Forwards Safety Insp Repts 50-456/88-21 & 50-457/88-21 on 880801-03.No Violations Noted
ML20151U578
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 08/12/1988
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20151U582 List:
References
NUDOCS 8808190179
Download: ML20151U578 (2)


See also: IR 05000456/1988021

Text

<

r s

i

.

-

l

.' j

l

'

!

l

AUG 11 1988

,

Docket No. 50-456

Docket No. 50-457

' Commonwealth Edison Comoany

ATTN: Mr. Cordell Reed

Senior ' lice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. T. Ploski and

others of this office on August 1-3, 1988, of activities at the Braidwood

Nuclear Generating Station, Units 1 and 2, authorized by Operating Licenses

No. NPF-72 and No. NPF-77, and to the discuesion of our findings with

Mr. K. Kofron at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective ,

examination of procedures and representative records, observations, and  :

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

ttis letter and the enclosed inspection report will be placed in the NRC .

Public Document Room. -

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

4

l$h O

O W. D. Shafer, Chief

Emergency Preparedeness and j

Radiological Prctection Branch  !

l Enclosure: Inspection Reports l

No. 50-456/88021(0RSS);  ;

No. 50-457/80021(ORSS)

,

see Attached Distribution 1

rib RIII II RIII RI '

i S

i/jlr

@y thf

Pattjson unt

Snell

.4 . -

Hind

,

i r

)\

e '

3/U

'

8/"/#I

6 ($

f

'

%:/6f.

i

<

___.-_--__----_.-_-__________-______-___--_______-.-_---__--_-_.-------__-_-____l

.

g..

.

.

-

..

Commonwealth Edison Company 2

Distribution

cc w/ enclosure:

T. J. Maiman, Vice Presidenc,

PWR Operations

H. Bliss, Nuclear

Licensing Manager

S. Hunsader, Nuclear

Licensing Administrator

M. Lohmann, Project Construction

and Startup Superintendent

R. E. Querto, Station Manager

P. L. Barnes, Regulatory

Assurance Supervisor

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

D. W. Cassel, Jr. , Esq.

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance .

Division

E. Chan, OGC

G. Berry, OGC

Stephen P. Sands, NRR

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

The Honorable Ivan W. Smith, ASLB

The Honorable Gary J. Edles, ASLAP

The Honorable Dr. W. Reed Johnson, ASLAP

The Honorable Christine N. Kohl, ASLAP

W. Travers, EPB, NRR

R. Hogan, EPB, NRR

W. Weaver, FEMA, RV

R. Landsman, RIII

- _ - - _ _ _ _ _ _ _ _ _ _ -