Documents 880720 Meeting Re Proposed Recommendations Resulting from Mgt Assessment at Plant.List of Attendees Encl
ML20151V116
Person / Time
Site: Wolf Creek 
Issue date: 08/12/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
References
NUDOCS 8808220136
Download: ML20151V116 (3)


Text

-

l E !2 m In Reply Refer To:

Docket: STN 50-482 Wolf Creek Nuclear Operating Corporation ATTN:

Bart D. Withers President and Chief Executive Officer P.O. Box 411 Burlington, Kansas 66839 Gentlemen:

This documents the meeting _ held with you and members of your staff at the Wolf Creek training center on July 20, 1988. At this-meeting you discussed the proposed recommendations resulting from the management assessment performed by a consultant at your facility.

The list of atter. dees at this meeting are attached.

Sincerely, Onginal S&nd By:

A.B. BEACH L. J. Callan, Director Division of Reactor Projects Attached:

List of Attendees i

cc:

Wolf Creek Nuclear Operating Corporation ATTN: Otto Maynard, Manager of Licensing P.O. Box 411 Burlin0 ton, Kansas 66839 i

)

Wolf Creek Nuclear Operating Corporation ATTN:

Gary Boyer, Plant Manager P.O. Box 411 Burlington, Kansas C6839 m

Kansas Corporation Commission ggg ATTN:

Robert D. Elliott, Chief Engineer a

-o Fourth Floor. Docking State Office Building

@ a.

Topeka, Kansas 66612-1571 m8 Kansas Radiation Control Program Director 0

bectoDMB(IE45) 0 h

N" A

ig D[ua',4

'RA /

C:PSA gv h

)0 LJ lan RDNartin m e.a.

DDCha e lain;df 8/f/88 8/O/88 pf

/y i

-t a

Wolf Creek Nuclear Operating l Corporation i

bec distrib. by RIV:-

Myron Karman, ELD, MNBB RRI R. D. Martin, RA SectionChief(DRP/A)

DRP RPB-DRSS B. DeFayette, RIII RIV File Callaway, RIII Project Engineer, DRP/A G. F. Sanborn, EO _

Lisa Shea, RM/ALF P. O'Connor, NRR Project Manager DRS i

1 t

>g H i

-*g L

-List of Attendees NRC1 R. Martin, Regional Administrator J

J. Callan, Director, Division of Reactor Projects-J. Milhoan, Director Division of Reactor Safety D. Chamberlain, Chief, Project Section A B. Bartlett, Senior Resident Inspect 9r M. Skow, Resident Inspector-J. Calvo, Director, Project Directorate IV NRR P. O'Connor, Project Manager, NRR WCNOC B. Withers, Chief Executive Officer 1

i J. Brily, Vice President F. Rhodes, Vice President G. Boyer, Plant Manager

0. Maynard, licensing Manager

't I

i 1

i I

r l

i 1

-