTION:

g h.y.-

+

y Local POR PDl!-3 R/F Vogtle R/F SVarga 14-E-4 Glainas 14-H-3 D. Matthews 14-H-25 MRood 14-H-25 JHopkins 14-H-25 DGC-WF 15-B-18 EJordan HNBB-3302 ACRS(10)(4)

TBarnhart P1-137 H-1016 WJones P-130A e

EButcher 11-F-23 s

GPA/PA 17-F-2 ARM /LFHB AR-2015 0Hagan MNBB-3302 EGrimes 9-A-2 JMiller 11-F-23 JCraig 8-D-1 JCunninghan PRPB l

a k

i i i 1

i l

t

..m.

... m.

-