Requests Addl Info Re 871215 & 880629 Inservice Testing Program (Ist),Covering Allowable Ranges of IST Quantities for Pumps in Relation to Valves Tabulated in Table IWP-3100-2 of ASME Code,Section XI
ML20151U328
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 08/15/1988
From: Oconnor P
Office of Nuclear Reactor Regulation
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
References
NUDOCS 8808190038
Download: ML20151U328 (5)


Text

. _. . . _. .=

August 15, 1988

~

! Docket No. 50-482 Mr. Bart D. Withers President and Chief Executiva Officer i Wolf Creek Nuclear Operating Corporation Post Office Box 411 Burlington, Kansas 66839  !

Dear Mr. Withers-

SUBJECT:

REQUEST FOP. ADDITIONAL IFORMATION RELATED '

TO RELIEF REQUEST PR-11 (1AC NO 57359)

The NRC staff is continuing its review of your submittals dated December 15,

  • 1987 and June 29, 1988 regarding your Inservice Testing (IST) Program Relief Request PR-11. This relief request pertains to the allowable ranges of IST quantities for pumps in relation to the valves that are tabulated in Table IWP-3100-2 of the ASME Code,Section XI. To permit us to continue our review  ;

on our current schedule, we require the information requested in the enclosure to this letter be provided.

Please provide the requested information within 30 days of your receipt of this letter, ,

The reporting and/or recordkeeping requirements contained in this letter affeet fewer than ten respondents; therefore, OMB clearance is not required  ;

under P.L. 96-51.

Sincere,1y,  :

} Paul W. O'Connor, Project Manager  !

Project Directorate - IV i Division of Reactor Projects - III, i

) IV, V end Special Projects 1

j

Enclosure:

L i cc w/ enclosure.

See next page DISTRIBUTICN (Docket File Q NRC PDR Local POR PD4 Reading .

L. Rubenstein J. Calvo o Noonan P. O'Connor 1 OGC-Rockville E. Jordan B. G.'imes ACRS (10) l PO4 Plant Fila l PO4/LA PD4/PH fw*f PD4/0 f#s' l PNoopan IN PO'Coynor: sr JCalv3 4e 08/P /88 08/6/8J 08/(3/88 T h*

I I 815 l 660819003888 PDR ADOCK 05BOO 462 P PDC i 1

.. - .- .., .~. ~ .

i August 15, 1988 Docket No. 50-482 Mr. Bart D. Withers President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation Post Office Box 411 Burlington, Kansas 66839

Dear Mr. Withers:

SUBJECT:

REQUEST FOR ADDITIONAL IFORMATION RELATED TO RELIEF REQUEST PR-11 (TAC NO. 57359)

The NRC staff is continuing its review of your submittals dated December 15, 1987 and June 29, 1988 regarding your Inservice Testing (IST) Program Relief Request PR-11. This relief request pertains to the allowable ranges of IST quantities for pumps in relation to the valves that are tabulated in Table IWP-3100-2 of the ASME Code,Section XI. To permit us to continue our review on our current schedule, we require the information requested in the enclosure to this letter be provided.

Please provide the requested information within 30 days of your receipt of this letter.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; thuefore, OM8 clearance is not required under P.L. 96-51.

Sincer,ely, Paul W. O'Connor, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects

Enclosure:

cc w/ enclosure:

See ne t page DISTRIBb7 ION Docket File NRC PDR Local PDR PD4 Reading L. Rubenstein J. Calvo P. Noonan P. O'Connor DGC-Rockville E. Jordan B. Grimes ACRS (10)

PD4 Plant File PD4/LA PD4/PM f**f PD4/D fdPT PNoojan FN PO'Cornor: sr JCalv3 46 08/I'/88 08/15/88 08/th/88 Sh*

.' . g. u.w  ;

UNITED 3TATES  !

< 8 o,%

NUCLEAR REGULATORY COMMISSION i

,I w AsHINGTON, D. C, 20666 3 l

,c' August 15, 1988 k....

Docket No. 50-482 Mr. Bart D. Withers President and Chief Executive Officer Wolf Creek Nuclear Operating C rporation Post Office Box 411 Burlington, Kansas 66839

Dear Mr. Withers:

SUBJECT:

REQUEST FOR ADDITIONAL IFORMATION RELATED TO RELIEF REQUEST PR-11 (LAC NO. 57359)

The NRC staff is continuing its review of your submittals dated December 15, 198i and June 29, 1988 regarding yoJr Inservice Testing (IST) Program Relief Request PR-11. his

. relief request pertains to the allowable ranges of IST quantities for pumps in relation to the valves that are tabulated in Table 4

IWP-3100-2 of the ASME Code.Section XI. To permit us to continue our review on our current schedule, we cequire the information requested in the enclosure to this letter be provided. i Please provide the requested information within 30 days of your receipt of I this letter.  ;

The reporting and/or recordkeeping requirements contained in this letter  !

affect fewer than t2n respondents; therefore, OMB clearance is not required under P.L. 96-51.

Sincerely,

@J to.Ot

Paul W. O'Connor, Project Manager Project Directorate - IV Division of Reactor Projects - III.

IV, V and Special Projects

Enclosure:

cc w/ enclosure:

See next page l \

l l

I

4 4 .

  • . 1 Mr. Bart O. Withers Wolf Creek Generating Station '

Wolf Creek Nuclear Operating Corporation Unit No. 1 CC: i Jay Silberg, Esq. Mr. Gerald Allen Shaw, Pittman, Potts & Trowbridge Public Health Physicist 1800 M Street, NW Bureau of Air Quality & Radiation Washington, D.C. 20036 Control Division of Environment Chris R. Rogers, P.E. Kansas Department of Health Manager, Electric Department and Environment Public Service Comission Forbes Field Building 321 P. O. Box 360 Topeka, Kansas 66620 Jefferson City, Missouri 65102 Mr. Gary Boyer, Plant Manager Regional Administrator, Region III Wolf Creek Nuclear Operating Corp.

U.S. Nuclear Regulatory Comission P. O. Box 411 799 Roosevelt Road Burlington, Kansas 66839 Glen Ellya, Illinois 60137 Regional Administrator, Region IV Senior Resident Inspector / Wolf Creek U.S. Nuclear Regulatory Comission c/o V. S. Nuclear Regulatory Comission Office of Executive Director P. O. Box 311 for Operations Burlington, Kansas 66839 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 70011 Mr. Robert Elliot, Chief Engineer Utilities Division Mr. Otto Maynard, Manager Licensing Kansas Corporation Comission Wolf Creek Nuclear Operating Corp.

4th Floor - State Office Building P. O. Box 411 Topeka, Kansas 66612-1571 Burlington, Kansas 66839 l

l l

l l

l

\

i l

l

)

% i .

Enclosure

1. Copies of Head Curves for Fuel Pool Coolar t Pumps (PEC01A%B).

. 2. Fuel Pool Coolant Pumps (PEC01A&B) "Trending Graphs" with a P test data and A P reference values.

3. Reconfirm given design flow value of 32,500 gpm in a letter dated June 29, i 1988.
4. "Testing Conditions" in the following form:

Minimum /Maximus Proposed '

Pump Name Flow Head Limits Limit Fuel Pool (gpm) SiTd) (0.90/1.03x A P ref) TE5HiAPref) '

Coolant PEC01A "data" "data" "data" "data" PEC01B "data" "data" "data" "data" S. "Design Requirements" in the following form:

Ps'ap Name Flow Head Iuel Pool Coolar.t (gpm) @d)