ML20151U617

From kanterella
Jump to navigation Jump to search
Informs Util of NRC Interpretation of Section 10CFR50.74(a) Re Changes in Operator or Senior Operator Status
ML20151U617
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 08/11/1988
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
References
NUDOCS 8808190192
Download: ML20151U617 (1)


Text

_ _ _ _ _ _ _ _ _ -

p. 3 {ll-t t

AUG 111988 Mr. David W. Cockfield Vice President, Nuctear Portland General Electric Company 121 SW Salmon Street TB-17 Porticnd, Oregon 97204

Dear Mr. Cockfield:

Subject:

Notification of Changes in Operator or Senior Operator Status The purpose of this letter is to inform you of NRC's interpretation of Section 10 CFR 50.74(a), which states: "Permanent reassignment from the position for which the licensee has certified the need for a licensed operator or senior operator under 55.31(a)(3) of this chapter" regarding notificatie of changes in operator or senior operator status.

The requirement for notification to the NRC applies in the event that an operator is perinanently reassigned from a licensed position to an non-licensed position and there is no intent to return that operator to a licensed position.

If an operator goes from a licensed position to a non-licensed position (while in the non-licensed position the license can be maintained in an active or inactive status) and the possibility exists for future reassignment to a licensed position, then 50.74 does not apply, and notification is not required.

If you have any questions, please contact me at (415) 943-3868.

Sincerely, N

Robert J. Pate, Chief I

Reactor Safety Branch cc: Gary Ellis, Tro.'.'n R. Barr, RV SRI fp m,

PMorrill:jb JElin P

.We 08//0/88 08/d/88 08/g/88 N

U V

I COPY'

' YE /NO)

~

I I

o S

s 880fd190192 880811...

PDR ADOCK 0500094y g

V P94 e.

74 M2.,, '

i

_