ML20151V129
| ML20151V129 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 08/12/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20151V130 | List: |
| References | |
| EA-88-216, NUDOCS 8808220152 | |
| Download: ML20151V129 (3) | |
Text
i
'a as u se In Reply Refer To:
Dockets:
50-498 50-499 i
EA 88-216 Houston Lighting & Power Company ATTN:
J. H. Goldberg, Group Vice President, Nuclear P.O. Box 1700 Houston, Texas 77001 Gentlemen:
This refers to the investigation conducted by Mr. H. Brooks Griffin of the NRC Office of Investigations, Region IV Field Office, during the period January 29 through April 15, 1988, of activities authorized by NRC Operating License NPF-71 and Construction Permit CPPR-129 for the South Texas Project Units 1 and 2.
This investigation was conducted to determine whether contractor fire watch personnel at the South Texas Project (STP) were intentionally falsifying fire watch logs and, further, to determine whether licensee management was aware of or condoned the falsification. The findings of this investigation are summarized in the enclosed Synopsis to the Investigation Report.
During this investigation, it was found that certain of your. activities appeared to be in violation of NRC requirements. We will contact your staff to schedule an enforcement conference in the near future to discuss your understanding of this apparent violation, the reasons for cccurrence, and your corrective actions. We will also discuss any potential enforcement options available to the NRC, if appropriate.
Should you have any questions concerning this investigatiors, we will be pleased to discuss them with you.
Sincerely.
Onginal Signed By:.
A: B. DEACH L. J. Callan, Director m
48 Division of Reactor Projects
$ n.
Enclosure:
@o Appendix - Cover Page and Synopsis for NRC Investigation Report Case m,
Number 4-88-004 gg oB QC cc:
(see next page) m k
o
- RIV:C:PSD
- E0 D:
/
CHolleridf GFSanborn LJCTITan
/p 8/ /88 0/ /88 8/11/88 g g
- Previously concurred
l i
Houston Lighting & Power Company i l
[
i I
j cc' l
Houston Lighting & Power Cor.pany Newman & Holtzinger, P.C.
ATTN:
M. A. McBurnett, Manager ATTN:
J. R. Newman, Esquire l
Operations Support Licensing 1615 L Street, N.W.
P.O. Box 289 Washington, D.C.
20036 Wadsworth Texas 77483 Houston Lighting & Power Company
-ATTN: Gerald E. Vaughn, Vice President Nuclear Operations i
P.O. Box 289 Wadsworth, Texas 77483 l
Houston Lighting & Power Company 1
ATTN:
S. L. Rosen L
P.O. Box 289
}
Wadsworth, Texas 77483 Houston Lighting & Power Company ATTN:
J. T. Westermeier, General Manager
[
South Texas Project P.O. Box 289 Wadsworth, Texas 77483 3
Houston Lighting & Power Company ATTN:
R. W. Chewning, Chairman Nuclear Safety Review Board l
P.O. Box 289 Wedsworth Texas 77483 j
Central Power & Light Company ATTN:
R. L. Range /R. P. Verret L
P.O. Box 2121 Corpus Christi Texas 78403 j
5 City Public Service Board ATTN:
R. J. Costello/M. T. Hardt P.O. Box 1771
[
San Antonio, Texas 78296 City of Austin Electric utility i
c ATTN:
R. J. Miner, Chief Operating Officer i
721 Barton Springs Road Austin, Texas 78704 t
Houston Lighting & Power Company
[
ATTN: Licensing Representative Suite 610' Three Metro Center Bethesda, Maryland 20814 Texas Radiation Control Program Director
c f
Ilouston Lighting & Power Company
-3 bec to DM8 (IC01) bec distrib, by RIV:
DRP RRI-OPS R. D. Martin, RA DRS SectionChief(DRP/D)
RPB-DRSS MIS System RIV File Lisa Shea, RM/ALF RSTS Operator R. Bachmann, OGC D. Hunnicutt G. Dick, NRR Project Manager G. Cant OE G. F. Sanborn, E0 J. Liebernan, OE L. Chandler, Asst GC/0GC T. Martin, DEDRO J. Taylor. DEDRO i
-